Rate RS Residential Service, delivery plus Standard Service Offer generation
0.12583–0.17537$/kWh
by season and by usage tier · plus $10.59 per month · covers delivery and default supply — delivery plus the utility's default supply; a customer who buys supply elsewhere pays the delivery part only
effective2026-11-02
transcribed2026-11-13
Monthly bill on default supply
Usage
January to May and October to December
June to September
500 kWh
$98.28
$98.28
1,000 kWh
$185.96
$185.96
2,000 kWh
$312.82
$361.34
Computed from the rates on this page at 30.4 days a month. The same arithmetic is checked against the utility's own published typical bill on every build. Delivery plus this utility's default supply. A customer who switched supplier pays the delivery part and their supplier's rate instead.
Before taxes, franchise fees and any local surcharge.
Provenance
reconciled to a published total
sourceP.U.C.O. Electric No. 19, Sheet No. 30.18 Rate RS Residential Service, with Sheet No. 85.2 Applicable Riders and every rider sheet it lists for RS, plus Sheet No. 107.02 Rider DSMR
docketRate RS: Case No. 21-887-EL-AIR, Order 2022-12-14, effective 2023-01-03. Riders carry their own cases and dates; the latest are UE-GEN, UE-ED and DSR, effective 2026-11-02.
verifiedTranscribed from the utility's filed sheetP.U.C.O. Electric No. 19, Sheet No. 30.18 Rate RS Residential Service, with Sheet No. 85.2 Applicable Riders and every rider sheet it lists for RS, plus Sheet No. 107.02 Rider DSMR
verifiedEffective date on the sheet: 2026-11-02
verifiedReconciles to a total the utility published itselfEXACT ON BOTH HALVES. Supply: RC + RE + AER-R + SCR = 0.104949 $/kWh, PUCO's $0.1049 residential Price to Compare for 2026-10-01 through 2026-11-30. Delivery: Duke's own Rate RS bill calculator (2026-rs-web-calculator.xl
verifiedSource document checked daily for changes
approximateThis is not a whole billdelivery and default supply — delivery plus the utility's default supply; a customer who buys supply elsewhere pays the delivery part only
excludedTaxes, franchise fees and local surchargesJurisdiction-specific, so they are deliberately not encoded. A bill will be higher than this figure by that amount.
Energy rates
Period
Applies to
$/kWh
June to September — tier 1
up to 2,000 kWh
$0.17537
June to September — tier 2
up to 15,000 kWh
$0.17491
June to September — tier 3
above 15,000 kWh
$0.17435
January to May and October to December — tier 1
up to 1,000 kWh
$0.17537
January to May and October to December — tier 2
up to 2,000 kWh
$0.12685
January to May and October to December — tier 3
up to 15,000 kWh
$0.12639
January to May and October to December — tier 4
above 15,000 kWh
$0.12583
Other plans at this utility
Encoded from the same tariff book, on the same day. Which one
you are on is on your bill; which one you are eligible for is set by the
utility, not by this page.
Transcription notes recorded when this tariff was encoded, including anything deliberately left out.
DELIVERY PLUS DEFAULT SUPPLY. Ohio is restructured: a customer buys delivery from Duke Energy Ohio and may buy generation from a certified supplier instead of the Standard Service Offer. A SHOPPING CUSTOMER DOES NOT PAY THIS FIGURE - they pay the delivery half plus their supplier's price.
THE SUPPLY HALF IS RIDERS RC, RE, AER-R AND SCR and sums to 10.4949c for the first 1,000 kWh in winter, PUCO's published $0.1049 Price to Compare for 2026-10-01 through 2026-11-30. Rider UE-GEN is on the delivery side despite its name - it recovers uncollectible generation expense from every customer, and the reconciliation only holds without it.
SEASONAL, ON SUPPLY ONLY. Summer is the four revenue months June through September. In winter Rider RC drops from 3.3362c to 1.8339c and Rider RE from 8.1218c to 4.7724c above 1,000 kWh a month; in summer both are flat. That winter step is a declining block and is the filed design, not a transcription error.
FOUR RIDERS ARE PERCENTAGES OF BASE DISTRIBUTION (ETCJA -2.750%, ESRR +2.440%, DCI +18.624%, DR-ECF +0.960%), each applied to 'customer charge plus base distribution charge'. They are folded into the fixed charge and the per-kWh rate here; Duke's own calculator computes them the same way.
RIDER DSMR (Sheet 107.02, 0.0317c/kWh, effective 2026-09-01) IS BILLED BUT NOT ON THE RIDER MATRIX. Sheet 85.2 was issued in November 2024 and lists twenty riders for RS; Duke's bill calculator charges DSMR to every residential customer, shopping or not. It is included. A future reissue of Sheet 85 should list it; if it does not appear and the calculator drops it, re-read.
THE OHIO kWh TAX IS INCLUDED (Rider OET: 0.465c, 0.419c, 0.363c across 2,000 and 15,000 kWh a month), as for every Ohio tariff here. It and the winter supply step are the only blocks.
RIDER BTR NETS ITS RTEP CREDIT: 1.3150c less 0.0406c. Riders SGF, LGR and EE-PDRR are filed at zero; Rider PSR was withdrawn effective 2025-06-01 and is not billed.
THREE RIDERS MOVED ON 2 NOVEMBER 2026 - UE-GEN (0.0897c to a 0.0704c credit), UE-ED (0.2205c to 0.1415c) and DSR ($0.03 to $0.18). This encoding is the post-2-November state; October bills used the earlier values.
Think a figure here is wrong?
Email support@rategrid.dev
with this plan's name and what the filed sheet says. Every rate on this page was
transcribed from the document linked above, so a report that quotes the sheet can
be checked against it and corrected.
Change history
The source document is fetched daily and every version is kept.
Utilities do not publish superseded rates, so this record does not exist
elsewhere once a rate changes.
No changes detected since monitoring began. The source sheet is checked daily.