summer, June-September (tiered at 250 kWh) — tier 1
up to 250 kWh
$0.16402
summer, June-September (tiered at 250 kWh) — tier 2
above baseline
$0.18858
all other months (flat)
all usage
$0.16402
What this figure does and does not include
Transcription notes recorded when this tariff was encoded, including anything deliberately left out.
DELIVERY ONLY. New York is restructured: a bill is delivery plus supply, and supply is substitutable - from an ESCO, a community choice aggregation, or the utility. This is the delivery half, which is filed, unambiguous, and identical for every customer whoever supplies them. A real bill will be higher.
There is no supply number to transcribe. The tariff sets supply by market price rather than by a filed rate, so encoding one would mean inventing it. This is why New York is delivery-only while ComEd and Massachusetts Electric, which do publish a default supply rate, are not.
EXCLUDED: 'Additional Delivery Charges and Adjustments, as specified in General Rule 26', plus the Market Supply Charge.
THE TIER STRUCTURE CHANGES BY SEASON, not just the rate. June through September is tiered - 16.402c for the first 250 kWh and 18.858c above it - and every other month is a single flat block at the same 16.402c. Copying the summer ladder into winter would invent a tier that does not exist. Georgia Power does the same thing with a 650 kWh boundary.
The 250 kWh summer tier boundary is the lowest in the catalogue, so a typical New York household crosses it every summer month.
Con Edison's delivery charge alone (16.4c) is higher than DTE's entire bundled rate, and this figure excludes supply.
NOT ENCODED: SC 1 Rate II, a voluntary time-of-day rate closed to new applicants since 1 March 2014. Its summer on-peak delivery charge is 51.09c against 5.26c off-peak - a 9.7x spread, by far the widest seen - but it cannot be signed up for, so pricing it would mislead.
Think a figure here is wrong?
Email support@rategrid.dev
with this plan's name and what the filed sheet says. Every rate on this page was
transcribed from the document linked above, so a report that quotes the sheet can
be checked against it and corrected.
Change history
The source document is fetched daily and every version is kept.
Utilities do not publish superseded rates, so this record does not exist
elsewhere once a rate changes.
No changes detected since monitoring began. The source sheet is checked daily.