A change is filed but not yet in force. The rate served today is the one being billed today; the encoding below starts serving itself on its effective date, with no deploy.
| Plan in force | Source | Takes effect | Becomes |
|---|---|---|---|
ppl-rs-2026-07-01 | pplelectric.com/Rate-Schedule-RS-Residential-Service.pdf | 2026-12-01 | ppl-rs-2026-12-01 |
These are serving rates we already know predate a filing. Shown because you should not have to guess.
13 document(s) across 13 plan(s). A plan appears once per changed document, so the same plan can be listed more than once.
| Plan | Source | Change detected | Encoded from |
|---|---|---|---|
pacificorp-wa-16-2026-10-01 | pp_wa_price_summary | 2026-11-07 | 2026-08-26 |
nstar-r1-cape-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1-cape-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1-mainland-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1-mainland-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-cape-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-cape-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-mainland-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r1hp-mainland-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-cape-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-cape-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-mainland-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
nstar-r3-mainland-delivery-2026-09-01 | 1-tariff-ma | 2026-09-04 same day — order not established | 2026-09-04 |
Two denominators, because one of them alone would mislead. 79,866,676 of 143,144,185 US residential customers is 55.8%. The same catalogue is 100.0% of the 79,866,676 customers served by the 50 largest utilities by residential customers (49 groups, 53 operating companies), which is where the work has deliberately gone — the country has 1,267 utilities selling residential electricity, and most of them are small municipals and co-ops.
Counted from EIA Form 861, 2024 data year, Sales_Ult_Cust (residential customer count), regenerated 2026-08-31. Customer counts are a census of households served, not of the plans encoded: a utility counts once it has a residential tariff here, whatever else it also files.
2 further utilities are encoded and serving but cannot appear in any of these figures: Oncor (TX, wires only), CenterPoint Energy Houston. Texas is deregulated, so EIA attributes those households to the retailers that sell them energy rather than to the wires company every one of them pays.
Every time a watched rate sheet stops matching the version the served rates were taken from. The monitor compares bytes, so it cannot tell a re-filed rate from a re-rendered PDF - both are real changes to the document and only one needs the rates re-derived. The outcome column says which, and a row that changed no rate is kept rather than hidden.
All 247 detected changes are listed.
| Detected | Affects | Change | Outcome |
|---|---|---|---|
| 2026-11-12 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3,352,279 -> 3,354,566 bytes, +2,287) · 3bfafeaabffd → 7899fc8bb4b8 | no rate change PSCo's rate book replaced Sheet 70 (Schedule TG, transmission-voltage service) under Advice 2037, effective 13 November: one new customer-specific charge, Metro Denver Sewage $8,140. No other charge changed, and no encoded PSCo plan (R, R-OO, RE-TOU, SG) takes Schedule TG. |
| 2026-11-10 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (1,521,110 -> 1,598,047 bytes, +76,937) · 5b5c104d9760 → e08ae6c67804 | no rate change Xcel (NSP-Minnesota) re-filed Section 5 residential sheets effective 1 Oct 2026 with revision markers and rider notes moved. Every rate figure is unchanged, already encoded from 2 Oct; no rate moved and no re-encoding is needed. |
| 2026-11-10 | oconomowoc-rg1-2026-07 | content changed (157,988 -> 157,654 bytes, -334) · 51e8c29be0ba → c4310e32bc62 | no rate change City of Oconomowoc's Public Utilities web page was re-rendered; the only text change is a removed 'Photo Gallery' navigation link. No rate or figure changed, so the Oconomowoc RG-1 encoding is unchanged. |
| 2026-11-08 | dominion-va-schedule-1-2026-11-01 | content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97 | no rate change Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change. |
| 2026-11-07 | pacificorp-wa-16-2026-10-01 | content changed (155,983 -> 155,972 bytes, -11) · 1ff578e6b713 → 6a9564c85203 | change seen, not confirmed by a published source Pacific Power's Washington price summary dated 7 November lowers Schedule 97 (power cost adjustment) from 2.462c to 1.450c/kWh, Schedule 16 combined 14.343c to 13.331c (-$10.12 on 1,000 kWh). The filed Schedule 97 sheet still shows 2.462c; awaiting it before re-encoding. |
| 2026-11-07 | pacificorp-or-4-2026-10-31 | content changed (123,482 -> 125,238 bytes, +1,756) · eda6d9973168 → 9929ce6078c1 | re-encoded Pacific Power Oregon Schedule 92 rose from $2.64 to $4.26 a month for residential customers from 31 October (filed Sheet 92-1, Third Revision). Encoded with the rest of the 31 October Schedule 4 change. |
| 2026-11-07 | ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01 | content changed (108,052 -> 108,334 bytes, +282) · 9ada1bdf55f0 → 23a73f278bee | no rate change LADWP residential rates page re-rendered: the only text change is a deleted TOU contact-phone sentence. No figure moved at any precision and no applicability list changed. Encodings for R-1A zones 1 and 2 are unchanged. |
| 2026-11-07 | apco-wv-rs-2026-09-01 | content changed (168,488 -> 171,249 bytes, +2,761) · 466da6c91dcc → c2a97fef283e | no rate change APCo West Virginia relinked its tariff book for 1 November: the Consumer Rate Relief Charge rose 0.290c to 0.321c, but it is embedded in the unchanged ENEC rate, and the 1 November typical bill is still $183.07 at 1,000 kWh. No billed residential rate moved. |
| 2026-11-07 | dominion-va-schedule-1-2026-11-01 | content changed (219,572 -> 219,315 bytes, -257) · 66909d264e97 → 3319327f49c7 | no rate change Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates. |
| 2026-11-06 | jcpl-rs-2026-10-01 | content changed (80,414 -> 83,506 bytes, +3,092) · 4e62964bb618 → 19f2fb479870 | no rate change JCP&L's regulatory page changed only its 'Last Modified' date (2 Sep to 5 Nov 2026), a page-loading notice and a stylesheet. No figure moved and no linked document was added or removed; the encoding is unchanged. |
| 2026-11-05 | nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01 | content changed (84,844 -> 88,067 bytes, +3,223) · ac507a4377f9 → 37985e3fa1fd | no rate change Eversource reformatted its Greater Boston rate page: charges reordered and relabelled, explicit $0.00000 rows added on commercial schedules, and the 0.008c planning factor now also listed for R-1HP summer, which the encoding already carries. No R-1, R-1HP or R-3 figure moved. |
| 2026-11-04 | coned-sc1-2026-02-01 | content changed (65,457,729 -> 65,369,690 bytes, -88,039) · 3a1eb6b324d7 → 0caeb2705a77 | no rate change Con Edison removed a stale duplicate page from its tariff book: Leaf 249.4.3 Revision 6 (Rider R, community solar crediting text, superseded in February) had been printed alongside the current Revision 8. No rate figure moved; SC1 is unchanged. |
| 2026-11-04 | oncor-residential-2026-10-04 | content changed (3,886,275 -> 3,890,589 bytes, +4,314) · 5e9cd16c4f98 → 404c87f71e57 | no rate change Oncor re-exported its retail delivery tariff PDF. The extracted text is identical character for character, so no rate, schedule or applicability changed. The encoding is unchanged. |
| 2026-11-04 | entergy-texas-rs-2026-11-01 | content changed (53,229 -> 53,565 bytes, +336) · 3d66fb09bf08 → 38b66da54be5 | re-encoded Entergy Texas's November sample bill adds Schedule GCRR at 1.0493c/kWh (+10.49 on 1,000 kWh) and drops the zero SCO and RCE-5 lines; total 157.65 to 168.14. Re-encoded as a November vintage; it rebuilds 168.14 exactly. |
| 2026-11-04 | entergy-neworleans-res25-2026-11-01 | content changed (52,947 -> 53,348 bytes, +401) · 319dd8d800ae → 201f419170c9 | already encoded Entergy New Orleans's November sample bill moved PPCR 3.0287% to 3.2156%, SSCRII 5.3577% to 5.5698% and fuel 1.6246c to 1.2797c; total 152.65 to 144.21. All already encoded on 2 Nov; the encoding rebuilds 144.21 exactly. |
| 2026-11-04 | entergy-mississippi-rs40c-2026-10-01 | content changed (54,910 -> 54,916 bytes, +6) · 0744ae2279cf → 5bb3849cdd91 | no rate change Entergy Mississippi's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision and the total is still 164.39. No rate moved; the encoding is unchanged. |
| 2026-11-04 | entergy-louisiana-rs-2026-11-01 | content changed (58,000 -> 58,006 bytes, +6) · 7241de462a91 → 40a8bb19b01c | already encoded Entergy Louisiana's November sample bill shows fuel adjustment 2.748c to 2.688c and EAC 0.0047c to 0.0034c, total 146.19 to 145.57. Both were already encoded on 2 Nov; the November vintage now rebuilds 145.57 within a cent. |
| 2026-11-04 | entergy-arkansas-rs-2026-08-01 | content changed (54,675 -> 54,677 bytes, +2) · 887245daa462 → dc9ef9df9cf6 | no rate change Entergy Arkansas's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision, and the total is still 143.81. No rate moved; the encoding is unchanged. |
| 2026-11-03 | oncor-residential-2026-10-04 | content changed (88,333 -> 86,747 bytes, -1,586) · dcc63098a028 → 628c8d85af2b | already encoded The PUCT comparison page moved to 1 November and now shows Oncor at 6.8673c/kWh, the 4 October rates already encoded. Its AEP Texas rows also moved; AEP Texas is not encoded. No encoded rate changes. |
| 2026-11-03 | ppl-rs-2026-07-01, ppl-rs-2026-12-01 | content changed (6,882,495 -> 6,883,127 bytes, +632) · e5bfc29c7882 → 27493d722e4c | re-encoded PPL's Price to Compare rises 13.079c to 14.428c/kWh on 1 December (GSC-1 0.10133 + TSC 0.04295, Supplements 5 and 6 to Tariff No. 202), about +$13.49 on 1,000 kWh. Encoded for that date and reconciled to PPL's posted figure; current rates unaffected until then. |
| 2026-11-03 | pacificorp-or-4-2026-10-31 | content changed (517,600 -> 560,401 bytes, +42,801) · 293897778e42 → dae38c4f5cd5 | re-encoded Pacific Power Oregon Schedule 4 re-encoded from the 31 October price summary: combined 14.499c to 14.128c/kWh (Schedules 94, 190, 203, 206) and Schedule 92 $2.64 to $4.26 a month, about -$1.75 on 900 kWh. Schedules 94, 190 and 203 are not yet on their filed sheets; watched. |
| 2026-11-03 | oge-ok-r1-2026-11-01 | content changed (649,815 -> 652,139 bytes, +2,324) · c37ec7aa2640 → 3e64f2c5f190 | no rate change OG&E's tariffs page added 'REP 2027' pricing for its Renewable Energy Program (sheet 51.91), a programme not in the encoded rate. No encoded rider moved. |
| 2026-11-03 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (148,562 -> 149,026 bytes, +464) · afdcc0d82b03 → efa6a44c8ef2 | re-encoded LIPA posted Power Supply Charge Statement 119 for November: the base supply charge rose 13.9200c to 14.2906c/kWh, about +0.37c on every kWh (+$3.72 on 1,000 kWh at rate 180). Encoded on all four SC1 plans from 1 November; the statement's own printed per-rate-code figures are reproduced. |
| 2026-11-03 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (123,934 -> 123,935 bytes, +1) · 4295f93534b7 → 6361f57a6fcc | no rate change LIPA linked Value Stack Credit statement VSC-104 for November in place of VSC-103. Value Stack credits compensate exported distributed generation and are not part of the encoded SC1 bills; the tariff book link is unchanged. No encoded rate moved. |
| 2026-11-03 | duke-carolinas-sc-rs-2026-11-01 | content changed (124,196 -> 109,860 bytes, -14,336) · b56508f6980a → 30b702e4a70d | re-encoded Duke Energy Carolinas' SC Schedule RS rose 0.5799c on both tiers from 1 November (13.8125/14.4661c to 14.3924/15.0460c), the annual fuel order. Re-encoded from that date; Duke publishes no SC sample bill to reconcile against. |
| 2026-11-03 | duke-carolinas-sc-rs-2026-11-01 | content changed (126,395 -> 119,395 bytes, -7,000) · 6f91b0d3cc75 → 7648cbd56a33 | re-encoded Duke Carolinas SC Leaf 50C: residential fuel 2.8854c to 3.4622c/kWh (already inside the Schedule RS base, which rose to match) and the DERP monthly charge $0.52 to $0.11, from 1 November. Re-encoded with Schedule RS. |
| 2026-11-03 | duke-in-rs-2026-11-01 | content changed (80,480 -> 85,434 bytes, +4,954) · 35fdd555719f → da0782ef9143 | re-encoded Duke Energy Indiana's Q4 tracker table added a November row for Tariff 65 (T&D infrastructure): residential 0.000929 to 0.000111 $/kWh, -$0.82 on 1,000 kWh. Re-encoded for bills from November; no sample bill at this vintage to reconcile against. |
| 2026-11-03 | apco-va-rs-2026-11-01 | content changed (179,299 -> 181,012 bytes, +1,713) · 550f1eec6b7a → 8c067a2411ae | re-encoded APCo Virginia's November 1 update cut Rider P.I.P.P. from 0.132c to 0.082c/kWh, taking Schedule R.S. from 16.189c to 16.139c (-$0.50 on 1,000 kWh). Re-encoded from 1 November and reconciled to APCo's published $169.35 typical bill. |
| 2026-11-03 | oncor-residential-2026-10-04 | content changed (276,445 -> 88,575 bytes, -187,870) · 8e5a29b689b3 → 7c30455e00d4 | already encoded The PUCT's Oncor report as of November 1 prints $0.068673/kWh and $72.73 at 1,000 kWh - the 4 October tracker rates already encoded. No new rate moved; that vintage now reconciles exactly to a published total. |
| 2026-11-03 | centerpoint-houston-residential-2026-09-30 | content changed (269,441 -> 87,065 bytes, -182,376) · 1b60f48c2b43 → 61f220fa722e | no rate change CenterPoint's monthly Houston rates report was re-issued with only its header date moving (10/1/2026 to 11/1/2026). Every figure is identical at every precision, so no rate changed and the encoded Houston residential tariff is unaffected. |
| 2026-11-03 | dominion-va-schedule-1-2026-11-01 | content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97 | no rate change Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change. |
| 2026-11-02 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed (130,650 -> 130,619 bytes, -31) · 596ce8d7882e → 22b3aab8a2c7 | re-encoded NYSEG's Transition Charge statement 266 sets SC1 at -0.1797c/kWh from -0.6072c, about +$4.28 on 1,000 kWh. Encoded for 1 November; not reconciled to a published bill. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (90,274 -> 90,906 bytes, +632) · 7177c7a19c8f → 18287b341b75 | re-encoded Entergy New Orleans' November fuel adjustment fell 1.6246c to 1.2797c/kWh, about -$3.45 on 1,000 kWh. Encoded for 1 November; no November sample bill yet to reconcile against. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (104,859 -> 104,806 bytes, -53) · a407a0aa10bf → 1a53e13dbf75 | re-encoded Entergy New Orleans' purchased power capacity rider rose 3.0287% to 3.2156% for November. Encoded on the November vintage; not yet reconciled to a published bill. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (9,264 -> 8,410 bytes, -854) · f923e50944f2 → 470ca6e76d18 | re-encoded Entergy New Orleans' storm securitization (SSCR II) rose 5.3577% to 5.5698% from 30 October. Encoded on the November vintage; not yet reconciled to a published bill. |
| 2026-11-02 | entergy-neworleans-res25-2026-11-01 | content changed (78,548 -> 78,579 bytes, +31) · 7dda970e76c8 → a0683864aa2e | no rate change Entergy New Orleans' environmental adjustment for November is 0.000000, unchanged. No rate moved; the encoding is unchanged. |
| 2026-11-02 | entergy-louisiana-rs-2026-11-01 | content changed (91,631 -> 92,224 bytes, +593) · 4cfe73cd7827 → ad91d8fbf258 | re-encoded Entergy Louisiana's November fuel adjustment fell 2.748c to 2.688c/kWh, about -$0.60 on 1,000 kWh. Encoded for 1 November; Entergy has not yet published a November sample bill to reconcile against. |
| 2026-11-02 | entergy-louisiana-rs-2026-11-01 | content changed (77,464 -> 77,527 bytes, +63) · 73ff931bcc9a → 9054b02787b2 | no rate change Entergy Louisiana appended November to its FSPP table at 0.000002 $/kWh, the same as October. No rate moved; the encoding is unchanged. |
| 2026-11-02 | entergy-louisiana-rs-2026-11-01 | content changed (91,571 -> 91,899 bytes, +328) · 516895ec30e2 → a8ef014f81c9 | re-encoded Entergy Louisiana's November environmental adjustment fell 0.0047c to 0.0034c/kWh (with fuel, below). Encoded for 1 November; no November sample bill yet, so not reconciled to a published total. |
| 2026-11-02 | entergy-arkansas-rs-2026-08-01 | content changed (116,074 -> 117,028 bytes, +954) · 7280720e432b → 2d1b38d16c3c | no rate change Entergy Arkansas revised the Grand Gulf Rider's allocation text (EAL share now 24.19%) effective 27 October. The residential rate is unchanged at 0.762c/kWh; any cost effect arrives at the January redetermination. |
| 2026-11-02 | dominion-va-schedule-1-2026-11-01 | content changed (111,754 -> 112,767 bytes, +1,013) · 5c3eff837f08 → acc564876fdd | re-encoded Dominion's rider exhibit now dates Riders E, PIPP and TRG 11-01-26, the same November filing. The residential moves (+0.0229c/kWh) are encoded for 1 November. |
| 2026-11-02 | dominion-va-schedule-1-2026-11-01 | content changed (15,078,887 -> 9,695,927 bytes, -5,382,960) · b6a2fa061218 → c0d42303fafd | re-encoded Dominion Virginia's November filing: Rider E 0.0625c to 0.0696c and Universal Service Fee (PIPP) 0 to 0.0158c/kWh, +0.0229c on every residential kWh from 1 November. Encoded for that date; no published bill to reconcile against. |
| 2026-11-02 | aps-r1-large-2026-11-01, aps-r1-medium-2026-11-01, aps-r1-small-2026-11-01 | content changed (202,097 -> 192,677 bytes, -9,420) · 31baa7165d89 → 2483d264b6f4 | re-encoded APS's REAC-1 becomes a credit from 1 November: -$0.030514/kWh capped at -$12.21 a month (previously a +$2.49 charge). Encoded on the scheduled shelf for 1 November. |
| 2026-10-31 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (123,241 -> 123,934 bytes, +693) · d34cff152551 → 4295f93534b7 | no rate change LIPA posted Statement 29 of its Long Island Choice parameters - capacity reserve requirements for retail suppliers, effective 1 November. It sets no customer charge; no rate on any residential plan moved. |
| 2026-10-31 | cps-ra-2026-11-01, cps-re-2026-11-01 | content changed (149,562 -> 148,140 bytes, -1,422) · 35fbea7eb552 → 8c21e13ef12f | re-encoded CPS Energy posted its November 2026 fuel factors: the residential fuel/regulatory adjustment falls 4.599c -> 4.307c/kWh (-0.292c on every kWh). Encoded for RE and RA as the 2026-11-01 vintage; the quoted 13.0c class average is unchanged. |
| 2026-10-30 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (3,721,007 -> 3,751,541 bytes, +30,534) · 05b228bb64b6 → 2eaba927a330 | no rate change The MPSC added its October 2026 table: Consumers Energy's PSCR factor is unchanged at 14.56 mills/kWh (1.456c), as are DTE, I&M, UMERC, UPPCO and Alpena. No encoded rate moved. |
| 2026-10-29 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (995,638 -> 973,827 bytes, -21,811) · 9618b10d31b7 → 546176524357 | no rate change Xcel Minnesota revised two franchise-fee sheets (93.3 and 93.12): Newport's city fee rises from November and Wayzata's term is extended. Franchise fees are city-specific and excluded from the encoding; no residential rate moved. |
| 2026-10-29 | aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (180,712 -> 178,984 bytes, -1,728) · 02bdca42229a → 64dc158c4bcb | re-encoded AEP Ohio posted its November tariff book and workbooks. Two riders rise from Cycle 1 November: Storm Damage Recovery $0.19 -> $0.48 a month (non-residential $1.02 -> $2.55) and Economic Development 1.8019% -> 2.42007% of base. Encoded as 2026-11-01 vintages for RS and GS Secondary; Price to Compare unchanged. |
| 2026-10-28 | ppl-rs-2026-07-01, ppl-rs-2026-12-01 | content changed (6,881,954 -> 6,882,495 bytes, +541) · 9816851dc331 → e5bfc29c7882 | no rate change PPL's Rates and Shopping page was re-rendered: only promotional card text changed (Energy Explained became Bill Toolkit) plus site build IDs. No rate figure moved at any precision. No change to the encoding. |
| 2026-10-28 | oge-ok-r1-2026-11-01 | content changed (648,671 -> 649,815 bytes, +1,144) · 0ccc37780049 → c37ec7aa2640 | re-encoded OG&E posted its November 2026 - May 2027 fuel factors (18th Revised Sheet 50.85): residential winter fuel 3.8453c -> 3.8439c/kWh from 1 November. Encoded as the 2026-11-01 vintage; October's rates are unaffected until then. |
| 2026-10-27 | oge-ok-r1-2026-11-01 | content changed (647,615 -> 648,671 bytes, +1,056) · 1e6f28512d89 → 0ccc37780049 | change seen, not confirmed by a published source OG&E's tariffs page added sheet 52.33, 'GCR Factors effective Nov 2026' (Generation Capacity Rider, 1st Revised). That rider is not in the encoded rate. Awaiting a read of the filed sheet and its factors; encoding unchanged. |
| 2026-10-25 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (84,700 -> 84,944 bytes, +244) · b4fc2befdd0e → ccc02ba7abd8 | no rate change Xcel's rate books page briefly served an older copy without the 19 October summary link, then restored it. The PSCo plans are already verified against that summary; no rate moved. |
| 2026-10-25 | sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01 | content changed (93,478 -> 1,506,451 bytes, +1,412,973) · 149baf6c1c42 → 022b96ee3518 | no rate change SCE's Schedule TOU-D was captured truncated on 24 October - 93 KB of a 1.5 MB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate on any TOU-D plan moved. |
| 2026-10-25 | sce-d-2026-10-01 | content changed (77,173 -> 684,211 bytes, +607,038) · 30f5096c78c4 → 19d67a0de6ed | no rate change SCE's Schedule D was captured truncated on 24 October - 77 KB of a 684 KB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate moved. |
| 2026-10-24 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (84,586 -> 84,700 bytes, +114) · 45c230e00a2e → b4fc2befdd0e | no rate change superseded - answered by the review of 2026-10-25 on a later version of this document |
| 2026-10-24 | sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01 | content changed (1,506,451 -> 93,478 bytes, -1,412,973) · 022b96ee3518 → 149baf6c1c42 | no rate change superseded - answered by the review of 2026-10-25 on a later version of this document |
| 2026-10-24 | sce-d-2026-10-01 | content changed (684,211 -> 77,173 bytes, -607,038) · 19d67a0de6ed → 30f5096c78c4 | no rate change superseded - answered by the review of 2026-10-25 on a later version of this document |
| 2026-10-24 | oconomowoc-rg1-2026-07 | content changed (157,061 -> 157,988 bytes, +927) · a6ee9e53ea54 → 51e8c29be0ba | no rate change Oconomowoc's Public Utilities page removed its fall hydrant-flushing news item. The page carries no rate figures, so it cannot evidence a rate change either way; the Power Cost Adjustment remains a disclosed gap. |
| 2026-10-24 | dte-d1-11-2026-09-01, dte-d1-13-2026-09-01, dte-d1-2026-09-01 | content changed (2,815,154 -> 2,611,567 bytes, -203,587) · d9cadeb84131 → c85ceef4be13 | no rate change DTE's Sheet C-62.00 now prints the billed PSCR factor for October to December at 1.877c/kWh, the planned figure already encoded. The rest is a re-export of the book; no rate on D1, D1.11 or D1.13 moved. |
| 2026-10-24 | ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01 | content changed (138,884 -> 139,448 bytes, +564) · 536b41d81709 → 37a93f763654 | re-encoded Ameren filed Rider EEA for November 2026 at 0.00987 c/kWh in Rate Zone I, from October's 0.00985 - about two hundredths of a cent a year at 12,000 kWh. Encoded as the 2026-11-01 vintage on the shelf; October's rates are unaffected until then. |
| 2026-10-22 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed, same size (47,338,008 bytes): 2127d1310d33 -> 2520f1675c99 | no rate change NYSEG's PSC 120 book was re-exported with character-for-character identical text. No rate, schedule or effective date moved. |
| 2026-10-22 | dominion-nc-schedule-1-2025-02-01 | content changed (3,220,827 -> 3,337,726 bytes, +116,899) · 2061ac127f2c → eb2b0ab4ac26 | no rate change Dominion North Carolina's 12 October edition adds four energy-efficiency and thermostat programme schedules (CPEPP, CSBBI, RDTST, RPTST). No rate in Schedule 1 or its riders moved. |
| 2026-10-21 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3,351,437 -> 3,352,279 bytes, +842) · 580e4013ff10 → 3bfafeaabffd | re-encoded Advice Letter 2038, effective 19 Oct 2026, raised Colorado's residential GRSA-E from 0.01452 to 0.01576/kWh and the GRSA to 15.33%. Residential and SG plans re-encoded from the filed rate book; not yet checked against Xcel's 10-19-26 summary. |
| 2026-10-21 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (84,462 -> 84,586 bytes, +124) · f47f50b6e5f6 → 45c230e00a2e | already encoded Xcel posted its Electric Rates Summary effective 19 October 2026. The residential and Schedule SG rates encoded on 21 October for Advice Letter 2038 (GRSA-E $0.01576, GRSA 15.33%) reproduce every printed total exactly; no rate changes. |
| 2026-10-21 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (20,725,618 -> 20,725,619 bytes, +1) · e4fb28001b31 → a6032440444c | no rate change Consumers Energy filed its November 2026 Power Supply Cost Recovery factor on Sheet D-6.00 at 0.01456 per kWh, the same figure already encoded. No rate changed; the encoding's PSCR note now cites November. |
| 2026-10-15 | coned-sc1-2026-02-01 | content changed, same size (65,457,729 bytes): 378e3c249092 -> 3a1eb6b324d7 | no rate change Con Edison re-published its tariff PDF with the same content: one leaf (249.4.3, Rider R community solar rules) moved position within the file. No figure, rate or effective date changed, so the encoding is unchanged. |
| 2026-10-14 | jcpl-rs-2026-10-01 | content changed (81,212 -> 80,414 bytes, -798) · 64870a4582ad → 4e62964bb618 | no rate change FirstEnergy regulatory documents page re-rendered: site navigation and page-chrome markup changed. No figure moved at any precision and the 45 linked tariff PDFs are unchanged. No rate changed; the JCP&L encoding is untouched. |
| 2026-10-13 | pacificorp-ut-1-2026-09-25 | content changed (137,307 -> 137,024 bytes, -283) · e9e8fbf55ad0 → de818e635c8b | re-encoded Schedule 92 (GRC deferral) rose from 1.17% to 1.78% for Schedule 1, billed from 25 Sep 2026 through 31 Dec 2026. The filed sheet and the Price Summary agree. We re-encoded the Utah residential plan with the new percentage. |
| 2026-10-13 | nevada-power-ors-tou-2026-10-01, nevada-power-rs-2026-10-01 | content changed (496,797 -> 399,359 bytes, -97,438) · ec1e72d91585 → 3cdb45998e58 | re-encoded Nevada Power's Statement of Rates took effect 1 Oct 2026. RS is now 11.441c/kWh (was 11.935c): base energy fell and DEAA is a 0.250c credit. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded RS and ORS-TOU. |
| 2026-10-13 | sierra-pacific-d1-2026-10-01, sierra-pacific-dm1-2026-10-01, sierra-pacific-od1-tou-2026-10-01 | content changed (357,300 -> 342,360 bytes, -14,940) · 3f9e50eefb44 → aca796ecb43d | re-encoded Sierra Pacific's Statement of Rates took effect 1 Oct 2026. D-1 is now 11.275c/kWh (was 11.528c); the DEAA credit deepened to 0.500c. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded D-1, DM-1 and OD-1 TOU. |
| 2026-10-10 | pacificorp-ut-1-2026-09-25 | content changed (133,778 -> 133,996 bytes, +218) · 9176ff6f29e6 → 94e0ffdc6df6 | re-encoded The 25 Sep 2026 Price Summary showed Schedule 92 at 1.78%; the filed Schedule 92 sheet now confirms it, effective 25 Sep. Every other Utah figure is unchanged. We re-encoded the Utah residential plan at 1.78%. |
| 2026-10-09 | niagara-mohawk-sc1-2026-04-01 | content changed (49,735,401 -> 49,735,529 bytes, +128) · 8e4149fe855d → b71a636430f6 | no rate change Niagara Mohawk re-filed Leaf 263.5 (Major Renewable Energy host-community bill credit): revision 20 to 21, effective 9 Oct, with paragraph renumbering 48.x to 58.x only. No rate moved; Leaf 349 (SC1) is untouched. Encoding unchanged. |
| 2026-10-08 | jcpl-rs-2026-10-01 | content changed (81,147 -> 82,542 bytes, +1,395) · 0e9904916dfc → 88a562f596a2 | re-encoded JCP&L's 10/1/2026 tariff changed four residential items: NGC, SBC, Rider RP (renamed ENJ) and TEC, net about -0.009 c/kWh. Re-encoded from the filed sheets. No published total exists at the new rates yet, so it is disclosed as not reconciled. |
| 2026-10-07 | coned-sc1-2026-02-01 | content changed, same size (65,457,729 bytes): d26937fdfbc2 -> 378e3c249092 | no rate change Con Edison's tariff PDF was re-rendered: one 59-line leaf (Rider R, CDG credits, effective 02/01/2026) moved to a different position in the file. Same text and figures, nothing added or removed. No rate moved; the encoding is unchanged. |
| 2026-10-06 | masselectric-r1-2026-10-01, masselectric-r1-heat-pump-2026-10-01 | content changed, same size (99,707 bytes): aa0b57027e6e -> edd693c2999a | no rate change Massachusetts Electric re-exported its Basic Service sheet; the text is identical character for character. The fixed supply price is still 17.185c/kWh for August 2026 to January 2027, so no rate moved and the encoding is unchanged. |
| 2026-10-06 | dominion-nc-schedule-1-2025-02-01 | content changed (2,831,845 -> 3,220,827 bytes, +388,982) · 0a2ce93d3a0f → 2061ac127f2c | no rate change Dominion North Carolina's filing is back to the 2 October edition, byte-identical, with its revised cogeneration purchase rates (Schedules 19-FP and 19-LMP). Its server keeps alternating two editions; neither changes Schedule 1 or its riders. |
| 2026-10-05 | oncor-residential-2026-10-04 | content changed (3,241,138 -> 3,886,275 bytes, +645,137) · c1263802662b → 5e9cd16c4f98 | re-encoded Oncor put temporary rates into effect on 4 Oct (Docket 59249): TCRF 1.9046c to 2.1669c and DCRF 0 to 0.5755c, +0.8378 c/kWh, about +$8.38 on 1,000 kWh. Re-encoded from 4 Oct; no published total covers it yet, so it is disclosed as unreconciled. |
| 2026-10-04 | dominion-nc-schedule-1-2025-02-01 | content changed (3,220,827 -> 2,831,845 bytes, -388,982) · 2061ac127f2c → 0a2ce93d3a0f | no rate change Dominion North Carolina's filing is back to the 21 August edition, byte-identical, as on 2 October. Its server keeps alternating between that and the 2 October cogeneration purchase-rate edition; neither changes Schedule 1 or its riders. |
| 2026-10-03 | niagara-mohawk-sc1-2026-04-01 | content changed, same size (49,735,401 bytes): 6898e380d844 -> 8e4149fe855d | no rate change Niagara Mohawk's PSC 220 tariff was re-exported: same size, and the extracted text is identical character for character. No rate or wording changed. |
| 2026-10-03 | oge-ok-r1-2026-11-01 | content changed (646,532 -> 647,615 bytes, +1,083) · 3b35ba2a46b1 → 1e6f28512d89 | re-encoded OG&E posted Winter Event Securitization factors effective 1 October (residential 0.243c -> 0.219c/kWh). That charge, the SPP Cost Tracker (0.432c) and the Grid Enhancement credit (-0.029c) had been missing; all three are now encoded, about +$6.22 on 1,000 kWh. |
| 2026-10-03 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (123,243 -> 123,241 bytes, -2) · 74791ebdb91d → d34cff152551 | no rate change LIPA published its October tariff book. The only change is the Extreme Heat Protections section, cancelled; every rate figure is identical to September's. The watch now reads the October book. |
| 2026-10-03 | aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (774,996 -> 796,301 bytes, +21,305) · 38d079c1606f → 9a634ca5dea9 | re-encoded PUCO published Ohio Power's Oct-Dec Price to Compare, $0.1019/kWh ($0.1097 before), which the October encoding reproduces. Checking it corrected the Alternative Energy Rider to its filed 0.38973c (was 0.3897c), +$0.0003 on 1,000 kWh. |
| 2026-10-03 | dominion-nc-schedule-1-2025-02-01 | content changed (2,831,845 -> 3,220,827 bytes, +388,982) · 0a2ce93d3a0f → 2061ac127f2c | no rate change Dominion North Carolina's filing is back to the 2 October edition, byte-identical, with its revised cogeneration purchase rates (Schedules 19-FP and 19-LMP). Its server keeps alternating two editions; neither changes Schedule 1 or its riders. |
| 2026-10-02 | dominion-va-schedule-1-2026-11-01 | content changed (9,249,299 -> 15,078,887 bytes, +5,829,588) · 2231c2aca3b3 → b6a2fa061218 | no rate change Dominion Virginia's October book changes shared-solar bill credits (residential -13.232c -> -13.528c), the EV Level 2 charging price ($0.34 -> $0.33) and Rider SMR's stated period. Schedule 1 and every rider it uses are unchanged. |
| 2026-10-02 | dominion-nc-schedule-1-2025-02-01 | content changed (3,220,827 -> 2,831,845 bytes, -388,982) · 2061ac127f2c → 0a2ce93d3a0f | no rate change Dominion North Carolina's filing is back to the 21 August edition, byte-identical, as on 2 October. Its server keeps alternating between that and the 2 October cogeneration purchase-rate edition; neither changes Schedule 1 or its riders. |
| 2026-10-02 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (922,986 -> 995,638 bytes, +72,652) · 874ea978a077 → 9618b10d31b7 | re-encoded Xcel Minnesota re-filed October's residential fuel factor (Sheet 91.1, effective 1 October): 2.243c -> a credit of -0.179c/kWh, about -$24.22 on a 1,000 kWh October. Other months unchanged. Encoded on both Minnesota plans. |
| 2026-10-02 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (83,812 -> 84,462 bytes, +650) · abfeb44a3962 → f47f50b6e5f6 | already encoded Xcel posted its Electric Rates Summary effective 1 October 2026. All eight PSCo residential rates and the $8.22 service charge encoded on 30 September reproduce its totals exactly; no rate changes. |
| 2026-10-02 | masselectric-r1-2026-10-01, masselectric-r1-heat-pump-2026-10-01 | content changed (179,790 -> 189,110 bytes, +9,320) · 82f608de6aad → a3f93f31359e | re-encoded M.D.P.U. No. 1-26-I, effective 1 October: R-1 net distribution 10.422c -> 10.924c/kWh (base distribution, advanced metering and a new performance incentive factor). Delivery 22.327c -> 22.829c, about +$5.02 on 1,000 kWh. Both Mass Electric plans re-encoded. |
| 2026-10-02 | masselectric-r1-2026-10-01, masselectric-r1-heat-pump-2026-10-01 | content changed (95,772 -> 99,707 bytes, +3,935) · db748a777a36 → aa0b57027e6e | no rate change Basic Service sheet re-issued under M.D.P.U. No. 1-26-I with only the filing number and dates changed. The fixed supply price is still 17.185c/kWh for August 2026 to January 2027. |
| 2026-10-02 | entergy-texas-rs-2026-11-01 | content changed (53,275 -> 53,229 bytes, -46) · 803c57706d15 → 3d66fb09bf08 | no rate change Only the month label changed, September to October. Every line of the Entergy Texas sample bill is identical, still $157.65 on 1,000 kWh. |
| 2026-10-02 | entergy-neworleans-res25-2026-11-01 | content changed (90,507 -> 90,274 bytes, -233) · d0ea4cc8b8c8 → 7177c7a19c8f | re-encoded New Orleans fuel adjustment for October 2026 is 1.6246c/kWh (Legacy ENO), down from 1.8153c. Encoded as entergy-neworleans-res25-2026-10-01. |
| 2026-10-02 | entergy-neworleans-res25-2026-11-01 | content changed (103,972 -> 104,859 bytes, +887) · adfb95b93219 → a407a0aa10bf | re-encoded Residential PPCR for October 2026 is 3.028659%, down from 6.695326%. Encoded as entergy-neworleans-res25-2026-10-01. |
| 2026-10-02 | entergy-neworleans-res25-2026-11-01 | content changed (78,624 -> 78,548 bytes, -76) · 3311e8016118 → 7dda970e76c8 | no rate change October's New Orleans EAC row was appended at $0.000000, the same as September; a 2024 row rolled off. |
| 2026-10-02 | entergy-neworleans-res25-2026-11-01 | content changed (52,950 -> 52,947 bytes, -3) · 7ec318a0cd80 → 319dd8d800ae | re-encoded Entergy New Orleans's October bill: fuel 1.8153c -> 1.6246c/kWh, PPCR 6.695326% -> 3.028659%. $158.04 -> $152.65 on 1,000 kWh. Encoded as entergy-neworleans-res25-2026-10-01. |
| 2026-10-02 | entergy-mississippi-rs40c-2026-10-01 | content changed (54,917 -> 54,910 bytes, -7) · fc222d375c94 → 0744ae2279cf | re-encoded Entergy Mississippi's October bill: MSE/RM 20.26223% -> 20.31900%, unit power cost 0.27724% -> 0%, ad valorem 4.9595% -> 4.6650%. $165.10 -> $164.39 on 1,000 kWh. Encoded as entergy-mississippi-rs40c-2026-10-01. |
| 2026-10-02 | entergy-mississippi-rs40c-2026-10-01 | content changed (68,118 -> 88,876 bytes, +20,758) · 81ecad47fc3f → 0e2ca5abf20a | re-encoded Unit power cost adjustment is 0.00000% from October 2026, down from 0.27724%. Encoded as entergy-mississippi-rs40c-2026-10-01. |
| 2026-10-02 | entergy-mississippi-rs40c-2026-10-01 | content changed (100,705 -> 101,726 bytes, +1,021) · 10822984fc57 → 25847c75224e | re-encoded MSE/RM for October 2026 to September 2027 is 20.31900% (MSE-4 now -40.53016%), replacing 20.26223%. Encoded as entergy-mississippi-rs40c-2026-10-01. |
| 2026-10-02 | entergy-mississippi-rs40c-2026-10-01 | content changed (87,714 -> 88,130 bytes, +416) · b10fa3c3298c → 240b716afe42 | re-encoded Ad valorem tax adjustment is 4.6650% from October 2026, down from 4.9595%. Encoded as entergy-mississippi-rs40c-2026-10-01. |
| 2026-10-02 | entergy-louisiana-rs-2026-11-01 | content changed (91,884 -> 91,631 bytes, -253) · 533ccc4a517a → 4cfe73cd7827 | re-encoded Entergy Louisiana's October fuel adjustment, 2.748c/kWh (2.821c in September). Encoded as entergy-louisiana-rs-2026-10-01, which reproduces the October sample bill. |
| 2026-10-02 | entergy-louisiana-rs-2026-11-01 | content changed (77,517 -> 77,464 bytes, -53) · 693b5be3e453 → 73ff931bcc9a | no rate change October's fuel stabilization factor is 0.0002c/kWh, the same as September; the change was a 2024 row rolling off the table. |
| 2026-10-02 | entergy-louisiana-rs-2026-11-01 | content changed (57,929 -> 58,000 bytes, +71) · 8434ecc9fead → 7241de462a91 | re-encoded October factors for Entergy Louisiana: fuel 2.821c -> 2.748c/kWh, EAC 0.0037c -> 0.0047c, FSCIV hurricane charge 18.3937% -> 17.5102%. $147.35 -> $146.19 on 1,000 kWh. Encoded as entergy-louisiana-rs-2026-10-01. |
| 2026-10-02 | entergy-louisiana-rs-2026-11-01 | content changed (91,740 -> 91,571 bytes, -169) · 93c276793853 → 516895ec30e2 | re-encoded Entergy Louisiana's October environmental adjustment, 0.0047c/kWh (0.0037c in September). Encoded as entergy-louisiana-rs-2026-10-01. |
| 2026-10-02 | entergy-arkansas-rs-2026-08-01 | content changed (54,618 -> 54,675 bytes, +57) · 2d133b2958fb → 887245daa462 | no rate change Entergy Arkansas's October sample bill is a winter bill ($143.81 on 1,000 kWh). Every rider rate on it is unchanged; the drop is the October-May base rate, which the encoding already carries and now reproduces to the cent. |
| 2026-10-02 | duke-in-rs-2026-11-01 | content changed (683,658 -> 199,128 bytes, -484,530) · 02e241bd9787 → 6d2adc25d235 | re-encoded Duke Energy Indiana's fuel cost adjustment for bills from October 2026: Rate RS 0.4667c -> 0.7434c/kWh. With the generation cost tracker, about +$3.72 on 1,000 kWh. Encoded as duke-in-rs-2026-10-01. |
| 2026-10-02 | duke-in-rs-2026-11-01 | content changed (319,848 -> 80,480 bytes, -239,368) · 4d2ae5f63bf0 → 35fdd555719f | re-encoded The Q4 2026 tracker table: on Rate RS, fuel 0.004667 -> 0.007434 and generation cost tracker 0.002410 -> 0.003363 $/kWh from October billing; the other nine are unchanged. Encoded as duke-in-rs-2026-10-01. |
| 2026-10-02 | bge-r-2026-10-01 | content changed (97,046 -> 96,700 bytes, -346) · 41737c48d7ec → 859c0f7b2eda | already encoded BGE's October Rider 25 values, now fetched at their new address. Schedule R ($0.00173)/kWh is what bge-r-2026-10-01 already carries. |
| 2026-10-02 | ameren-mo-1m-2026-10-01 | content changed (523,145 -> 470,865 bytes, -52,280) · 94df4292b245 → cc48911ab61f | re-encoded Ameren Missouri's fuel adjustment for 1 October 2026 to 31 January 2027: $0.00894 -> $0.00445/kWh at secondary voltage, about -$4.49 on 1,000 kWh. Encoded as ameren-mo-1m-2026-10-01. |
| 2026-10-02 | aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (180,694 -> 180,712 bytes, +18) · 01f20c788f4d → 02bdca42229a | already encoded The page now links AEP's October documents (Ohio_Power tariff book and 29 September workbooks), which both October AEP Ohio encodings were built from on 1 October. |
| 2026-10-02 | ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01 | content changed (756,541 -> 758,652 bytes, +2,111) · 83d4d7016937 → 62a6175a9db1 | already encoded PUCO published Ohio Edison's Oct-Dec Price to Compare, $0.1107/kWh. The October encoding's supply riders sum to 11.0703c, so it now reconciles; no rate changes. |
| 2026-10-02 | dominion-nc-schedule-1-2025-02-01 | content changed (2,831,845 -> 3,220,827 bytes, +388,982) · 0a2ce93d3a0f → 2061ac127f2c | no rate change Dominion North Carolina's filing is back to the 2 October edition, byte-identical, with its revised cogeneration purchase rates (Schedules 19-FP and 19-LMP). Its server keeps alternating two editions; neither changes Schedule 1 or its riders. |
| 2026-10-01 | oncor-residential-2026-10-04 | content changed (86,751 -> 88,333 bytes, +1,582) · 461fbefad946 → dcc63098a028 | no rate change PUCT's 1 October comparison: CenterPoint 6.5333c (already encoded) and Oncor unchanged at 6.0295c. AEP Texas and TNMP moved, but neither is encoded here. |
| 2026-10-01 | pacificorp-wa-16-2026-10-01 | content changed (94,970 -> 100,385 bytes, +5,415) · 0235d1c287d5 → bbbc07ccd4a5 | re-encoded Schedule 99 Production Tax Credit Tracker re-set from 1 October (Advice 26-03): Schedule 16 residential -0.105c -> -0.073c/kWh, about +$0.32 on 1,000 kWh. Encoded as pacificorp-wa-16-2026-10-01. |
| 2026-10-01 | pacificorp-wa-16-2026-10-01 | content changed (155,919 -> 155,983 bytes, +64) · e148b42068ac → 1ff578e6b713 | already encoded New edition effective 1 October 2026. Only Schedule 99 moved (-0.105c -> -0.073c on Schedule 16), Combined 14.311c -> 14.343c, which matches the re-encoded pacificorp-wa-16-2026-10-01 exactly. |
| 2026-10-01 | firstenergy-pa-met-ed-rs-2026-10-01, firstenergy-pa-penelec-rs-2026-10-01, firstenergy-pa-penn-power-rs-2026-10-01, firstenergy-pa-west-penn-rs-2026-10-01 | content changed (2,670,261 -> 2,670,563 bytes, +302) · 166d11e77601 → 665736ea46b7 | re-encoded Supplement 40 re-sets the DSIC for 1 Oct-31 Dec: Met-Ed 0.31% -> 2.02%, Penelec 1.35% -> 2.70%, Penn Power 0.69% -> 2.40%, West Penn 0.26% -> 0.75%. About +$0.35 to +$2.32 on a 1,000 kWh month. All four districts re-encoded from 1 October. |
| 2026-10-01 | ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01 | content changed (9,420,904 -> 9,410,795 bytes, -10,109) · 556ab6b74b89 → 85f686b09eae | re-encoded Ohio Edison's quarterly riders re-filed for 1 October. On Rate RS: GCR 0.7639c -> 0.9846c, PIPP 0.365c -> 0.465c, Modern Grid $2.273 -> $1.299/month, plus small moves in AER, NDU, DUN, PUR, DRR and EDR. Net +0.22c/kWh. Encoded as ohio-edison-rs-2026-10-01. |
| 2026-10-01 | duke-fl-rs1-2026-10-01 | content changed (157,627 -> 138,469 bytes, -19,158) · b4feaa5433dd → af59656fad64 | re-encoded RS-1 base charges re-issued for 1 October: customer $14.35 -> $14.43, non-fuel energy up about 0.6% (7.686c -> 7.731c first 1,000 kWh, Mar-Nov). With the fuel rise, about +$7.15 on a 1,000 kWh month. Encoded as duke-fl-rs1-2026-10-01. |
| 2026-10-01 | duke-fl-rs1-2026-10-01 | content changed (192,878 -> 194,714 bytes, +1,836) · 58c1df6cecd2 → a5567a1eb63a | re-encoded RS-1 fuel charge rises from 1 October: 3.465c -> 4.127c/kWh on the first 1,000 kWh and 4.535c -> 5.197c above. Cost recovery factors unchanged. Encoded as duke-fl-rs1-2026-10-01. |
| 2026-10-01 | dominion-va-schedule-1-2026-11-01 | content changed (111,638 -> 111,754 bytes, +116) · 4c88430e6d4d → 5c3eff837f08 | no rate change Rider SMR's entry now states its period, 09-01-26 through 08-31-27, and the filing date changed. No rider was added to or removed from any schedule, and no rate moved. |
| 2026-10-01 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (20,726,127 -> 20,725,618 bytes, -509) · 468f3e607a9f → e4fb28001b31 | re-encoded Karn 1 and 2 securitization re-set for the October 2026 billing month, 0.4049c -> 0.4237c/kWh on RSP and RSH. Re-encoded from 1 October, also correcting LIEAF to $1.50 (in force since September) and power plant securitization to 0.1156c (since August). |
| 2026-10-01 | aep_ohio_gs_workbook | content changed (1,658,470 -> 1,660,735 bytes, +2,265) · f21cf6cc11b2 → 6e1e6440632f | already encoded The workbook watch was repointed to AEP's 29 September Ohio Power file, so this is the October calculator. The GS October encoding was built from it the same day. |
| 2026-10-01 | aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (180,739 -> 180,694 bytes, -45) · 7e5fa71f4ae9 → 01f20c788f4d | no rate change A reboot-time capture of the page's static HTML, which still links September's documents. The October documents were found and encoded on 1 October from the rendered page. |
| 2026-10-01 | oncor-residential-2026-10-04 | content changed (88,310 -> 276,445 bytes, +188,135) · ef82a74e730e → 8e5a29b689b3 | no rate change Only the report's 'As of' month changed, September to October. Every Oncor figure is identical, still $1.48 + $2.58 and 6.0295c/kWh. |
| 2026-10-01 | centerpoint-houston-residential-2026-09-30 | content changed (84,702 -> 269,441 bytes, +184,739) · a84704f673d3 → 1b60f48c2b43 | already encoded The PUCT report now prints CenterPoint's 30 September rates: 6.5333c/kWh, $70.23 on 1,000 kWh. That is exactly the encoding re-encoded that morning, so it now reconciles to the cent. |
| 2026-10-01 | sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01 | content changed (1,508,586 -> 1,506,451 bytes, -2,135) · 28cc218a0325 → 022b96ee3518 | no rate change SCE's Schedule TOU-D was captured truncated on 24 October - 93 KB of a 1.5 MB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate on any TOU-D plan moved. |
| 2026-10-01 | sce-d-2026-10-01 | content changed (683,345 -> 684,211 bytes, +866) · fa36ec00be6f → 19d67a0de6ed | no rate change SCE's Schedule D was captured truncated on 24 October - 77 KB of a 684 KB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate moved. |
| 2026-10-01 | bge-r-2026-10-01 | content changed (232,854 -> 229,926 bytes, -2,928) · e0fb2fc3401e → 8d134a8f417b | re-encoded BGE's October SOS period: Schedule R supply 15.190c before Rider 8; BGE's published Price to Compare is 14.140c (was 14.609c). With Rider 25 at (0.173)c for October, about -$4.24 on 1,000 kWh. Encoded as bge-r-2026-10-01. |
| 2026-10-01 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (92,551 -> 94,420 bytes, +1,869) · 64a067343ce1 → 8e63423fb910 | re-encoded Xcel corrected its 29 August summary for commercial classes; residential rows unchanged. The correction showed Schedule SG missing the 14.12% GRSA and new PCCA/TCA from 29 August, and two riders wrong since July. SG re-encoded from the filed sheets for all three periods. |
| 2026-10-01 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (921,619 -> 922,986 bytes, +1,367) · d88e7afb1925 → 874ea978a077 | no rate change Sheet 93.3 revised city franchise fees for Minneapolis and Newport from October. Franchise fees are excluded from these plans; no encoded rate moved. |
| 2026-10-01 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed (130,606 -> 130,650 bytes, +44) · 81874a6b4524 → 596ce8d7882e | re-encoded NYSEG Transition Charge Statement 265: the SC1 credit deepens from 0.2525c to 0.6072c/kWh, lowering delivery by 0.355c/kWh. Effective 1 October; encoded as the October vintage. |
| 2026-10-01 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed (47,041,848 -> 47,338,008 bytes, +296,160) · 6e881092d434 → 2127d1310d33 | no rate change NYSEG added a Host Community Benefit Program leaf: an annual bill credit for customers in towns hosting a major renewable facility, which depends on address. No SC1 rate moved. |
| 2026-10-01 | niagara-mohawk-sc1-2026-04-01 | content changed (49,893,023 -> 49,735,401 bytes, -157,622) · a49fd21c9808 → 6898e380d844 | no rate change Niagara Mohawk added the statewide Renewable Host Community Benefit Program, an address-dependent annual credit. No SC1 rate moved. |
| 2026-10-01 | coned-sc1-2026-02-01 | content changed (113,061,794 -> 65,457,729 bytes, -47,604,065) · 309233358ea4 → d26937fdfbc2 | no rate change Con Edison added the statewide Renewable Host Community Benefit Program, an address-dependent annual credit for SC1. No SC1 rate moved. |
| 2026-10-01 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (3,690,332 -> 3,721,007 bytes, +30,675) · 050f62e50476 → 05b228bb64b6 | no rate change The MPSC added its September PSCR page: Consumers Energy unchanged at 14.56 mills/kWh, as already encoded. No rate change for these plans. |
| 2026-10-01 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (147,320 -> 148,562 bytes, +1,242) · 8e7e8d69c931 → afdcc0d82b03 | re-encoded LIPA Statement 118 sets October's Power Supply Charge at 13.9200c/kWh, down from 13.9822c; the time-of-use factors are unchanged. Effective 1 October; all four SC-1 plans re-encoded. |
| 2026-10-01 | fpl-rs1-2026-10-01 | content changed (1,452,482 -> 1,271,113 bytes, -181,369) · 9766f7409a3c → aca4fa294de1 | already encoded FPL removed September's one-month storm restoration refund (-0.797c/kWh on RS-1). The October vintage restoring January's rates was already on the scheduled shelf and took effect 1 October. |
| 2026-10-01 | cps-ra-2026-11-01, cps-re-2026-11-01 | content changed (147,309 -> 149,562 bytes, +2,253) · 0807df05f74a → 35fbea7eb552 | re-encoded CPS published October's residential fuel and regulatory factor at 4.599c/kWh (August's 4.103c had been encoded, and September's 4.145c was missed). Effective 1 October; RE and RA re-encoded. |
| 2026-10-01 | aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (177,004 -> 180,739 bytes, +3,735) · fd5019313e1a → 7e5fa71f4ae9 | re-encoded AEP Ohio's October filing (now titled Ohio Power): transmission 4.344c to 4.412c, PIPP 0.552c to 0.636c, gridSMART $2.65 to $1.26/month, auction reconciliation +0.412c to -0.372c. Effective 1 October; RS and GS Secondary re-encoded. |
| 2026-10-01 | sdge-dr-2026-08-01 | content changed (7,077 -> 7,037 bytes, -40) · 4eaf0e1793ab → 6d30751e0680 | no rate change SDG&E's schedule index updated its sheet counts. SDG&E's own Total Electric Rates page still lists the 8/1/26 Schedule DR table as current, which is what is encoded. No rate change. |
| 2026-10-01 | centerpoint-houston-residential-2026-09-30 | content changed (6,773,222 -> 6,672,808 bytes, -100,414) · 362d77774cd3 → b6519f0c45b8 | re-encoded CenterPoint's DCRF rose from 0.4934c to 0.6137c/kWh (interim, Docket 59981), about $1.20 a month at 1,000 kWh. Effective 30 September; re-encoded. No other rider moved. |
| 2026-09-30 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3,310,707 -> 3,351,437 bytes, +40,730) · 1312faf7ec32 → 580e4013ff10 | re-encoded Q4 ECA and the annual EEAC reset, both from 1 October: Schedule R ECA 3.012c to 2.520c/kWh, RE-TOU and R-OO 29.00% to 29.42% of base, EEAC $0.83 to $0.86. Winter R 16.203c to 15.695c. Encoded onto the scheduled shelf; September rates apply until then. |
| 2026-09-30 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed, same size (47,041,848 bytes): 24841969c95c -> 6e881092d434 | no rate change NY DPS regenerated NYSEG's PSC 120 book on 30 September: identical text with one VDER leaf reordered. No figure, schedule or effective date moved. Riders are watched separately and did not change. |
| 2026-09-30 | niagara-mohawk-sc1-2026-04-01 | content changed, same size (49,893,023 bytes): 88ee4e77b8f3 -> a49fd21c9808 | no rate change NY DPS regenerated Niagara Mohawk's PSC 220 book on 30 September; only internal timestamps changed and the text is identical to the version encoded. No rate change. |
| 2026-09-30 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (122,468 -> 123,243 bytes, +775) · ce4c991ad407 → 74791ebdb91d | no rate change LIPA posted Value Stack Credit Statement 103 for October, replacing Statement 102. Value Stack credits apply to customer-generators on SC 2-L, 2L-VMRP, 2-MRP and 121, not to SC-1 bills, so no encoded rate changed. |
| 2026-09-30 | duke-in-rs-2026-11-01 | content changed (922,292 -> 926,929 bytes, +4,637) · 16e2c5260412 → 604022df18bc | no rate change Duke's tariff index page changed only its site scripts and footer. The Rate RS sheet, quarterly trackers, fuel and efficiency riders and sample bill this plan is built from are watched directly and did not change. |
| 2026-09-30 | dte-d1-11-2026-09-01, dte-d1-13-2026-09-01, dte-d1-2026-09-01 | content changed (2,611,623 -> 2,815,154 bytes, +203,531) · 310fb18c5820 → d9cadeb84131 | re-encoded DTE's LIEAF charge rose from $1.25 to $1.50 a month for bills from 1 September (Sheet C-69), taking the fixed charge on D1, D1.11 and D1.13 from $9.75 to $10.00. No energy rate moved. Re-encoded as the 2026-09-01 vintages. |
| 2026-09-29 | pge-e1-2026-06-01 | content changed, same size (656,128 bytes): 39fbba73bbe0 -> ec38d13fec76 | no rate change PG&E regenerated the Schedule E-1 PDF on 28 September; only the file's internal timestamps changed, and the text is identical to the version encoded. No rate change. |
| 2026-09-25 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (921,104 -> 921,619 bytes, +515) · e2d8bb7a7189 → d88e7afb1925 | no rate change Sheet 93.4 revised: the Rogers city franchise fee rose from $5.00 to $8.00 a month (residential) from September. City franchise fees are excluded from these plans, so no encoded rate changed. |
| 2026-09-25 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3,263,631 -> 3,310,707 bytes, +47,076) · 08ff17f819a3 → 1312faf7ec32 | no rate change Sheets 33 and 39 revised, effective 28 September: RE-TOU and C-TOU availability now sets the transition date for advanced meters received after 2025. Wording only; no rate figure moved anywhere in the book. |
| 2026-09-25 | centerpoint-houston-residential-2026-09-30 | content changed (342,611 -> 342,485 bytes, -126) · 56bd26789f68 → 9069df1e3c12 | no rate change Page text unchanged; CenterPoint dropped the version tag from its tariff link. The linked book is byte-identical to the 22 September filing already encoded. No rate change. |
| 2026-09-25 | apco-va-rs-2026-11-01 | content changed (179,124 -> 179,299 bytes, +175) · 3aea9953ecfe → 550f1eec6b7a | re-encoded APCo filed Virginia's Rider B.C.-RAC update: 0.059c to 0.211c/kWh, taking the all-in rate 16.037c to 16.189c (+$1.52/month at 1,000 kWh). Effective 24 September; re-encoded as apco-va-rs-2026-09-24, which now matches APCo's $169.85 typical bill. |
| 2026-09-24 | pacificorp-wy-2-2026-07-01 | content changed (253,270 -> 372,983 bytes, +119,713) · a9190425e7b4 → e354553c6914 | no rate change Rocky Mountain Power's server has served two editions of Schedule 95. Today's is the current Third Revision (effective 1 July 2026, ECAM deferred 0.331c), which the encoding already carries. No rate change. |
| 2026-09-24 | pacificorp-wy-2-2026-07-01 | content changed (192,524 -> 307,286 bytes, +114,762) · ba9434f77ef4 → c277caef5168 | no rate change Rocky Mountain Power's server alternates two revisions of Schedule 93 at one URL. Today's copy is byte-identical to the current one held since 19 Sep; the encoded -0.053c is unchanged. No rate change. |
| 2026-09-24 | pacificorp-ut-1-2026-09-25 | content changed (391,727 -> 624,886 bytes, +233,159) · 34e7de80f8a4 → d147ca4d3c3f | no rate change Rocky Mountain Power's server alternates two editions of Schedule 94. Today's is byte-identical to the current P.S.C.U. No. 52 copy held since 19 Sep; the encoded 7.63% EBA is unchanged. No rate change. |
| 2026-09-24 | pacificorp-wa-16-2026-10-01 | content changed (152,245 -> 155,919 bytes, +3,674) · 12efe4dd6ff7 → e148b42068ac | no rate change Pacific Power's server alternates the April and September editions of this summary. Today's is the 1 September edition, byte-identical to 20 Sep, matching the encoded 14.311c combined rate. No rate change. |
| 2026-09-24 | pacificorp-ca-d-2026-06-08 | content changed (136,871 -> 116,351 bytes, -20,520) · cb042e2c1257 → d46854dc406b | no rate change Pacific Power's server alternates two editions of Schedule S-96. Today's is the current July 2026 sheet ($12.17/month), byte-identical to 20 Sep and already encoded. No rate change. |
| 2026-09-24 | pacificorp-ca-d-2026-06-08 | content changed (129,955 -> 149,685 bytes, +19,730) · 7b9d7ecebbb8 → 6540243be2b4 | no rate change Pacific Power's server alternates two editions of Schedule ECAC-94. Today's is the current June 2026 sheet (5.286c), byte-identical to 19 Sep and already encoded. No rate change. |
| 2026-09-22 | pacificorp-ut-1-2026-09-25 | content changed (178,860 -> 321,062 bytes, +142,202) · 87fda3eeef9f → 82e58663f584 | no rate change The CDN returned the current Third Revision of Sheet 1.2 again, byte-identical to 27 August, after serving the superseded Second on the 21st. No rate moved. Utah's encoding is built from the Third and is unaffected. |
| 2026-09-22 | ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01 | content changed (109,283 -> 158,145 bytes, +48,862) · 81a615a92c93 → ca18a49f4aa0 | re-encoded Ameren filed Rider CSESC's October-December 2026 quarter at $0.00008/kWh, down from $0.00009 since April - about twelve cents a year at 12,000 kWh. Encoded onto the scheduled shelf for 1 October; September's rate is unaffected. |
| 2026-09-22 | pacificorp-ut-1-2026-09-25 | content changed (624,886 -> 391,727 bytes, -233,159) · d147ca4d3c3f → 34e7de80f8a4 | no rate change Rocky Mountain Power re-served Schedule 94 from the SUPERSEDED tariff book P.S.C.U. No. 51, which prints the old 22.14% EBA. Book 52, in force since the 10 Aug rate case, carries 7.63% - the encoded figure. No rate moved. |
| 2026-09-22 | pacificorp-ca-d-2026-06-08 | content changed (116,351 -> 136,871 bytes, +20,520) · d46854dc406b → cb042e2c1257 | no rate change Pacific Power served the superseded Cal.P.U.C. Sheet 5266-E in place of 5306-E. The current sheet carries the CEMA surcharge at $12.17/month on Schedule D, effective 10 July 2026, which pacificorp-ca-d already encodes. No rate moved. |
| 2026-09-22 | pacificorp-ca-d-2026-06-08 | content changed (149,685 -> 129,955 bytes, -19,730) · 6540243be2b4 → 7b9d7ecebbb8 | no rate change Pacific Power served an older ECAC-94 compilation (top sheet 5211-E) in place of 5303-E. The sheet in force gives Schedule D 4.498c base plus 0.788c adjustment = 5.286c, which is the encoded figure. No rate moved. |
| 2026-09-22 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (20,733,449 -> 20,726,127 bytes, -7,322) · 35f8197efd4c → 468f3e607a9f | no rate change Consumers filed the 83rd Revised Sheet D-6.00, filling in the October 2026 PSCR factor at $0.01456/kWh - the same figure billed since July. No rate moved. The encoding already carries it; the note claiming August was unpublished is refreshed. |
| 2026-09-22 | centerpoint-houston-residential-2026-09-30 | content changed (320,166 -> 342,611 bytes, +22,445) · 5de9b19289cb → 56bd26789f68 | re-encoded CenterPoint republished its tariff book on 22 Sep carrying rates effective 1 September. Four riders moved, Rider TCRF 1.6173c to 3.0812c the bulk of it: delivery goes 5.1461c to 6.4130c per kWh, about +$12.67 a month at 1,000 kWh. Re-encoded. |
| 2026-09-22 | ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01 | content changed (138,520 -> 138,884 bytes, +364) · 3bc923be1b4b → 536b41d81709 | re-encoded Ameren filed Rider EEA for October 2026 at 0.00985 c/kWh, from September's 0.00987 - about two hundredths of a cent a year at 12,000 kWh. Re-encoded; the September vintage had been carrying August's figure. |
| 2026-09-22 | aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (177,001 -> 177,004 bytes, +3) · 84ced2492d03 → fd5019313e1a | no rate change AEP replaced the Residential Rate to Compare workbook with a 'v1' of the same 08282026 date. One cell differs - Customer Info!C25, 2025 to 2026. Every Price to Compare figure is identical. The old URL now 404s and the watched source is repointed. |
| 2026-09-21 | pacificorp-wy-2-2026-07-01 | content changed (307,286 -> 192,524 bytes, -114,762) · c277caef5168 → ba9434f77ef4 | no rate change Rocky Mountain Power re-served the superseded First Revision of Sheet 93-5 (issued Jul 2025, Schedule 2 at -0.065c). The Second Revision, issued Apr 2026, is in force: -0.050c base and -0.003c deferred, the encoded -0.053. No rate moved. |
| 2026-09-21 | pacificorp-ut-1-2026-09-25 | content changed (321,062 -> 178,860 bytes, -142,202) · 82e58663f584 → 87fda3eeef9f | no rate change The superseded Second Revision of Sheet 1.2, effective Dec 2025, came back for the third time. The Third Revision, effective 10 Aug 2026, is current and byte-identical to the 19 Sep capture. No rate moved. |
| 2026-09-21 | pacificorp-ut-1-2026-09-25 | content changed (134,547 -> 133,778 bytes, -769) · 40d5255b44e9 → 9176ff6f29e6 | no rate change RMP published the 10 Aug 2026 edition, replacing 1 Jun 2026. It is the first to print GRCDA (Sch 92) and WBA (Sch 97) as columns, and all 13 encoded Utah constants agree with it. No rate moved; a disclosed reconciliation gap closes. |
| 2026-09-21 | pacificorp-wa-16-2026-10-01 | content changed (142,679 -> 140,510 bytes, -2,169) · 9a38c4070e48 → 6d23667ed059 | no rate change Pacific Power serves two revisions of this URL. The 21 Sep capture is the Tenth Revision of Sheet 93.1, byte-identical to 19 Sep; the 20th served the superseded Ninth. No rate moved - the encoded 0.549 c/kWh decoupling adjustment stands. |
| 2026-09-21 | pacificorp-wa-16-2026-10-01 | content changed (155,919 -> 152,245 bytes, -3,674) · e148b42068ac → 12efe4dd6ff7 | no rate change Two editions at one URL: 21 Sep returned the 3 April 2026 summary, 20 Sep the 1 September 2026 one. September is in force and is what pacificorp-wa-16 is built from (combined 14.311 c/kWh). No rate moved. |
| 2026-09-20 | pacificorp-wa-16-2026-10-01 | content changed (140,510 -> 142,679 bytes, +2,169) · 6d23667ed059 → 9a38c4070e48 | re-encoded The Tenth Revision of Sheet 93.1 sets the decoupling adjustment at 0.549 c/kWh from 1 September, against the 0.315 encoded. Same change as the Price Summary; pacificorp-wa-16 re-encoded to 2026-09-01. |
| 2026-09-20 | pacificorp-wa-16-2026-10-01 | content changed (152,245 -> 155,919 bytes, +3,674) · 12efe4dd6ff7 → e148b42068ac | no rate change Pacific Power's server alternates the April and September editions of this summary. Today's is the 1 September edition, byte-identical to 20 Sep, matching the encoded 14.311c combined rate. No rate change. |
| 2026-09-20 | pacificorp-ca-d-2026-06-08 | content changed (136,871 -> 116,351 bytes, -20,520) · cb042e2c1257 → d46854dc406b | no rate change Pacific Power's server alternates two editions of Schedule S-96. Today's is the current July 2026 sheet ($12.17/month), byte-identical to 20 Sep and already encoded. No rate change. |
| 2026-09-19 | pacificorp-ut-1-2026-09-25 | content changed (178,860 -> 321,062 bytes, +142,202) · 87fda3eeef9f → 82e58663f584 | no rate change The CDN returned the current Third Revision of Sheet 1.2 again, byte-identical to 27 August, after serving the superseded Second on the 21st. No rate moved. Utah's encoding is built from the Third and is unaffected. |
| 2026-09-18 | pacificorp-ut-1-2026-09-25 | content changed (321,062 -> 178,860 bytes, -142,202) · 82e58663f584 → 87fda3eeef9f | no rate change The superseded Second Revision of Sheet 1.2, effective Dec 2025, came back for the third time. The Third Revision, effective 10 Aug 2026, is current and byte-identical to the 19 Sep capture. No rate moved. |
| 2026-09-16 | jcpl-rs-2026-10-01 | content changed, same size (81,212 bytes): 0e1d95e84dd2 -> 64870a4582ad | no rate change JCP&L's regulatory filings page changed by one word of navigation text: 'Pay As A Guest' became 'Pay as a Guest'. Nothing else moved - all 146 links identical, no figure at any precision. This page carries proceedings rather than rates, and jcpl-rs-2026-07-15 is unaffected. |
| 2026-09-15 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (83,921 -> 83,812 bytes, -109) · 3a1535344d1c → abfeb44a3962 | already encoded Xcel's Summary of Electric Rates as of 09-01-26 is the published total these three plans were encoded ahead of on 29 August. Read 16 Sep: all eight rates and the service charge reconcile. One correction - Schedule R-OO winter 0.15455 to 0.15456/kWh, a hundredth of a cent, from where Xcel takes the RESA uplift. |
| 2026-09-12 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (20,686,464 -> 20,733,449 bytes, +46,985) · 419c6bbeb711 → 35f8197efd4c | no rate change Consumers added Rule C5.7, an Extreme Weather Conditions policy suspending shutoffs for nonpayment in qualifying weather, on Sheet C-26.00 effective 2 September. A service rule, not a charge: no rate, rider or schedule figure moved. RSH and RSP are unaffected. |
| 2026-09-12 | apco-wv-rs-2026-09-01 | content changed (168,483 -> 168,488 bytes, +5) · f48f0adab25f → 466da6c91dcc | already encoded APCo published its filed September sheets: ENEC_Tariff_Sheets_Eff_9-1-26.pdf replaces the July file. Rider E.N.E.C. 5.7790c to 5.8570c/kWh from 1 September - which is the rate already being served. It was derived from APCo's own typical bill on 4 September and the filed sheet now confirms it to the digit. |
| 2026-09-12 | pseg-rs-2026-07-15, pseg-rs-tou-3p-2026-07-15 | content changed (1,729,715 -> 1,731,718 bytes, +2,003) · 7ce40f28482d → baf93c0f324a | no rate change A re-export of the same tariff. One stray character was removed from a contents-page header; the other 657,801 characters of extracted text are identical. No figure moved and no schedule name entered or left an applicability list. |
| 2026-09-11 | nspmn-residential-2026, nspmn-residential-esh-2026 | content changed (924,377 -> 921,104 bytes, -3,273) · 8d69619a546a → e2d8bb7a7189 | no rate change superseded - answered by the review of 2026-10-29 on a later version of this document |
| 2026-09-11 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (122,469 -> 122,468 bytes, -1) · 6a3a6e1feba2 → ce4c991ad407 | no rate change superseded - answered by the review of 2026-11-03 on a later version of this document |
| 2026-09-10 | ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01 | content changed (108,726 -> 108,052 bytes, -674) · a3a1fb85ed4a → 9ada1bdf55f0 | no rate change superseded - answered by the review of 2026-11-07 on a later version of this document |
| 2026-09-10 | ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01 | content changed (136,912 -> 136,363 bytes, -549) · 4fc2c0707913 → 8d8236f8c556 | not yet reviewed |
| 2026-09-10 | ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01 | content changed (93,248 -> 92,764 bytes, -484) · f19dae6bf274 → d8ae3e6db028 | not yet reviewed |
| 2026-09-09 | pseg-rs-2026-07-15, pseg-rs-tou-3p-2026-07-15 | content changed (1,731,866 -> 1,729,715 bytes, -2,151) · 7ebcd8b2d310 → 7ce40f28482d | no rate change superseded - answered by the review of 2026-09-12 on a later version of this document |
| 2026-09-08 | oconomowoc-rg1-2026-07 | content changed (155,318 -> 157,061 bytes, +1,743) · 7a7574f56ce2 → a6ee9e53ea54 | no rate change superseded - answered by the review of 2026-11-10 on a later version of this document |
| 2026-09-06 | dominion-va-schedule-1-2026-11-01 | content changed (219,233 -> 219,315 bytes, +82) · cc82f7c61f36 → 3319327f49c7 | no rate change Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates. |
| 2026-09-05 | duke-in-rs-2026-11-01 | content changed (318,690 -> 319,848 bytes, +1,158) · c3dcd7eb6369 → 4d2ae5f63bf0 | re-encoded Duke Indiana added a September Credits Adjustment row: RS goes -0.006040 -> -0.005557, so the credit shrinks and the bill rises 0.000483 $/kWh, about $0.48/month at 1,000 kWh. Re-encoded as duke-in-rs-2026-09-01. |
| 2026-09-05 | dominion-va-schedule-1-2026-11-01 | content changed (9,248,506 -> 9,249,299 bytes, +793) · 117a538f3348 → 2231c2aca3b3 | no rate change No rate moved. Both captures carry all seven 09-01-2026 rider values and none of the 2025 ones - which is what proves the bill-calculator worksheet regressed rather than the rates changing. |
| 2026-09-05 | dominion-va-schedule-1-2026-11-01 | content changed (219,315 -> 219,233 bytes, -82) · 3319327f49c7 → cc82f7c61f36 | no rate change superseded - answered by the review of 2026-11-08 on a later version of this document |
| 2026-09-04 | oge-ok-r1-2026-11-01 | content changed (642,897 -> 646,532 bytes, +3,635) · 6fbaf9cde3b9 → 3b35ba2a46b1 | no rate change superseded - answered by the review of 2026-11-03 on a later version of this document |
| 2026-09-04 | nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01 | content changed (261,443 -> 261,249 bytes, -194) · 6cf99b790a5b → c8691d6937c7 | not yet reviewed |
| 2026-09-04 | nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01 | content changed (85,403 -> 84,844 bytes, -559) · c59d1e5eec2c → ac507a4377f9 | no rate change superseded - answered by the review of 2026-11-05 on a later version of this document |
| 2026-09-04 | entergy-texas-rs-2026-11-01 | content changed (52,918 -> 53,275 bytes, +357) · 557937ac111a → 803c57706d15 | re-encoded superseded - answered by the review of 2026-11-04 on a later version of this document |
| 2026-09-04 | entergy-neworleans-res25-2026-11-01 | content changed (53,013 -> 52,950 bytes, -63) · 4beff9824232 → 7ec318a0cd80 | already encoded superseded - answered by the review of 2026-11-04 on a later version of this document |
| 2026-09-04 | entergy-mississippi-rs40c-2026-10-01 | content changed (54,968 -> 54,917 bytes, -51) · 53935c6bf6ec → fc222d375c94 | no rate change superseded - answered by the review of 2026-11-04 on a later version of this document |
| 2026-09-04 | entergy-louisiana-rs-2026-11-01 | content changed (58,053 -> 57,929 bytes, -124) · ea6ce4435cf7 → 8434ecc9fead | already encoded Entergy Louisiana's September sample bill confirms the four factors shipped on 09-01 before any total existed. Rebuilt line by line it comes to $147.35 exactly. Encoding unchanged, now reconciled rather than structurally checked. |
| 2026-09-04 | entergy-arkansas-rs-2026-08-01 | content changed (54,702 -> 54,618 bytes, -84) · 1b4e6a31ceee → 2d133b2958fb | no rate change superseded - answered by the review of 2026-11-04 on a later version of this document |
| 2026-09-04 | apco-wv-rs-2026-09-01 | content changed (172,773 -> 168,483 bytes, -4,290) · 46ffc294e6a9 → f48f0adab25f | re-encoded APCo advanced its West Virginia typical bill to 1 September 2026: $183.07 at 1,000 kWh, $344.53 at 2,000. The September energy rate is derived from those totals, not transcribed - the filed tariff PDF has not moved. |
| 2026-09-04 | pseg-rs-2026-07-15, pseg-rs-tou-3p-2026-07-15 | content changed (1,732,840 -> 1,731,866 bytes, -974) · f1f0800546ad → 7ebcd8b2d310 | no rate change superseded - answered by the review of 2026-09-12 on a later version of this document |
| 2026-09-03 | oge-ok-r1-2026-11-01 | content changed (643,295 -> 642,897 bytes, -398) · e429c0e0b11e → 6fbaf9cde3b9 | no rate change superseded - answered by the review of 2026-11-03 on a later version of this document |
| 2026-09-03 | jcpl-rs-2026-10-01 | content changed (80,881 -> 81,212 bytes, +331) · 90c88b3acb1f → 0e1d95e84dd2 | no rate change superseded - answered by the review of 2026-11-06 on a later version of this document |
| 2026-09-03 | dominion-va-schedule-1-2026-11-01 | content changed (219,233 -> 219,315 bytes, +82) · cc82f7c61f36 → 3319327f49c7 | no rate change Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates. |
| 2026-09-02 | dominion-va-schedule-1-2026-11-01 | content changed (9,137,677 -> 9,248,506 bytes, +110,829) · 72bc8515894a → 117a538f3348 | re-encoded superseded - answered by the review of 2026-11-02 on a later version of this document |
| 2026-09-01 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3,161,074 -> 3,263,631 bytes, +102,557) · f33d53b3412c → 08ff17f819a3 | no rate change Three sheets re-filed, narrowing what the rider may recover to non-fuel costs incremental to base rates. A definitional change; not one figure in the book moved. |
| 2026-09-01 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (146,856 -> 147,320 bytes, +464) · d43c930eab32 → 8e7e8d69c931 | re-encoded superseded - answered by the review of 2026-11-03 on a later version of this document |
| 2026-09-01 | lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01 | content changed (122,464 -> 122,469 bytes, +5) · 43fbb53cf389 → 6a3a6e1feba2 | no rate change superseded - answered by the review of 2026-11-03 on a later version of this document |
| 2026-09-01 | fpl-rs1-2026-10-01 | content changed (1,015,649 -> 1,452,482 bytes, +436,833) · 768ed71047ec → 9766f7409a3c | already encoded FPL filed a one-month RS-1 storm-refund credit of 0.797 c/kWh for September. Already encoded: fpl-rs1-2026-09-01 carries it and fpl-rs1-2026-10-01 already restores the pre-refund rate. |
| 2026-09-01 | jcpl-rs-2026-10-01 | content changed (80,936 -> 81,147 bytes, +211) · b1fd16843c11 → 0e9904916dfc | re-encoded superseded - answered by the review of 2026-10-08 on a later version of this document |
| 2026-09-01 | entergy-neworleans-res25-2026-11-01 | content changed (90,780 -> 90,507 bytes, -273) · 698882aaae60 → d0ea4cc8b8c8 | re-encoded superseded - answered by the review of 2026-11-02 on a later version of this document |
| 2026-09-01 | entergy-neworleans-res25-2026-11-01 | content changed (103,759 -> 103,972 bytes, +213) · 21e0eb6fc9dc → adfb95b93219 | re-encoded superseded - answered by the review of 2026-11-02 on a later version of this document |
| 2026-09-01 | entergy-neworleans-res25-2026-11-01 | content changed (438,679 -> 116,997 bytes, -321,682) · fd93479872bb → 377cd7c2d5aa | not yet reviewed |
| 2026-09-01 | entergy-neworleans-res25-2026-11-01 | content changed (78,545 -> 78,624 bytes, +79) · f3efd4da2d74 → 3311e8016118 | re-encoded The September EAC row moved 0.000001 -> 0.000000 in a table where both values already appeared, so a set comparison could not see it. Re-encoded as entergy-neworleans-res25-2026-09-01 for the three factors that moved. |
| 2026-09-01 | entergy-louisiana-rs-2026-11-01 | content changed (91,757 -> 91,884 bytes, +127) · 3e1ed1a496be → 533ccc4a517a | re-encoded superseded - answered by the review of 2026-11-02 on a later version of this document |
| 2026-09-01 | entergy-louisiana-rs-2026-11-01 | content changed (77,497 -> 77,517 bytes, +20) · be2e15e19e07 → 693b5be3e453 | no rate change superseded - answered by the review of 2026-11-02 on a later version of this document |
| 2026-09-01 | entergy-louisiana-rs-2026-11-01 | content changed (888,030 -> 515,509 bytes, -372,521) · 4fb57900e619 → 108ddd5a5cb9 | not yet reviewed |
| 2026-09-01 | entergy-louisiana-rs-2026-11-01 | content changed (728,718 -> 731,954 bytes, +3,236) · a53bfe619433 → dfd1f7ae9aab | not yet reviewed |
| 2026-09-01 | entergy-louisiana-rs-2026-11-01 | content changed (91,760 -> 91,740 bytes, -20) · 3dc1b34a361d → 93c276793853 | re-encoded superseded - answered by the review of 2026-11-02 on a later version of this document |
| 2026-09-01 | duke-fl-rs1-2026-10-01 | content changed (116,556 -> 192,878 bytes, +76,322) · 988e3e1c8fc6 → 58c1df6cecd2 | re-encoded Duke Florida Sheet 6.105, 114th revision: RS-1 Asset Securitization Charge 0.228 -> 0.238 c/kWh, about $0.10 on a 1,000 kWh bill. Re-encoded as duke-fl-rs1-2026-09-01. |
| 2026-09-01 | duke-carolinas-sc-rs-2026-11-01 | content changed (190,820 -> 92,922 bytes, -97,898) · 454d9a67fd93 → 563902d9918c | not yet reviewed |
| 2026-09-01 | duke-carolinas-nc-rs-2026-09-01 | content changed (177,287 -> 171,786 bytes, -5,501) · bc58a42cd632 → 6f1d9a3e197d | not yet reviewed |
| 2026-09-01 | duke-carolinas-nc-rs-2026-09-01 | content changed (187,056 -> 95,516 bytes, -91,540) · 57613605938a → c3e4ad1c8a77 | not yet reviewed |
| 2026-09-01 | dominion-va-schedule-1-2026-11-01 | content changed (111,953 -> 111,638 bytes, -315) · 3c0e020927d9 → 4c88430e6d4d | no rate change The exhibit carries no rates, only rider names and dates - and thirteen dates rolled to 09-01-26, signalling Dominion re-filed those riders. Their own rate documents are watched separately and drove the re-encode. |
| 2026-09-01 | nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01 | content changed (130,581 -> 130,606 bytes, +25) · 56e0656d88be → 81874a6b4524 | re-encoded superseded - answered by the review of 2026-11-02 on a later version of this document |
| 2026-08-31 | ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01 | content changed (9,462,305 -> 9,420,904 bytes, -41,401) · 6687904670eb → 556ab6b74b89 | re-encoded superseded - answered by the review of 2026-10-01 on a later version of this document |
| 2026-08-31 | sdge-dr-2026-08-01 | content changed (7,030 -> 7,077 bytes, +47) · cb14fc4056a8 → 4eaf0e1793ab | no rate change superseded - answered by the review of 2026-10-01 on a later version of this document |
| 2026-08-31 | bge-r-2026-10-01 | content changed (231,439 -> 232,854 bytes, +1,415) · 8ad0ac7016a0 → e0fb2fc3401e | re-encoded superseded - answered by the review of 2026-10-01 on a later version of this document |
| 2026-08-29 | pge-eelec-2026-06-01 | content changed (577,201 -> 578,052 bytes, +851) · a515ec2cd50d → 58d2bebe3aa8 | not yet reviewed |
| 2026-08-28 | jcpl-rs-2026-10-01 | content changed (80,409 -> 80,881 bytes, +472) · 6a6432c723e4 → 90c88b3acb1f | no rate change superseded - answered by the review of 2026-11-06 on a later version of this document |
| 2026-08-28 | aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (774996 -> 774996 bytes) · 4b3afcea890d → 38d079c1606f | no rate change Competitive supplier offers repriced; the Price to Compare did not move. Retailer plans are explicitly out of scope here, and the Price to Compare is the figure this encoding reconciles against. |
| 2026-08-28 | ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01 | content changed (756541 -> 756541 bytes) · 599cdc697ecf → 83d4d7016937 | no rate change Competitive supplier offers repriced; the Price to Compare did not move. Retailer plans are explicitly out of scope here, and the Price to Compare is the figure this encoding reconciles against. |
| 2026-08-28 | coned-sc1-2026-02-01 | content changed (65423665 -> 113061794 bytes) · 11d7ae6532d2 → 309233358ea4 | no rate change NY DPS re-rendered the PDF - it grew from 65MB to 113MB, but the extracted text is byte-identical, so nothing in it changed. NYSEG SC-1 rates unaffected. |
| 2026-08-28 | aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01 | content changed (774996 -> 774996 bytes) · 0a65b10b06c6 → 4b3afcea890d | re-encoded superseded - answered by the review of 2026-10-03 on a later version of this document |
| 2026-08-28 | ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01 | content changed (756541 -> 756541 bytes) · 96d72e0acd03 → 599cdc697ecf | already encoded superseded - answered by the review of 2026-10-02 on a later version of this document |
| 2026-08-28 | ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01 | content changed (756541 -> 756541 bytes) · bdb2e6db68e9 → 96d72e0acd03 | already encoded superseded - answered by the review of 2026-10-02 on a later version of this document |
| 2026-08-27 | psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29 | content changed (3166647 -> 3161074 bytes) · aef34657bfc1 → f33d53b3412c | no rate change superseded - answered by the review of 2026-11-12 on a later version of this document |
| 2026-08-27 | jcpl-rs-2026-10-01 | content changed (77321 -> 80409 bytes) · 0dd954eeb6a4 → 6a6432c723e4 | no rate change superseded - answered by the review of 2026-11-06 on a later version of this document |
| 2026-08-27 | jcpl-rs-2026-10-01 | content changed (77871 -> 80936 bytes) · 6b1aa552397e → b1fd16843c11 | re-encoded superseded - answered by the review of 2026-10-08 on a later version of this document |
| 2026-08-27 | consumers-rsh-2026-10-01, consumers-rsp-2026-10-01 | content changed (20699673 -> 20686464 bytes) · 9fde694b8148 → 419c6bbeb711 | no rate change The only two figures that moved are per-lineal-foot construction charges for new service connections, which are not part of a residential bill and are not encoded. Every per-kWh rate is unchanged. |
| 2026-08-27 | ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01 | content changed (108736 -> 108726 bytes) · e0bcfffd2a38 → a3a1fb85ed4a | no rate change superseded - answered by the review of 2026-11-07 on a later version of this document |
| 2026-08-27 | ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01 | content changed (93258 -> 93248 bytes) · 18c0b633c12b → f19dae6bf274 | not yet reviewed |
| 2026-08-26 | ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01 | content changed (223845 -> 210056 bytes) · 0e130fc046d0 → 2f9674e7872f | not yet reviewed |
| 2026-08-26 | ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01 | content changed (90599 -> 76878 bytes) · 838094c3fb2d → 84c65e41c044 | not yet reviewed |
| 2026-08-26 | ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01 | content changed (181902 -> 140080 bytes) · eed5d2ec226e → 0212e38667ec | no rate change Ameren Illinois replaced an escalating Energy Assistance Charge with one fixed at $0.80/month. The escalator had already reached $0.80 in January, so the billed amount is unchanged either side. |
| 2026-08-22 | Residential-rates | content changed (94318 -> 94318 bytes) · 3cd9e17c7623 → 1408f5bb1e40 | not yet reviewed |
| 2026-08-20 | sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01 | content changed (1722304 -> 1508586 bytes) · 523a6a569399 → 28cc218a0325 | no rate change superseded - answered by the review of 2026-10-25 on a later version of this document |
Whether the monitor ran each day. A gap is a day when staleness could not be ruled out. This is not an uptime chart - uptime is the wrong question for a data product. A day counts as checked whether or not anything changed, because a quiet day and a broken monitor must not look alike.
85 of 87 days checked since the first run on 2026-08-19 — 2 day(s) missed: 2026-10-23, 2026-11-13. A missed day is one where staleness could not be ruled out. Hover a cell for the date and how many of the 342 watched sources were checked that day. · The 3 pale cells are days before the monitor existed. They are not misses.
Time from detecting that a utility filed a change to the served rates being updated. This bounds how out-of-date any figure here can be, and it is computed from the record rather than promised.
Measured over every filing since launch, not the window above. Rate changes arrive roughly quarterly, so a 90-day window would usually contain too few to mean anything - and a median over one sample would look like precision it does not have.
Time from detecting a filing to the encoded rates being updated. Pending means detected and not yet encoded; filings reviewed as changing no rate, those encoded ahead of a future effective date, those already encoded before the source document changed at all, and those read but not yet confirmed by the filed source, are counted separately rather than averaged in.
Every rate API claims to be current, and from the outside that claim cannot be checked. This one can: the source documents are polled daily, every version is kept, and when a utility files something we have not encoded yet this page says so by name. A status page that can only report good news is marketing.
Browse rates ·
GET /health returns this page's summary as JSON, without a key.
GET /changes returns the change log as JSON, and needs one.