RateGrid

rates / PacifiCorp

PacifiCorp

Rocky Mountain Power Schedule 1 Residential Service, bundled with all applicable adjustment schedules

0.097950.14100$/kWh

by season and by usage tier · plus $12.30 per month · covers the full bill — everything the utility bills for energy - directly comparable to another bundled rate

effective2026-08-10transcribed2026-08-26today2026-08-27

Provenance

reconciled to a published total
sourceP.S.C.U. No. 52, Schedule 1 Residential Service, bundled with the adjustment schedules the Utah Price Summary bills
docketDocket No. 24-035-04 (sheet 1.1, customer charge); Docket No. 26-035-T08 (sheet 1.2, energy charges and Schedule 92).
effective2026-08-10
retrieved2026-08-26
regulatorPublic Service Commission of Utah
labelpacificorp-ut-1-2026-08-10
watcheddaily, every version kept
documenthttps://www.rockymountainpower.net/content/dam/pcorp/documents/en/rockymountai…

Confidence

Energy rates

PeriodApplies to$/kWh
period 1 — tier 1up to 400 kWh$0.09795
period 1 — tier 2above baseline$0.12478
period 2 — tier 1up to 400 kWh$0.11069
period 2 — tier 2above baseline$0.14100

What this figure does and does not include

Transcription notes recorded when this tariff was encoded, including anything deliberately left out.

Think a figure here is wrong?

Email support@rategrid.dev with this plan's name and what the filed sheet says. Every rate on this page was transcribed from the document linked above, so a report that quotes the sheet can be checked against it and corrected.

Change history

The source document is fetched daily and every version is kept. Utilities do not publish superseded rates, so this record does not exist elsewhere once a rate changes.

No changes detected since monitoring began. The source sheet is checked daily.

Use this in code

curl -X POST https://rategrid.dev/calculate \
  -H "X-API-Key: YOUR_KEY" -H "Content-Type: application/json" \
  -d '{"tariff_label": "pacificorp-ut-1-2026-08-10", "load_kwh": [ ...8760 values... ]}'

Get a free API key — no card required.

Estimates only. Excludes taxes, franchise fees, medical baseline, FERA and annual true-up. Not a bill.