A change is filed but not yet in force. The rate served today is the one being billed today; the encoding below starts serving itself on its effective date, with no deploy.
| Plan in force | Source | Takes effect | Becomes |
|---|---|---|---|
ppl-rs-2026-07-01 | pplelectric.com/Rate-Schedule-RS-Residential-Service.pdf | 2026-12-01 | ppl-rs-2026-12-01 |
These are serving rates we already know predate a filing. Shown because you should not have to guess.
13 document(s) across 13 plan(s). A plan appears once per changed document, so the same plan can be listed more than once.
| Plan | Source | Change detected | Encoded from |
|---|---|---|---|
pacificorp-wa-16-2026-10-01 | pp_wa_price_summary | 2026-11-07 | 2026-08-26 |
nstar-r1-cape-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1-cape-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1-mainland-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1-mainland-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-cape-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-cape-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-mainland-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-mainland-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-cape-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-cape-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-mainland-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-mainland-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
Two denominators, because one of them alone would mislead. 79,866,676 of 143,144,185 US residential customers is 55.8%. The same catalogue is 100.0% of the 79,866,676 customers served by the 50 largest utilities by residential customers (49 groups, 53 operating companies), which is where the work has deliberately gone — the country has 1,267 utilities selling residential electricity, and most of them are small municipals and co-ops.
Counted from EIA Form 861, 2024 data year, Sales_Ult_Cust (residential customer count), regenerated 2026-08-31. Customer counts are a census of households served, not of the plans encoded: a utility counts once it has a residential tariff here, whatever else it also files.
2 further utilities are encoded and serving but cannot appear in any of these figures: Oncor (TX, wires only), CenterPoint Energy Houston. Texas is deregulated, so EIA attributes those households to the retailers that sell them energy rather than to the wires company every one of them pays.
Every time a watched rate sheet stops matching the version the served rates were taken from. The monitor compares bytes, so it cannot tell a re-filed rate from a re-rendered PDF - both are real changes to the document and only one needs the rates re-derived. The outcome column says which, and a row that changed no rate is kept rather than hidden.
Showing the 71 most recent of 247. Show 247, or fetch the whole log as JSON from /changes (needs a key).
| Detected | Affects | Change | Outcome |
|---|---|---|---|
| 2026-11-12 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3,352,279 -> 3,354,566 bytes, +2,287) · 3bfafeaabffd → 7899fc8bb4b8 | no rate change PSCo's rate book replaced Sheet 70 (Schedule TG, transmission-voltage service) under Advice 2037, effective 13 November: one new customer-specific charge, Metro Denver Sewage $8,140. No other charge changed, and no encoded PSCo plan (R, R-OO, RE-TOU, SG) takes Schedule TG. |
| 2026-11-10 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (1,521,110 -> 1,598,047 bytes, +76,937) · 5b5c104d9760 → e08ae6c67804 | no rate change Xcel (NSP-Minnesota) re-filed Section 5 residential sheets effective 1 Oct 2026 with revision markers and rider notes moved. Every rate figure is unchanged, already encoded from 2 Oct; no rate moved and no re-encoding is needed. |
| 2026-11-10 | oconomowoc-rg1-2026-07 | content changed (157,988 -> 157,654 bytes, -334) · 51e8c29be0ba → c4310e32bc62 | no rate change City of Oconomowoc's Public Utilities web page was re-rendered; the only text change is a removed 'Photo Gallery' navigation link. No rate or figure changed, so the Oconomowoc RG-1 encoding is unchanged. |
| 2026-11-08 | dominion-va-schedule-1-2026-11-01 | content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97 | no rate change Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change. |
| 2026-11-07 | pacificorp-wa-16-2026-10-01 | content changed (155,983 -> 155,972 bytes, -11) · 1ff578e6b713 → 6a9564c85203 | change seen, not confirmed by a published source Pacific Power's Washington price summary dated 7 November lowers Schedule 97 (power cost adjustment) from 2.462c to 1.450c/kWh, Schedule 16 combined 14.343c to 13.331c (-$10.12 on 1,000 kWh). The filed Schedule 97 sheet still shows 2.462c; awaiting it before re-encoding. |
| 2026-11-07 | pacificorp-or-4-2026-10-31 | content changed (123,482 -> 125,238 bytes, +1,756) · eda6d9973168 → 9929ce6078c1 | re-encoded Pacific Power Oregon Schedule 92 rose from $2.64 to $4.26 a month for residential customers from 31 October (filed Sheet 92-1, Third Revision). Encoded with the rest of the 31 October Schedule 4 change. |
| 2026-11-07 | ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01 | content changed (108,052 -> 108,334 bytes, +282) · 9ada1bdf55f0 → 23a73f278bee | no rate change LADWP residential rates page re-rendered: the only text change is a deleted TOU contact-phone sentence. No figure moved at any precision and no applicability list changed. Encodings for R-1A zones 1 and 2 are unchanged. |
| 2026-11-07 | apco-wv-rs-2026-09-01 | content changed (168,488 -> 171,249 bytes, +2,761) · 466da6c91dcc → c2a97fef283e | no rate change APCo West Virginia relinked its tariff book for 1 November: the Consumer Rate Relief Charge rose 0.290c to 0.321c, but it is embedded in the unchanged ENEC rate, and the 1 November typical bill is still $183.07 at 1,000 kWh. No billed residential rate moved. |
| 2026-11-07 | dominion-va-schedule-1-2026-11-01 | content changed (219,572 -> 219,315 bytes, -257) · 66909d264e97 → 3319327f49c7 | no rate change Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates. |
| 2026-11-06 | jcpl-rs-2026-10-01 | content changed (80,414 -> 83,506 bytes, +3,092) · 4e62964bb618 → 19f2fb479870 | no rate change JCP&L's regulatory page changed only its 'Last Modified' date (2 Sep to 5 Nov 2026), a page-loading notice and a stylesheet. No figure moved and no linked document was added or removed; the encoding is unchanged. |
| 2026-11-05 | nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01 | content changed (84,844 -> 88,067 bytes, +3,223) · ac507a4377f9 → 37985e3fa1fd | no rate change Eversource reformatted its Greater Boston rate page: charges reordered and relabelled, explicit $0.00000 rows added on commercial schedules, and the 0.008c planning factor now also listed for R-1HP summer, which the encoding already carries. No R-1, R-1HP or R-3 figure moved. |
| 2026-11-04 | coned-sc1-2026-02-01 | content changed (65,457,729 -> 65,369,690 bytes, -88,039) · 3a1eb6b324d7 → 0caeb2705a77 | no rate change Con Edison removed a stale duplicate page from its tariff book: Leaf 249.4.3 Revision 6 (Rider R, community solar crediting text, superseded in February) had been printed alongside the current Revision 8. No rate figure moved; SC1 is unchanged. |
| 2026-11-04 | oncor-residential-2026-10-04 | content changed (3,886,275 -> 3,890,589 bytes, +4,314) · 5e9cd16c4f98 → 404c87f71e57 | no rate change Oncor re-exported its retail delivery tariff PDF. The extracted text is identical character for character, so no rate, schedule or applicability changed. The encoding is unchanged. |
| 2026-11-04 | entergy-texas-rs-2026-11-01 | content changed (53,229 -> 53,565 bytes, +336) · 3d66fb09bf08 → 38b66da54be5 | re-encoded Entergy Texas's November sample bill adds Schedule GCRR at 1.0493c/kWh (+10.49 on 1,000 kWh) and drops the zero SCO and RCE-5 lines; total 157.65 to 168.14. Re-encoded as a November vintage; it rebuilds 168.14 exactly. |
| 2026-11-04 | entergy-neworleans-res25-2026-11-01 | content changed (52,947 -> 53,348 bytes, +401) · 319dd8d800ae → 201f419170c9 | already encoded Entergy New Orleans's November sample bill moved PPCR 3.0287% to 3.2156%, SSCRII 5.3577% to 5.5698% and fuel 1.6246c to 1.2797c; total 152.65 to 144.21. All already encoded on 2 Nov; the encoding rebuilds 144.21 exactly. |
| 2026-11-04 | entergy-mississippi-rs40c-2026-10-01 | content changed (54,910 -> 54,916 bytes, +6) · 0744ae2279cf → 5bb3849cdd91 | no rate change Entergy Mississippi's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision and the total is still 164.39. No rate moved; the encoding is unchanged. |
| 2026-11-04 | entergy-louisiana-rs-2026-11-01 | content changed (58,000 -> 58,006 bytes, +6) · 7241de462a91 → 40a8bb19b01c | already encoded Entergy Louisiana's November sample bill shows fuel adjustment 2.748c to 2.688c and EAC 0.0047c to 0.0034c, total 146.19 to 145.57. Both were already encoded on 2 Nov; the November vintage now rebuilds 145.57 within a cent. |
| 2026-11-04 | entergy-arkansas-rs-2026-08-01 | content changed (54,675 -> 54,677 bytes, +2) · 887245daa462 → dc9ef9df9cf6 | no rate change Entergy Arkansas's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision, and the total is still 143.81. No rate moved; the encoding is unchanged. |
| 2026-11-03 | oncor-residential-2026-10-04 | content changed (88,333 -> 86,747 bytes, -1,586) · dcc63098a028 → 628c8d85af2b | already encoded The PUCT comparison page moved to 1 November and now shows Oncor at 6.8673c/kWh, the 4 October rates already encoded. Its AEP Texas rows also moved; AEP Texas is not encoded. No encoded rate changes. |
| 2026-11-03 | ppl-rs-2026-07-01, ppl-rs-2026-12-01 | content changed (6,882,495 -> 6,883,127 bytes, +632) · e5bfc29c7882 → 27493d722e4c | re-encoded PPL's Price to Compare rises 13.079c to 14.428c/kWh on 1 December (GSC-1 0.10133 + TSC 0.04295, Supplements 5 and 6 to Tariff No. 202), about +$13.49 on 1,000 kWh. Encoded for that date and reconciled to PPL's posted figure; current rates unaffected until then. |
| 2026-11-03 | pacificorp-or-4-2026-10-31 | content changed (517,600 -> 560,401 bytes, +42,801) · 293897778e42 → dae38c4f5cd5 | re-encoded Pacific Power Oregon Schedule 4 re-encoded from the 31 October price summary: combined 14.499c to 14.128c/kWh (Schedules 94, 190, 203, 206) and Schedule 92 $2.64 to $4.26 a month, about -$1.75 on 900 kWh. Schedules 94, 190 and 203 are not yet on their filed sheets; watched. |
| 2026-11-03 | oge-ok-r1-2026-11-01 | content changed (649,815 -> 652,139 bytes, +2,324) · c37ec7aa2640 → 3e64f2c5f190 | no rate change OG&E's tariffs page added 'REP 2027' pricing for its Renewable Energy Program (sheet 51.91), a programme not in the encoded rate. No encoded rider moved. |
| 2026-11-03 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (148,562 -> 149,026 bytes, +464) · afdcc0d82b03 → efa6a44c8ef2 | re-encoded LIPA posted Power Supply Charge Statement 119 for November: the base supply charge rose 13.9200c to 14.2906c/kWh, about +0.37c on every kWh (+$3.72 on 1,000 kWh at rate 180). Encoded on all four SC1 plans from 1 November; the statement's own printed per-rate-code figures are reproduced. |
| 2026-11-03 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (123,934 -> 123,935 bytes, +1) · 4295f93534b7 → 6361f57a6fcc | no rate change LIPA linked Value Stack Credit statement VSC-104 for November in place of VSC-103. Value Stack credits compensate exported distributed generation and are not part of the encoded SC1 bills; the tariff book link is unchanged. No encoded rate moved. |
| 2026-11-03 | duke-carolinas-sc-rs-2026-11-01 | content changed (124,196 -> 109,860 bytes, -14,336) · b56508f6980a → 30b702e4a70d | re-encoded Duke Energy Carolinas' SC Schedule RS rose 0.5799c on both tiers from 1 November (13.8125/14.4661c to 14.3924/15.0460c), the annual fuel order. Re-encoded from that date; Duke publishes no SC sample bill to reconcile against. |
| 2026-11-03 | duke-carolinas-sc-rs-2026-11-01 | content changed (126,395 -> 119,395 bytes, -7,000) · 6f91b0d3cc75 → 7648cbd56a33 | re-encoded Duke Carolinas SC Leaf 50C: residential fuel 2.8854c to 3.4622c/kWh (already inside the Schedule RS base, which rose to match) and the DERP monthly charge $0.52 to $0.11, from 1 November. Re-encoded with Schedule RS. |
| 2026-11-03 | duke-in-rs-2026-11-01 | content changed (80,480 -> 85,434 bytes, +4,954) · 35fdd555719f → da0782ef9143 | re-encoded Duke Energy Indiana's Q4 tracker table added a November row for Tariff 65 (T&D infrastructure): residential 0.000929 to 0.000111 $/kWh, -$0.82 on 1,000 kWh. Re-encoded for bills from November; no sample bill at this vintage to reconcile against. |
| 2026-11-03 | apco-va-rs-2026-11-01 | content changed (179,299 -> 181,012 bytes, +1,713) · 550f1eec6b7a → 8c067a2411ae | re-encoded APCo Virginia's November 1 update cut Rider P.I.P.P. from 0.132c to 0.082c/kWh, taking Schedule R.S. from 16.189c to 16.139c (-$0.50 on 1,000 kWh). Re-encoded from 1 November and reconciled to APCo's published $169.35 typical bill. |
| 2026-11-03 | oncor-residential-2026-10-04 | content changed (276,445 -> 88,575 bytes, -187,870) · 8e5a29b689b3 → 7c30455e00d4 | already encoded The PUCT's Oncor report as of November 1 prints $0.068673/kWh and $72.73 at 1,000 kWh - the 4 October tracker rates already encoded. No new rate moved; that vintage now reconciles exactly to a published total. |
| 2026-11-03 | centerpoint-houston-residential-2026-09-30 | content changed (269,441 -> 87,065 bytes, -182,376) · 1b60f48c2b43 → 61f220fa722e | no rate change CenterPoint's monthly Houston rates report was re-issued with only its header date moving (10/1/2026 to 11/1/2026). Every figure is identical at every precision, so no rate changed and the encoded Houston residential tariff is unaffected. |
| 2026-11-03 | dominion-va-schedule-1-2026-11-01 | content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97 | no rate change Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change. |
| 2026-11-02 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed (130,650 -> 130,619 bytes, -31) · 596ce8d7882e → 22b3aab8a2c7 | re-encoded NYSEG's Transition Charge statement 266 sets SC1 at -0.1797c/kWh from -0.6072c, about +$4.28 on 1,000 kWh. Encoded for 1 November; not reconciled to a published bill. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (90,274 -> 90,906 bytes, +632) · 7177c7a19c8f → 18287b341b75 | re-encoded Entergy New Orleans' November fuel adjustment fell 1.6246c to 1.2797c/kWh, about -$3.45 on 1,000 kWh. Encoded for 1 November; no November sample bill yet to reconcile against. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (104,859 -> 104,806 bytes, -53) · a407a0aa10bf → 1a53e13dbf75 | re-encoded Entergy New Orleans' purchased power capacity rider rose 3.0287% to 3.2156% for November. Encoded on the November vintage; not yet reconciled to a published bill. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (9,264 -> 8,410 bytes, -854) · f923e50944f2 → 470ca6e76d18 | re-encoded Entergy New Orleans' storm securitization (SSCR II) rose 5.3577% to 5.5698% from 30 October. Encoded on the November vintage; not yet reconciled to a published bill. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (78,548 -> 78,579 bytes, +31) · 7dda970e76c8 → a0683864aa2e | no rate change Entergy New Orleans' environmental adjustment for November is 0.000000, unchanged. No rate moved; the encoding is unchanged. |
| 2026-11-02 | entergy-louisiana-rs-2026-11-01 | content changed (91,631 -> 92,224 bytes, +593) · 4cfe73cd7827 → ad91d8fbf258 | re-encoded Entergy Louisiana's November fuel adjustment fell 2.748c to 2.688c/kWh, about -$0.60 on 1,000 kWh. Encoded for 1 November; Entergy has not yet published a November sample bill to reconcile against. |
| 2026-11-02 | entergy-louisiana-rs-2026-11-01 | content changed (77,464 -> 77,527 bytes, +63) · 73ff931bcc9a → 9054b02787b2 | no rate change Entergy Louisiana appended November to its FSPP table at 0.000002 $/kWh, the same as October. No rate moved; the encoding is unchanged. |
| 2026-11-02 | entergy-louisiana-rs-2026-11-01 | content changed (91,571 -> 91,899 bytes, +328) · 516895ec30e2 → a8ef014f81c9 | re-encoded Entergy Louisiana's November environmental adjustment fell 0.0047c to 0.0034c/kWh (with fuel, below). Encoded for 1 November; no November sample bill yet, so not reconciled to a published total. |
| 2026-11-02 | entergy-arkansas-rs-2026-08-01 | content changed (116,074 -> 117,028 bytes, +954) · 7280720e432b → 2d1b38d16c3c | no rate change Entergy Arkansas revised the Grand Gulf Rider's allocation text (EAL share now 24.19%) effective 27 October. The residential rate is unchanged at 0.762c/kWh; any cost effect arrives at the January redetermination. |
| 2026-11-02 | dominion-va-schedule-1-2026-11-01 | content changed (111,754 -> 112,767 bytes, +1,013) · 5c3eff837f08 → acc564876fdd | re-encoded Dominion's rider exhibit now dates Riders E, PIPP and TRG 11-01-26, the same November filing. The residential moves (+0.0229c/kWh) are encoded for 1 November. |
| 2026-11-02 | dominion-va-schedule-1-2026-11-01 | content changed (15,078,887 -> 9,695,927 bytes, -5,382,960) · b6a2fa061218 → c0d42303fafd | re-encoded Dominion Virginia's November filing: Rider E 0.0625c to 0.0696c and Universal Service Fee (PIPP) 0 to 0.0158c/kWh, +0.0229c on every residential kWh from 1 November. Encoded for that date; no published bill to reconcile against. |
| 2026-11-02 | aps-r1-large-2026-11-01, aps-r1-medium-2026-11-01, aps-r1-small-2026-11-01 | content changed (202,097 -> 192,677 bytes, -9,420) · 31baa7165d89 → 2483d264b6f4 | re-encoded APS's REAC-1 becomes a credit from 1 November: -$0.030514/kWh capped at -$12.21 a month (previously a +$2.49 charge). Encoded on the scheduled shelf for 1 November. |
| 2026-10-31 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (123,241 -> 123,934 bytes, +693) · d34cff152551 → 4295f93534b7 | no rate change LIPA posted Statement 29 of its Long Island Choice parameters - capacity reserve requirements for retail suppliers, effective 1 November. It sets no customer charge; no rate on any residential plan moved. |
| 2026-10-31 | cps-ra-2026-11-01, cps-re-2026-11-01 | content changed (149,562 -> 148,140 bytes, -1,422) · 35fbea7eb552 → 8c21e13ef12f | re-encoded CPS Energy posted its November 2026 fuel factors: the residential fuel/regulatory adjustment falls 4.599c -> 4.307c/kWh (-0.292c on every kWh). Encoded for RE and RA as the 2026-11-01 vintage; the quoted 13.0c class average is unchanged. |
| 2026-10-30 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (3,721,007 -> 3,751,541 bytes, +30,534) · 05b228bb64b6 → 2eaba927a330 | no rate change The MPSC added its October 2026 table: Consumers Energy's PSCR factor is unchanged at 14.56 mills/kWh (1.456c), as are DTE, I&M, UMERC, UPPCO and Alpena. No encoded rate moved. |
| 2026-10-29 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (995,638 -> 973,827 bytes, -21,811) · 9618b10d31b7 → 546176524357 | no rate change Xcel Minnesota revised two franchise-fee sheets (93.3 and 93.12): Newport's city fee rises from November and Wayzata's term is extended. Franchise fees are city-specific and excluded from the encoding; no residential rate moved. |
| 2026-10-29 | aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (180,712 -> 178,984 bytes, -1,728) · 02bdca42229a → 64dc158c4bcb | re-encoded AEP Ohio posted its November tariff book and workbooks. Two riders rise from Cycle 1 November: Storm Damage Recovery $0.19 -> $0.48 a month (non-residential $1.02 -> $2.55) and Economic Development 1.8019% -> 2.42007% of base. Encoded as 2026-11-01 vintages for RS and GS Secondary; Price to Compare unchanged. |
| 2026-10-28 | ppl-rs-2026-07-01, ppl-rs-2026-12-01 | content changed (6,881,954 -> 6,882,495 bytes, +541) · 9816851dc331 → e5bfc29c7882 | no rate change PPL's Rates and Shopping page was re-rendered: only promotional card text changed (Energy Explained became Bill Toolkit) plus site build IDs. No rate figure moved at any precision. No change to the encoding. |
| 2026-10-28 | oge-ok-r1-2026-11-01 | content changed (648,671 -> 649,815 bytes, +1,144) · 0ccc37780049 → c37ec7aa2640 | re-encoded OG&E posted its November 2026 - May 2027 fuel factors (18th Revised Sheet 50.85): residential winter fuel 3.8453c -> 3.8439c/kWh from 1 November. Encoded as the 2026-11-01 vintage; October's rates are unaffected until then. |
| 2026-10-27 | oge-ok-r1-2026-11-01 | content changed (647,615 -> 648,671 bytes, +1,056) · 1e6f28512d89 → 0ccc37780049 | change seen, not confirmed by a published source OG&E's tariffs page added sheet 52.33, 'GCR Factors effective Nov 2026' (Generation Capacity Rider, 1st Revised). That rider is not in the encoded rate. Awaiting a read of the filed sheet and its factors; encoding unchanged. |
| 2026-10-25 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (84,700 -> 84,944 bytes, +244) · b4fc2befdd0e → ccc02ba7abd8 | no rate change Xcel's rate books page briefly served an older copy without the 19 October summary link, then restored it. The PSCo plans are already verified against that summary; no rate moved. |
| 2026-10-25 | sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01 | content changed (93,478 -> 1,506,451 bytes, +1,412,973) · 149baf6c1c42 → 022b96ee3518 | no rate change SCE's Schedule TOU-D was captured truncated on 24 October - 93 KB of a 1.5 MB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate on any TOU-D plan moved. |
| 2026-10-25 | sce-d-2026-10-01 | content changed (77,173 -> 684,211 bytes, +607,038) · 30f5096c78c4 → 19d67a0de6ed | no rate change SCE's Schedule D was captured truncated on 24 October - 77 KB of a 684 KB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate moved. |
| 2026-10-24 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (84,586 -> 84,700 bytes, +114) · 45c230e00a2e → b4fc2befdd0e | no rate change superseded - answered by the review of 2026-10-25 on a later version of this document |
| 2026-10-24 | sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01 | content changed (1,506,451 -> 93,478 bytes, -1,412,973) · 022b96ee3518 → 149baf6c1c42 | no rate change superseded - answered by the review of 2026-10-25 on a later version of this document |
| 2026-10-24 | sce-d-2026-10-01 | content changed (684,211 -> 77,173 bytes, -607,038) · 19d67a0de6ed → 30f5096c78c4 | no rate change superseded - answered by the review of 2026-10-25 on a later version of this document |
| 2026-10-24 | oconomowoc-rg1-2026-07 | content changed (157,061 -> 157,988 bytes, +927) · a6ee9e53ea54 → 51e8c29be0ba | no rate change Oconomowoc's Public Utilities page removed its fall hydrant-flushing news item. The page carries no rate figures, so it cannot evidence a rate change either way; the Power Cost Adjustment remains a disclosed gap. |
| 2026-10-24 | dte-d1-11-2026-09-01, dte-d1-13-2026-09-01, dte-d1-2026-09-01 | content changed (2,815,154 -> 2,611,567 bytes, -203,587) · d9cadeb84131 → c85ceef4be13 | no rate change DTE's Sheet C-62.00 now prints the billed PSCR factor for October to December at 1.877c/kWh, the planned figure already encoded. The rest is a re-export of the book; no rate on D1, D1.11 or D1.13 moved. |
| 2026-10-24 | ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01 | content changed (138,884 -> 139,448 bytes, +564) · 536b41d81709 → 37a93f763654 | re-encoded Ameren filed Rider EEA for November 2026 at 0.00987 c/kWh in Rate Zone I, from October's 0.00985 - about two hundredths of a cent a year at 12,000 kWh. Encoded as the 2026-11-01 vintage on the shelf; October's rates are unaffected until then. |
| 2026-10-22 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed, same size (47,338,008 bytes): 2127d1310d33 -> 2520f1675c99 | no rate change NYSEG's PSC 120 book was re-exported with character-for-character identical text. No rate, schedule or effective date moved. |
| 2026-10-22 | dominion-nc-schedule-1-2025-02-01 | content changed (3,220,827 -> 3,337,726 bytes, +116,899) · 2061ac127f2c → eb2b0ab4ac26 | no rate change Dominion North Carolina's 12 October edition adds four energy-efficiency and thermostat programme schedules (CPEPP, CSBBI, RDTST, RPTST). No rate in Schedule 1 or its riders moved. |
| 2026-10-21 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3,351,437 -> 3,352,279 bytes, +842) · 580e4013ff10 → 3bfafeaabffd | re-encoded Advice Letter 2038, effective 19 Oct 2026, raised Colorado's residential GRSA-E from 0.01452 to 0.01576/kWh and the GRSA to 15.33%. Residential and SG plans re-encoded from the filed rate book; not yet checked against Xcel's 10-19-26 summary. |
| 2026-10-21 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (84,462 -> 84,586 bytes, +124) · f47f50b6e5f6 → 45c230e00a2e | already encoded Xcel posted its Electric Rates Summary effective 19 October 2026. The residential and Schedule SG rates encoded on 21 October for Advice Letter 2038 (GRSA-E $0.01576, GRSA 15.33%) reproduce every printed total exactly; no rate changes. |
| 2026-10-21 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (20,725,618 -> 20,725,619 bytes, +1) · e4fb28001b31 → a6032440444c | no rate change Consumers Energy filed its November 2026 Power Supply Cost Recovery factor on Sheet D-6.00 at 0.01456 per kWh, the same figure already encoded. No rate changed; the encoding's PSCR note now cites November. |
| 2026-10-15 | coned-sc1-2026-02-01 | content changed, same size (65,457,729 bytes): 378e3c249092 -> 3a1eb6b324d7 | no rate change Con Edison re-published its tariff PDF with the same content: one leaf (249.4.3, Rider R community solar rules) moved position within the file. No figure, rate or effective date changed, so the encoding is unchanged. |
| 2026-10-14 | jcpl-rs-2026-10-01 | content changed (81,212 -> 80,414 bytes, -798) · 64870a4582ad → 4e62964bb618 | no rate change FirstEnergy regulatory documents page re-rendered: site navigation and page-chrome markup changed. No figure moved at any precision and the 45 linked tariff PDFs are unchanged. No rate changed; the JCP&L encoding is untouched. |
| 2026-10-13 | pacificorp-ut-1-2026-09-25 | content changed (137,307 -> 137,024 bytes, -283) · e9e8fbf55ad0 → de818e635c8b | re-encoded Schedule 92 (GRC deferral) rose from 1.17% to 1.78% for Schedule 1, billed from 25 Sep 2026 through 31 Dec 2026. The filed sheet and the Price Summary agree. We re-encoded the Utah residential plan with the new percentage. |
| 2026-10-13 | nevada-power-ors-tou-2026-10-01, nevada-power-rs-2026-10-01 | content changed (496,797 -> 399,359 bytes, -97,438) · ec1e72d91585 → 3cdb45998e58 | re-encoded Nevada Power's Statement of Rates took effect 1 Oct 2026. RS is now 11.441c/kWh (was 11.935c): base energy fell and DEAA is a 0.250c credit. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded RS and ORS-TOU. |
| 2026-10-13 | sierra-pacific-d1-2026-10-01, sierra-pacific-dm1-2026-10-01, sierra-pacific-od1-tou-2026-10-01 | content changed (357,300 -> 342,360 bytes, -14,940) · 3f9e50eefb44 → aca796ecb43d | re-encoded Sierra Pacific's Statement of Rates took effect 1 Oct 2026. D-1 is now 11.275c/kWh (was 11.528c); the DEAA credit deepened to 0.500c. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded D-1, DM-1 and OD-1 TOU. |
| 2026-10-10 | pacificorp-ut-1-2026-09-25 | content changed (133,778 -> 133,996 bytes, +218) · 9176ff6f29e6 → 94e0ffdc6df6 | re-encoded The 25 Sep 2026 Price Summary showed Schedule 92 at 1.78%; the filed Schedule 92 sheet now confirms it, effective 25 Sep. Every other Utah figure is unchanged. We re-encoded the Utah residential plan at 1.78%. |
Whether the monitor ran each day. A gap is a day when staleness could not be ruled out. This is not an uptime chart - uptime is the wrong question for a data product. A day counts as checked whether or not anything changed, because a quiet day and a broken monitor must not look alike.
85 of 87 days checked since the first run on 2026-08-19 — 2 day(s) missed: 2026-10-23, 2026-11-13. A missed day is one where staleness could not be ruled out. Hover a cell for the date and how many of the 342 watched sources were checked that day. · The 3 pale cells are days before the monitor existed. They are not misses.
Time from detecting that a utility filed a change to the served rates being updated. This bounds how out-of-date any figure here can be, and it is computed from the record rather than promised.
Measured over every filing since launch, not the window above. Rate changes arrive roughly quarterly, so a 90-day window would usually contain too few to mean anything - and a median over one sample would look like precision it does not have.
Time from detecting a filing to the encoded rates being updated. Pending means detected and not yet encoded; filings reviewed as changing no rate, those encoded ahead of a future effective date, those already encoded before the source document changed at all, and those read but not yet confirmed by the filed source, are counted separately rather than averaged in.
Every rate API claims to be current, and from the outside that claim cannot be checked. This one can: the source documents are polled daily, every version is kept, and when a utility files something we have not encoded yet this page says so by name. A status page that can only report good news is marketing.
Browse rates ·
GET /health returns this page's summary as JSON, without a key.
GET /changes returns the change log as JSON, and needs one.