by season and by usage tier · plus $21.00 per month · covers delivery only — delivery alone. Supply is set by market price with no filed figure, so a real bill is higher. NOT comparable to a bundled rate
effective2026-02-01
transcribed2026-08-20
today2026-10-06
Monthly delivery charge
Usage
all other months (flat)
summer, June-September (tiered at 250 kWh)
500 kWh
$103.01
$109.15
1,000 kWh
$185.02
$203.44
2,000 kWh
$349.04
$392.02
Computed from the rates on this page at 30.4 days a month. The same arithmetic is checked against the utility's own published typical bill on every build. Delivery only. Supply is bought separately and is not included, so a full bill is higher than this.
Before taxes, franchise fees and any local surcharge.
verifiedTranscribed from the utility's filed sheetCon Edison P.S.C. No. 10 - Electricity, Leaf 388, Revision 23
verifiedEffective date on the sheet: 2026-02-01
approximateNo published total to reconcile the whole rate againstNO CURRENT-VINTAGE TARGET EXISTS. The New York PSC publishes no equivalent of the Michigan PSC's bill comparison; it delegates, hosting links to each utility's own ten-year typical-bill chart. Con Edison's chart does sep
verifiedSource document checked daily for changes
approximateThis is not a whole billdelivery only — delivery alone. Supply is set by market price with no filed figure, so a real bill is higher. NOT comparable to a bundled rate
excludedTaxes, franchise fees and local surchargesJurisdiction-specific, so they are deliberately not encoded. A bill will be higher than this figure by that amount.
Energy rates
Period
Applies to
$/kWh
summer, June-September (tiered at 250 kWh) — tier 1
up to 250 kWh
$0.16402
summer, June-September (tiered at 250 kWh) — tier 2
above 250 kWh
$0.18858
all other months (flat)
all usage
$0.16402
What this figure does and does not include
Transcription notes recorded when this tariff was encoded, including anything deliberately left out.
DELIVERY ONLY. New York is restructured: a bill is delivery plus supply, and supply is substitutable - from an ESCO, a community choice aggregation, or the utility. This is the delivery half, which is filed, unambiguous, and identical for every customer whoever supplies them. A real bill will be higher.
There is no supply number to transcribe. The tariff sets supply by market price rather than by a filed rate, so encoding one would mean inventing it. This is why New York is delivery-only while ComEd and Massachusetts Electric, which do publish a default supply rate, are not.
EXCLUDED: 'Additional Delivery Charges and Adjustments, as specified in General Rule 26', plus the Market Supply Charge.
THE TIER STRUCTURE CHANGES BY SEASON, not just the rate. June through September is tiered - 16.402c for the first 250 kWh and 18.858c above it - and every other month is a single flat block at the same 16.402c. Copying the summer ladder into winter would invent a tier that does not exist. Georgia Power does the same thing with a 650 kWh boundary.
The 250 kWh summer tier boundary is the lowest in the catalogue, so a typical New York household crosses it every summer month.
Con Edison's delivery charge alone (16.4c) is higher than DTE's entire bundled rate, and this figure excludes supply.
NOT ENCODED: SC 1 Rate II, a voluntary time-of-day rate closed to new applicants since 1 March 2014. Its summer on-peak delivery charge is 51.09c against 5.26c off-peak - a 9.7x spread, by far the widest seen - but it cannot be signed up for, so pricing it would mislead.
Think a figure here is wrong?
Email support@rategrid.dev
with this plan's name and what the filed sheet says. Every rate on this page was
transcribed from the document linked above, so a report that quotes the sheet can
be checked against it and corrected.
Change history
The source document is fetched daily and every version is kept.
Utilities do not publish superseded rates, so this record does not exist
elsewhere once a rate changes.
No changes detected since monitoring began. The source sheet is checked daily.