Transcription notes recorded when this tariff was encoded, including anything deliberately left out.
Fourteen riders apply to Schedule 1 and they are 62% of the marginal energy price: 0.10981 $/kWh of riders and non-bypassable charges against 0.06 $/kWh of base rates. Encoding the filed schedule alone would understate every bill by roughly three-fifths.
The Exhibit of Applicable Riders lists names and effective dates but no amounts, and omits four riders the bill charges: CCR, CE, OSW and RPS. Amounts come from Dominion's own bill calculator worksheet, which carries every rider as a number.
Distribution is filed under separate summer and winter headings carrying identical rates. That is the filing, not a transcription error. Only generation varies by season.
Reconciled against Dominion's bill calculator evaluated at three points. Press coverage quotes a typical 1,000 kWh bill of $149.92 'as of July 1'; that figure predates the Deferred Fuel Cost Charge effective 08-01-26 and is not a usable target.
INCLUDED as non-bypassable charges the customer pays: the Deferred Fuel Cost Charge, the PIPP universal service fee (currently zero) and the sales and use surcharge.
EXCLUDED: Virginia state, special regulatory and local consumption taxes, which vary by locality - $1.57 on a 1,000 kWh bill.
Think a figure here is wrong?
Email support@rategrid.dev
with this plan's name and what the filed sheet says. Every rate on this page was
transcribed from the document linked above, so a report that quotes the sheet can
be checked against it and corrected.
Change history
The source document is fetched daily and every version is kept.
Utilities do not publish superseded rates, so this record does not exist
elsewhere once a rate changes.
No changes detected since monitoring began. The source sheet is checked daily.