Service Classification RS Residential Service, delivery plus Basic Generation Service
0.18546–0.25431$/kWh
by season and by usage tier · plus $4.27 per month · covers delivery and default supply — delivery plus the utility's default supply; a customer who buys supply elsewhere pays the delivery part only
effective2026-10-01
transcribed2026-10-08
today2026-10-11
Monthly bill on default supply
Usage
January to May and October to December
June to September
500 kWh
$109.62
$97.00
1,000 kWh
$214.98
$217.27
2,000 kWh
$425.68
$471.58
Computed from the rates on this page at 30.4 days a month. The same arithmetic is checked against the utility's own published typical bill on every build. Delivery plus this utility's default supply. A customer who switched supplier pays the delivery part and their supplier's rate instead.
Before taxes, franchise fees and any local surcharge.
Provenance
no published total to check against
sourceBPU No. 14 ELECTRIC - PART III, Service Classification RS Residential Service, 2nd Rev. Sheet No. 3 and 5th Rev. Sheet No. 4, with Rider NGC (2nd Rev. Sheet 47), Rider SBC (6th Rev. Sheet 50), Rider ENJ (1st Rev. Sheet 66) and the Rider BGS-RSCP TEC list (14th Rev. Sheet 42), all in 'Tariff Part III Effective 10-1-26'
docketBoard Orders dated 2026-09-24: Docket No. EO25100570 (Rider ENJ, RS item 6 on sheet 4), ER26060356 (Rider SBC and the index) and ER24120874 (Rider NGC); sheets issued 2026-09-29 and 2026-09-30, effective 2026-10-01. Sheet 3 is unchanged from the July edition (2nd Rev., effective 2026-07-15) and Rider BGS-RSCP energy rates still run 2026-06-01 through 2027-05-31.
verifiedTranscribed from the utility's filed sheetBPU No. 14 ELECTRIC - PART III, Service Classification RS Residential Service, 2nd Rev. Sheet No. 3 and 5th Rev. Sheet No. 4, with Rider NGC (2nd Rev. Sheet 47), Rider SBC (6th Rev. Sheet 50), Rider ENJ (1st Rev. Sheet 66) and the Rider BGS-RSCP TEC list (14th Rev. Sheet 42), all in 'Tariff Part III Effective 10-1-26'
verifiedEffective date on the sheet: 2026-10-01
approximateNo published total to reconcile the whole rate againstNO PUBLISHED TOTAL EXISTS AT THE OCTOBER 2026 RATES. The only published JCP&L total is the 2026-08-06 testimony Monthly Bill Comparison ($40.43 delivery + $121.87 BGS = $162.30), which is built on the 7/15/2026 tariff, a
verifiedSource document checked daily for changes
approximateThis is not a whole billdelivery and default supply — delivery plus the utility's default supply; a customer who buys supply elsewhere pays the delivery part only
excludedTaxes, franchise fees and local surchargesJurisdiction-specific, so they are deliberately not encoded. A bill will be higher than this figure by that amount.
Energy rates
Period
Applies to
$/kWh
June to September — tier 1
up to 600 kWh
$0.18546
June to September — tier 2
above 600 kWh
$0.25431
January to May and October to December
all usage
$0.21071
What this figure does and does not include
Transcription notes recorded when this tariff was encoded, including anything deliberately left out.
DELIVERY PLUS DEFAULT SUPPLY. New Jersey is restructured: a customer buys delivery from JCP&L and may buy supply from a third-party supplier instead of Basic Generation Service. A SHOPPED CUSTOMER DOES NOT PAY THIS FIGURE - they pay the delivery half plus their supplier's price.
ALL RATES INCLUDE NEW JERSEY SALES AND USE TAX. Rider SUT folds a 1.0662 factor into every rate JCP&L prints, and each sheet labels its figures 'including SUT'. This catalogue normally excludes tax; here the tax is inside the utility's own published rate and cannot be separated without re-deriving every sheet. AEP Ohio is the only other tax-inclusive tariff in the catalogue.
Customer and Distribution charges also include the New Jersey Corporation Business Tax, per Rider CBT.
TREC IS A COMPONENT OF RIDER RRC, NOT AN ADDITIONAL CHARGE. Rider RRC prints a 0.4729 c/kWh total and a 0.2095 c/kWh TREC rate; the sheet's six component rates sum exactly to the total, and the March 2026 RRC filing calls them 'the Rider RRC and six component rates'. Adding TREC on top would overstate a typical bill by $1.61 a month.
THE TEC SURCHARGES STACK ACROSS THREE EFFECTIVE DATES. Rider BGS-RSCP lists transmission enhancement charges under 2021-12-15, 2026-07-15 and 2026-10-01. These are not three revisions of one list - no surcharge name repeats, because each block adds a different set of PJM transmission owners. All 21 are in force and sum to 0.4059 c/kWh. Reading only the newest block understates a typical bill by $3.11 a month.
THE ENCODED RATE INCLUDES THE BGS RECONCILIATION CHARGE (0.4441 c/kWh); THE RECONCILIATION CHECK EXCLUDES IT. JCP&L's Monthly Bill Comparison footnotes itself as 'excluding BGS Reconciliation' so that four New Jersey utilities can be compared on equal terms, but Service Classification RS item 1 charges 'BGS Energy and Reconciliation Charges' and a real customer pays it. The two figures are deliberately different.
THE SUMMER BLOCK INCREASES, WHICH IS THE REVERSE OF THE USUAL RESIDENTIAL SHAPE. June through September, distribution runs 2.0182 c/kWh for the first 600 kWh and 7.9810 c/kWh above it - nearly four times - so a high-usage summer month is far dearer per kWh than a low-usage one. October through May is flat. Both the distribution and the BGS energy charge break at the same 600 kWh.
SEPARATELY METERED WATER HEATING IS NOT ENCODED. The RS special provisions bill off-peak and controlled water heating through a second meter at their own rates, with a $2.23 supplemental customer charge. That is a distinct service, not a variant of this one.
Rider EV is listed by the tariff as item 8) but prices nothing: it is a voluntary program for customers installing a qualified Level 2 charger. It is carried in APPLICABLE_RIDERS with a None rate so that an audit of the numbered list can account for every item.
RIDER RP IS NOW RIDER ENJ, AND NGC TURNED POSITIVE. From 2026-10-01 the Reliability Plus Charge is renamed JCP&L EnergizeNJ and RS pays 0.0135 c/kWh instead of zero, and the MTC/NGC factor moves from a credit of 0.0234 c/kWh to a charge of 0.0312 c/kWh. Rider ZEC is the only RS credit left among the applicable riders.
NOT RECONCILED. NO PUBLISHED TOTAL EXISTS AT THESE RATES; see _provenance.not_reconciled. The figures are the filed sheets and the total is bridged from the July vintage, which does reconcile.
Think a figure here is wrong?
Email support@rategrid.dev
with this plan's name and what the filed sheet says. Every rate on this page was
transcribed from the document linked above, so a report that quotes the sheet can
be checked against it and corrected.
Change history
The source document is fetched daily and every version is kept.
Utilities do not publish superseded rates, so this record does not exist
elsewhere once a rate changes.