Notes that apply to every Sierra Pacific Power Company plan
Recorded when these tariffs were encoded, including anything deliberately left out. Notes specific to one plan are on that plan's page.
Sierra Pacific Power Company dba NV Energy - NORTHERN Nevada only (Reno, Sparks, Carson City). Nevada Power dba NV Energy serves the south under a separate tariff with different rates. The two share a brand and a website and are not interchangeable.
Sierra Pacific calls residential service DOMESTIC service. There is no schedule with 'Residential' in its name; the only matches for that word in the filed sheet are electric-vehicle riders.
Every bundled rate is the sum of eight filed components: BTGR, BTER, DEAA, TRED, UEC, NDPP, ESAP and EE. DEAA is a credit, filed in parentheses; the REPR credit column was removed in the 111th Revised sheet. Unlike Nevada Power in the south, EE varies by schedule as well as BTGR - D-1 pays 0.00223 and DM-1 pays 0.00236 - so the components are listed per schedule rather than shared.
RESOLVED 2026-11-20. The October 2026 bill insert had disagreed with the 110th Revised Statement of Rates on TRED, EE, ESAP and REPR (insert D-1 total 0.11386, Statement 0.11275). The 111th Revised PUCN Sheet No. 63G (Advice No. 691-E-R, effective 2026-10-01) adopts the insert's figures - TRED 0.00064, ESAP 0.00004, EE 0.00223 (DM-1 0.00236), and no REPR column - and its own D-1 Total Rate is 0.11386. Encoded to the 111th Revised sheet; the 13 Oct encoding was 0.00111 $/kWh low on D-1.
Each rate below is built by summing those components and is asserted at build time against the Total Rate column the utility prints on the same row. The published total is a check, never the source. D-1 and DM-1 are also asserted against the October 2026 bill insert's Total Effective Rate.
EXCLUDED: Nevada state and local taxes, franchise fees, and the Excess Energy Credit referenced in note 12 of the filed sheet.
Estimates only. Excludes taxes,
franchise fees, medical baseline, FERA and annual true-up. Not a bill.