Rates out of date
A utility has filed a change we have detected and not yet encoded. The affected plans below are knowingly behind.
334 Sources watched
todayLast checked
today Last source change
today Last scheduled run
13 Plans awaiting re-encoding
7m45s Last run took

Filings encoded and pending

A change is filed but not yet in force. The rate served today is the one being billed today; the encoding below starts serving itself on its effective date, with no deploy.

Plan in forceSourceTakes effectBecomes
ppl-rs-2026-07-01pplelectric.com/Rate-Schedule-RS-Residential-Service.pdf2026-12-01ppl-rs-2026-12-01

Plans awaiting re-encoding

These are serving rates we already know predate a filing. Shown because you should not have to guess.

13 document(s) across 13 plan(s). A plan appears once per changed document, so the same plan can be listed more than once.

PlanSourceChange detectedEncoded from
pacificorp-wa-16-2026-10-01pp_wa_price_summary2026-11-072026-08-26
nstar-r1-cape-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r1-cape-delivery-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r1-mainland-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r1-mainland-delivery-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r1hp-cape-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r1hp-cape-delivery-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r1hp-mainland-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r1hp-mainland-delivery-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r3-cape-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r3-cape-delivery-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r3-mainland-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04
nstar-r3-mainland-delivery-2026-09-011-tariff-ma2026-09-04
same day — order not established
2026-09-04

Coverage

56% of US residential customers
100% of the 50 largest utilities
79.9M customers covered
45 utilities encoded

Two denominators, because one of them alone would mislead. 79,866,676 of 143,144,185 US residential customers is 55.8%. The same catalogue is 100.0% of the 79,866,676 customers served by the 50 largest utilities by residential customers (49 groups, 53 operating companies), which is where the work has deliberately gone — the country has 1,267 utilities selling residential electricity, and most of them are small municipals and co-ops.

Counted from EIA Form 861, 2024 data year, Sales_Ult_Cust (residential customer count), regenerated 2026-08-31. Customer counts are a census of households served, not of the plans encoded: a utility counts once it has a residential tariff here, whatever else it also files.

2 further utilities are encoded and serving but cannot appear in any of these figures: Oncor (TX, wires only), CenterPoint Energy Houston. Texas is deregulated, so EIA attributes those households to the retailers that sell them energy rather than to the wires company every one of them pays.

Detected changes

Every time a watched rate sheet stops matching the version the served rates were taken from. The monitor compares bytes, so it cannot tell a re-filed rate from a re-rendered PDF - both are real changes to the document and only one needs the rates re-derived. The outcome column says which, and a row that changed no rate is kept rather than hidden.

Showing the 82 most recent of 247. Show 247, or fetch the whole log as JSON from /changes (needs a key).

DetectedAffectsChange Outcome
2026-11-12psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (3,352,279 -> 3,354,566 bytes, +2,287) · 3bfafeaabffd → 7899fc8bb4b8no rate change
PSCo's rate book replaced Sheet 70 (Schedule TG, transmission-voltage service) under Advice 2037, effective 13 November: one new customer-specific charge, Metro Denver Sewage $8,140. No other charge changed, and no encoded PSCo plan (R, R-OO, RE-TOU, SG) takes Schedule TG.
2026-11-10nspmn-residential-2026, nspmn-residential-esh-2026content changed (1,521,110 -> 1,598,047 bytes, +76,937) · 5b5c104d9760 → e08ae6c67804no rate change
Xcel (NSP-Minnesota) re-filed Section 5 residential sheets effective 1 Oct 2026 with revision markers and rider notes moved. Every rate figure is unchanged, already encoded from 2 Oct; no rate moved and no re-encoding is needed.
2026-11-10oconomowoc-rg1-2026-07content changed (157,988 -> 157,654 bytes, -334) · 51e8c29be0ba → c4310e32bc62no rate change
City of Oconomowoc's Public Utilities web page was re-rendered; the only text change is a removed 'Photo Gallery' navigation link. No rate or figure changed, so the Oconomowoc RG-1 encoding is unchanged.
2026-11-08dominion-va-schedule-1-2026-11-01content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97no rate change
Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change.
2026-11-07pacificorp-wa-16-2026-10-01content changed (155,983 -> 155,972 bytes, -11) · 1ff578e6b713 → 6a9564c85203change seen, not confirmed by a published source
Pacific Power's Washington price summary dated 7 November lowers Schedule 97 (power cost adjustment) from 2.462c to 1.450c/kWh, Schedule 16 combined 14.343c to 13.331c (-$10.12 on 1,000 kWh). The filed Schedule 97 sheet still shows 2.462c; awaiting it before re-encoding.
2026-11-07pacificorp-or-4-2026-10-31content changed (123,482 -> 125,238 bytes, +1,756) · eda6d9973168 → 9929ce6078c1re-encoded
Pacific Power Oregon Schedule 92 rose from $2.64 to $4.26 a month for residential customers from 31 October (filed Sheet 92-1, Third Revision). Encoded with the rest of the 31 October Schedule 4 change.
2026-11-07ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01content changed (108,052 -> 108,334 bytes, +282) · 9ada1bdf55f0 → 23a73f278beeno rate change
LADWP residential rates page re-rendered: the only text change is a deleted TOU contact-phone sentence. No figure moved at any precision and no applicability list changed. Encodings for R-1A zones 1 and 2 are unchanged.
2026-11-07apco-wv-rs-2026-09-01content changed (168,488 -> 171,249 bytes, +2,761) · 466da6c91dcc → c2a97fef283eno rate change
APCo West Virginia relinked its tariff book for 1 November: the Consumer Rate Relief Charge rose 0.290c to 0.321c, but it is embedded in the unchanged ENEC rate, and the 1 November typical bill is still $183.07 at 1,000 kWh. No billed residential rate moved.
2026-11-07dominion-va-schedule-1-2026-11-01content changed (219,572 -> 219,315 bytes, -257) · 66909d264e97 → 3319327f49c7no rate change
Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates.
2026-11-06jcpl-rs-2026-10-01content changed (80,414 -> 83,506 bytes, +3,092) · 4e62964bb618 → 19f2fb479870no rate change
JCP&L's regulatory page changed only its 'Last Modified' date (2 Sep to 5 Nov 2026), a page-loading notice and a stylesheet. No figure moved and no linked document was added or removed; the encoding is unchanged.
2026-11-05nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01content changed (84,844 -> 88,067 bytes, +3,223) · ac507a4377f9 → 37985e3fa1fdno rate change
Eversource reformatted its Greater Boston rate page: charges reordered and relabelled, explicit $0.00000 rows added on commercial schedules, and the 0.008c planning factor now also listed for R-1HP summer, which the encoding already carries. No R-1, R-1HP or R-3 figure moved.
2026-11-04coned-sc1-2026-02-01content changed (65,457,729 -> 65,369,690 bytes, -88,039) · 3a1eb6b324d7 → 0caeb2705a77no rate change
Con Edison removed a stale duplicate page from its tariff book: Leaf 249.4.3 Revision 6 (Rider R, community solar crediting text, superseded in February) had been printed alongside the current Revision 8. No rate figure moved; SC1 is unchanged.
2026-11-04oncor-residential-2026-10-04content changed (3,886,275 -> 3,890,589 bytes, +4,314) · 5e9cd16c4f98 → 404c87f71e57no rate change
Oncor re-exported its retail delivery tariff PDF. The extracted text is identical character for character, so no rate, schedule or applicability changed. The encoding is unchanged.
2026-11-04entergy-texas-rs-2026-11-01content changed (53,229 -> 53,565 bytes, +336) · 3d66fb09bf08 → 38b66da54be5re-encoded
Entergy Texas's November sample bill adds Schedule GCRR at 1.0493c/kWh (+10.49 on 1,000 kWh) and drops the zero SCO and RCE-5 lines; total 157.65 to 168.14. Re-encoded as a November vintage; it rebuilds 168.14 exactly.
2026-11-04entergy-neworleans-res25-2026-11-01content changed (52,947 -> 53,348 bytes, +401) · 319dd8d800ae → 201f419170c9already encoded
Entergy New Orleans's November sample bill moved PPCR 3.0287% to 3.2156%, SSCRII 5.3577% to 5.5698% and fuel 1.6246c to 1.2797c; total 152.65 to 144.21. All already encoded on 2 Nov; the encoding rebuilds 144.21 exactly.
2026-11-04entergy-mississippi-rs40c-2026-10-01content changed (54,910 -> 54,916 bytes, +6) · 0744ae2279cf → 5bb3849cdd91no rate change
Entergy Mississippi's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision and the total is still 164.39. No rate moved; the encoding is unchanged.
2026-11-04entergy-louisiana-rs-2026-11-01content changed (58,000 -> 58,006 bytes, +6) · 7241de462a91 → 40a8bb19b01calready encoded
Entergy Louisiana's November sample bill shows fuel adjustment 2.748c to 2.688c and EAC 0.0047c to 0.0034c, total 146.19 to 145.57. Both were already encoded on 2 Nov; the November vintage now rebuilds 145.57 within a cent.
2026-11-04entergy-arkansas-rs-2026-08-01content changed (54,675 -> 54,677 bytes, +2) · 887245daa462 → dc9ef9df9cf6no rate change
Entergy Arkansas's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision, and the total is still 143.81. No rate moved; the encoding is unchanged.
2026-11-03oncor-residential-2026-10-04content changed (88,333 -> 86,747 bytes, -1,586) · dcc63098a028 → 628c8d85af2balready encoded
The PUCT comparison page moved to 1 November and now shows Oncor at 6.8673c/kWh, the 4 October rates already encoded. Its AEP Texas rows also moved; AEP Texas is not encoded. No encoded rate changes.
2026-11-03ppl-rs-2026-07-01, ppl-rs-2026-12-01content changed (6,882,495 -> 6,883,127 bytes, +632) · e5bfc29c7882 → 27493d722e4cre-encoded
PPL's Price to Compare rises 13.079c to 14.428c/kWh on 1 December (GSC-1 0.10133 + TSC 0.04295, Supplements 5 and 6 to Tariff No. 202), about +$13.49 on 1,000 kWh. Encoded for that date and reconciled to PPL's posted figure; current rates unaffected until then.
2026-11-03pacificorp-or-4-2026-10-31content changed (517,600 -> 560,401 bytes, +42,801) · 293897778e42 → dae38c4f5cd5re-encoded
Pacific Power Oregon Schedule 4 re-encoded from the 31 October price summary: combined 14.499c to 14.128c/kWh (Schedules 94, 190, 203, 206) and Schedule 92 $2.64 to $4.26 a month, about -$1.75 on 900 kWh. Schedules 94, 190 and 203 are not yet on their filed sheets; watched.
2026-11-03oge-ok-r1-2026-11-01content changed (649,815 -> 652,139 bytes, +2,324) · c37ec7aa2640 → 3e64f2c5f190no rate change
OG&E's tariffs page added 'REP 2027' pricing for its Renewable Energy Program (sheet 51.91), a programme not in the encoded rate. No encoded rider moved.
2026-11-03lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (148,562 -> 149,026 bytes, +464) · afdcc0d82b03 → efa6a44c8ef2re-encoded
LIPA posted Power Supply Charge Statement 119 for November: the base supply charge rose 13.9200c to 14.2906c/kWh, about +0.37c on every kWh (+$3.72 on 1,000 kWh at rate 180). Encoded on all four SC1 plans from 1 November; the statement's own printed per-rate-code figures are reproduced.
2026-11-03lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (123,934 -> 123,935 bytes, +1) · 4295f93534b7 → 6361f57a6fccno rate change
LIPA linked Value Stack Credit statement VSC-104 for November in place of VSC-103. Value Stack credits compensate exported distributed generation and are not part of the encoded SC1 bills; the tariff book link is unchanged. No encoded rate moved.
2026-11-03duke-carolinas-sc-rs-2026-11-01content changed (124,196 -> 109,860 bytes, -14,336) · b56508f6980a → 30b702e4a70dre-encoded
Duke Energy Carolinas' SC Schedule RS rose 0.5799c on both tiers from 1 November (13.8125/14.4661c to 14.3924/15.0460c), the annual fuel order. Re-encoded from that date; Duke publishes no SC sample bill to reconcile against.
2026-11-03duke-carolinas-sc-rs-2026-11-01content changed (126,395 -> 119,395 bytes, -7,000) · 6f91b0d3cc75 → 7648cbd56a33re-encoded
Duke Carolinas SC Leaf 50C: residential fuel 2.8854c to 3.4622c/kWh (already inside the Schedule RS base, which rose to match) and the DERP monthly charge $0.52 to $0.11, from 1 November. Re-encoded with Schedule RS.
2026-11-03duke-in-rs-2026-11-01content changed (80,480 -> 85,434 bytes, +4,954) · 35fdd555719f → da0782ef9143re-encoded
Duke Energy Indiana's Q4 tracker table added a November row for Tariff 65 (T&D infrastructure): residential 0.000929 to 0.000111 $/kWh, -$0.82 on 1,000 kWh. Re-encoded for bills from November; no sample bill at this vintage to reconcile against.
2026-11-03apco-va-rs-2026-11-01content changed (179,299 -> 181,012 bytes, +1,713) · 550f1eec6b7a → 8c067a2411aere-encoded
APCo Virginia's November 1 update cut Rider P.I.P.P. from 0.132c to 0.082c/kWh, taking Schedule R.S. from 16.189c to 16.139c (-$0.50 on 1,000 kWh). Re-encoded from 1 November and reconciled to APCo's published $169.35 typical bill.
2026-11-03oncor-residential-2026-10-04content changed (276,445 -> 88,575 bytes, -187,870) · 8e5a29b689b3 → 7c30455e00d4already encoded
The PUCT's Oncor report as of November 1 prints $0.068673/kWh and $72.73 at 1,000 kWh - the 4 October tracker rates already encoded. No new rate moved; that vintage now reconciles exactly to a published total.
2026-11-03centerpoint-houston-residential-2026-09-30content changed (269,441 -> 87,065 bytes, -182,376) · 1b60f48c2b43 → 61f220fa722eno rate change
CenterPoint's monthly Houston rates report was re-issued with only its header date moving (10/1/2026 to 11/1/2026). Every figure is identical at every precision, so no rate changed and the encoded Houston residential tariff is unaffected.
2026-11-03dominion-va-schedule-1-2026-11-01content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97no rate change
Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change.
2026-11-02nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed (130,650 -> 130,619 bytes, -31) · 596ce8d7882e → 22b3aab8a2c7re-encoded
NYSEG's Transition Charge statement 266 sets SC1 at -0.1797c/kWh from -0.6072c, about +$4.28 on 1,000 kWh. Encoded for 1 November; not reconciled to a published bill.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (90,274 -> 90,906 bytes, +632) · 7177c7a19c8f → 18287b341b75re-encoded
Entergy New Orleans' November fuel adjustment fell 1.6246c to 1.2797c/kWh, about -$3.45 on 1,000 kWh. Encoded for 1 November; no November sample bill yet to reconcile against.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (104,859 -> 104,806 bytes, -53) · a407a0aa10bf → 1a53e13dbf75re-encoded
Entergy New Orleans' purchased power capacity rider rose 3.0287% to 3.2156% for November. Encoded on the November vintage; not yet reconciled to a published bill.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (9,264 -> 8,410 bytes, -854) · f923e50944f2 → 470ca6e76d18re-encoded
Entergy New Orleans' storm securitization (SSCR II) rose 5.3577% to 5.5698% from 30 October. Encoded on the November vintage; not yet reconciled to a published bill.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (78,548 -> 78,579 bytes, +31) · 7dda970e76c8 → a0683864aa2eno rate change
Entergy New Orleans' environmental adjustment for November is 0.000000, unchanged. No rate moved; the encoding is unchanged.
2026-11-02entergy-louisiana-rs-2026-11-01content changed (91,631 -> 92,224 bytes, +593) · 4cfe73cd7827 → ad91d8fbf258re-encoded
Entergy Louisiana's November fuel adjustment fell 2.748c to 2.688c/kWh, about -$0.60 on 1,000 kWh. Encoded for 1 November; Entergy has not yet published a November sample bill to reconcile against.
2026-11-02entergy-louisiana-rs-2026-11-01content changed (77,464 -> 77,527 bytes, +63) · 73ff931bcc9a → 9054b02787b2no rate change
Entergy Louisiana appended November to its FSPP table at 0.000002 $/kWh, the same as October. No rate moved; the encoding is unchanged.
2026-11-02entergy-louisiana-rs-2026-11-01content changed (91,571 -> 91,899 bytes, +328) · 516895ec30e2 → a8ef014f81c9re-encoded
Entergy Louisiana's November environmental adjustment fell 0.0047c to 0.0034c/kWh (with fuel, below). Encoded for 1 November; no November sample bill yet, so not reconciled to a published total.
2026-11-02entergy-arkansas-rs-2026-08-01content changed (116,074 -> 117,028 bytes, +954) · 7280720e432b → 2d1b38d16c3cno rate change
Entergy Arkansas revised the Grand Gulf Rider's allocation text (EAL share now 24.19%) effective 27 October. The residential rate is unchanged at 0.762c/kWh; any cost effect arrives at the January redetermination.
2026-11-02dominion-va-schedule-1-2026-11-01content changed (111,754 -> 112,767 bytes, +1,013) · 5c3eff837f08 → acc564876fddre-encoded
Dominion's rider exhibit now dates Riders E, PIPP and TRG 11-01-26, the same November filing. The residential moves (+0.0229c/kWh) are encoded for 1 November.
2026-11-02dominion-va-schedule-1-2026-11-01content changed (15,078,887 -> 9,695,927 bytes, -5,382,960) · b6a2fa061218 → c0d42303fafdre-encoded
Dominion Virginia's November filing: Rider E 0.0625c to 0.0696c and Universal Service Fee (PIPP) 0 to 0.0158c/kWh, +0.0229c on every residential kWh from 1 November. Encoded for that date; no published bill to reconcile against.
2026-11-02aps-r1-large-2026-11-01, aps-r1-medium-2026-11-01, aps-r1-small-2026-11-01content changed (202,097 -> 192,677 bytes, -9,420) · 31baa7165d89 → 2483d264b6f4re-encoded
APS's REAC-1 becomes a credit from 1 November: -$0.030514/kWh capped at -$12.21 a month (previously a +$2.49 charge). Encoded on the scheduled shelf for 1 November.
2026-10-31lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (123,241 -> 123,934 bytes, +693) · d34cff152551 → 4295f93534b7no rate change
LIPA posted Statement 29 of its Long Island Choice parameters - capacity reserve requirements for retail suppliers, effective 1 November. It sets no customer charge; no rate on any residential plan moved.
2026-10-31cps-ra-2026-11-01, cps-re-2026-11-01content changed (149,562 -> 148,140 bytes, -1,422) · 35fbea7eb552 → 8c21e13ef12fre-encoded
CPS Energy posted its November 2026 fuel factors: the residential fuel/regulatory adjustment falls 4.599c -> 4.307c/kWh (-0.292c on every kWh). Encoded for RE and RA as the 2026-11-01 vintage; the quoted 13.0c class average is unchanged.
2026-10-30consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (3,721,007 -> 3,751,541 bytes, +30,534) · 05b228bb64b6 → 2eaba927a330no rate change
The MPSC added its October 2026 table: Consumers Energy's PSCR factor is unchanged at 14.56 mills/kWh (1.456c), as are DTE, I&M, UMERC, UPPCO and Alpena. No encoded rate moved.
2026-10-29nspmn-residential-2026, nspmn-residential-esh-2026content changed (995,638 -> 973,827 bytes, -21,811) · 9618b10d31b7 → 546176524357no rate change
Xcel Minnesota revised two franchise-fee sheets (93.3 and 93.12): Newport's city fee rises from November and Wayzata's term is extended. Franchise fees are city-specific and excluded from the encoding; no residential rate moved.
2026-10-29aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (180,712 -> 178,984 bytes, -1,728) · 02bdca42229a → 64dc158c4bcbre-encoded
AEP Ohio posted its November tariff book and workbooks. Two riders rise from Cycle 1 November: Storm Damage Recovery $0.19 -> $0.48 a month (non-residential $1.02 -> $2.55) and Economic Development 1.8019% -> 2.42007% of base. Encoded as 2026-11-01 vintages for RS and GS Secondary; Price to Compare unchanged.
2026-10-28ppl-rs-2026-07-01, ppl-rs-2026-12-01content changed (6,881,954 -> 6,882,495 bytes, +541) · 9816851dc331 → e5bfc29c7882no rate change
PPL's Rates and Shopping page was re-rendered: only promotional card text changed (Energy Explained became Bill Toolkit) plus site build IDs. No rate figure moved at any precision. No change to the encoding.
2026-10-28oge-ok-r1-2026-11-01content changed (648,671 -> 649,815 bytes, +1,144) · 0ccc37780049 → c37ec7aa2640re-encoded
OG&E posted its November 2026 - May 2027 fuel factors (18th Revised Sheet 50.85): residential winter fuel 3.8453c -> 3.8439c/kWh from 1 November. Encoded as the 2026-11-01 vintage; October's rates are unaffected until then.
2026-10-27oge-ok-r1-2026-11-01content changed (647,615 -> 648,671 bytes, +1,056) · 1e6f28512d89 → 0ccc37780049change seen, not confirmed by a published source
OG&E's tariffs page added sheet 52.33, 'GCR Factors effective Nov 2026' (Generation Capacity Rider, 1st Revised). That rider is not in the encoded rate. Awaiting a read of the filed sheet and its factors; encoding unchanged.
2026-10-25psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (84,700 -> 84,944 bytes, +244) · b4fc2befdd0e → ccc02ba7abd8no rate change
Xcel's rate books page briefly served an older copy without the 19 October summary link, then restored it. The PSCo plans are already verified against that summary; no rate moved.
2026-10-25sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01content changed (93,478 -> 1,506,451 bytes, +1,412,973) · 149baf6c1c42 → 022b96ee3518no rate change
SCE's Schedule TOU-D was captured truncated on 24 October - 93 KB of a 1.5 MB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate on any TOU-D plan moved.
2026-10-25sce-d-2026-10-01content changed (77,173 -> 684,211 bytes, +607,038) · 30f5096c78c4 → 19d67a0de6edno rate change
SCE's Schedule D was captured truncated on 24 October - 77 KB of a 684 KB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate moved.
2026-10-24psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (84,586 -> 84,700 bytes, +114) · 45c230e00a2e → b4fc2befdd0eno rate change
superseded - answered by the review of 2026-10-25 on a later version of this document
2026-10-24sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01content changed (1,506,451 -> 93,478 bytes, -1,412,973) · 022b96ee3518 → 149baf6c1c42no rate change
superseded - answered by the review of 2026-10-25 on a later version of this document
2026-10-24sce-d-2026-10-01content changed (684,211 -> 77,173 bytes, -607,038) · 19d67a0de6ed → 30f5096c78c4no rate change
superseded - answered by the review of 2026-10-25 on a later version of this document
2026-10-24oconomowoc-rg1-2026-07content changed (157,061 -> 157,988 bytes, +927) · a6ee9e53ea54 → 51e8c29be0bano rate change
Oconomowoc's Public Utilities page removed its fall hydrant-flushing news item. The page carries no rate figures, so it cannot evidence a rate change either way; the Power Cost Adjustment remains a disclosed gap.
2026-10-24dte-d1-11-2026-09-01, dte-d1-13-2026-09-01, dte-d1-2026-09-01content changed (2,815,154 -> 2,611,567 bytes, -203,587) · d9cadeb84131 → c85ceef4be13no rate change
DTE's Sheet C-62.00 now prints the billed PSCR factor for October to December at 1.877c/kWh, the planned figure already encoded. The rest is a re-export of the book; no rate on D1, D1.11 or D1.13 moved.
2026-10-24ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01content changed (138,884 -> 139,448 bytes, +564) · 536b41d81709 → 37a93f763654re-encoded
Ameren filed Rider EEA for November 2026 at 0.00987 c/kWh in Rate Zone I, from October's 0.00985 - about two hundredths of a cent a year at 12,000 kWh. Encoded as the 2026-11-01 vintage on the shelf; October's rates are unaffected until then.
2026-10-22nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed, same size (47,338,008 bytes): 2127d1310d33 -> 2520f1675c99no rate change
NYSEG's PSC 120 book was re-exported with character-for-character identical text. No rate, schedule or effective date moved.
2026-10-22dominion-nc-schedule-1-2025-02-01content changed (3,220,827 -> 3,337,726 bytes, +116,899) · 2061ac127f2c → eb2b0ab4ac26no rate change
Dominion North Carolina's 12 October edition adds four energy-efficiency and thermostat programme schedules (CPEPP, CSBBI, RDTST, RPTST). No rate in Schedule 1 or its riders moved.
2026-10-21psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (3,351,437 -> 3,352,279 bytes, +842) · 580e4013ff10 → 3bfafeaabffdre-encoded
Advice Letter 2038, effective 19 Oct 2026, raised Colorado's residential GRSA-E from 0.01452 to 0.01576/kWh and the GRSA to 15.33%. Residential and SG plans re-encoded from the filed rate book; not yet checked against Xcel's 10-19-26 summary.
2026-10-21psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (84,462 -> 84,586 bytes, +124) · f47f50b6e5f6 → 45c230e00a2ealready encoded
Xcel posted its Electric Rates Summary effective 19 October 2026. The residential and Schedule SG rates encoded on 21 October for Advice Letter 2038 (GRSA-E $0.01576, GRSA 15.33%) reproduce every printed total exactly; no rate changes.
2026-10-21consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (20,725,618 -> 20,725,619 bytes, +1) · e4fb28001b31 → a6032440444cno rate change
Consumers Energy filed its November 2026 Power Supply Cost Recovery factor on Sheet D-6.00 at 0.01456 per kWh, the same figure already encoded. No rate changed; the encoding's PSCR note now cites November.
2026-10-15coned-sc1-2026-02-01content changed, same size (65,457,729 bytes): 378e3c249092 -> 3a1eb6b324d7no rate change
Con Edison re-published its tariff PDF with the same content: one leaf (249.4.3, Rider R community solar rules) moved position within the file. No figure, rate or effective date changed, so the encoding is unchanged.
2026-10-14jcpl-rs-2026-10-01content changed (81,212 -> 80,414 bytes, -798) · 64870a4582ad → 4e62964bb618no rate change
FirstEnergy regulatory documents page re-rendered: site navigation and page-chrome markup changed. No figure moved at any precision and the 45 linked tariff PDFs are unchanged. No rate changed; the JCP&L encoding is untouched.
2026-10-13pacificorp-ut-1-2026-09-25content changed (137,307 -> 137,024 bytes, -283) · e9e8fbf55ad0 → de818e635c8bre-encoded
Schedule 92 (GRC deferral) rose from 1.17% to 1.78% for Schedule 1, billed from 25 Sep 2026 through 31 Dec 2026. The filed sheet and the Price Summary agree. We re-encoded the Utah residential plan with the new percentage.
2026-10-13nevada-power-ors-tou-2026-10-01, nevada-power-rs-2026-10-01content changed (496,797 -> 399,359 bytes, -97,438) · ec1e72d91585 → 3cdb45998e58re-encoded
Nevada Power's Statement of Rates took effect 1 Oct 2026. RS is now 11.441c/kWh (was 11.935c): base energy fell and DEAA is a 0.250c credit. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded RS and ORS-TOU.
2026-10-13sierra-pacific-d1-2026-10-01, sierra-pacific-dm1-2026-10-01, sierra-pacific-od1-tou-2026-10-01content changed (357,300 -> 342,360 bytes, -14,940) · 3f9e50eefb44 → aca796ecb43dre-encoded
Sierra Pacific's Statement of Rates took effect 1 Oct 2026. D-1 is now 11.275c/kWh (was 11.528c); the DEAA credit deepened to 0.500c. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded D-1, DM-1 and OD-1 TOU.
2026-10-10pacificorp-ut-1-2026-09-25content changed (133,778 -> 133,996 bytes, +218) · 9176ff6f29e6 → 94e0ffdc6df6re-encoded
The 25 Sep 2026 Price Summary showed Schedule 92 at 1.78%; the filed Schedule 92 sheet now confirms it, effective 25 Sep. Every other Utah figure is unchanged. We re-encoded the Utah residential plan at 1.78%.
2026-10-09niagara-mohawk-sc1-2026-04-01content changed (49,735,401 -> 49,735,529 bytes, +128) · 8e4149fe855d → b71a636430f6no rate change
Niagara Mohawk re-filed Leaf 263.5 (Major Renewable Energy host-community bill credit): revision 20 to 21, effective 9 Oct, with paragraph renumbering 48.x to 58.x only. No rate moved; Leaf 349 (SC1) is untouched. Encoding unchanged.
2026-10-08jcpl-rs-2026-10-01content changed (81,147 -> 82,542 bytes, +1,395) · 0e9904916dfc → 88a562f596a2re-encoded
JCP&L's 10/1/2026 tariff changed four residential items: NGC, SBC, Rider RP (renamed ENJ) and TEC, net about -0.009 c/kWh. Re-encoded from the filed sheets. No published total exists at the new rates yet, so it is disclosed as not reconciled.
2026-10-07coned-sc1-2026-02-01content changed, same size (65,457,729 bytes): d26937fdfbc2 -> 378e3c249092no rate change
Con Edison's tariff PDF was re-rendered: one 59-line leaf (Rider R, CDG credits, effective 02/01/2026) moved to a different position in the file. Same text and figures, nothing added or removed. No rate moved; the encoding is unchanged.
2026-10-06masselectric-r1-2026-10-01, masselectric-r1-heat-pump-2026-10-01content changed, same size (99,707 bytes): aa0b57027e6e -> edd693c2999ano rate change
Massachusetts Electric re-exported its Basic Service sheet; the text is identical character for character. The fixed supply price is still 17.185c/kWh for August 2026 to January 2027, so no rate moved and the encoding is unchanged.
2026-10-06dominion-nc-schedule-1-2025-02-01content changed (2,831,845 -> 3,220,827 bytes, +388,982) · 0a2ce93d3a0f → 2061ac127f2cno rate change
Dominion North Carolina's filing is back to the 2 October edition, byte-identical, with its revised cogeneration purchase rates (Schedules 19-FP and 19-LMP). Its server keeps alternating two editions; neither changes Schedule 1 or its riders.
2026-10-05oncor-residential-2026-10-04content changed (3,241,138 -> 3,886,275 bytes, +645,137) · c1263802662b → 5e9cd16c4f98re-encoded
Oncor put temporary rates into effect on 4 Oct (Docket 59249): TCRF 1.9046c to 2.1669c and DCRF 0 to 0.5755c, +0.8378 c/kWh, about +$8.38 on 1,000 kWh. Re-encoded from 4 Oct; no published total covers it yet, so it is disclosed as unreconciled.
2026-10-04dominion-nc-schedule-1-2025-02-01content changed (3,220,827 -> 2,831,845 bytes, -388,982) · 2061ac127f2c → 0a2ce93d3a0fno rate change
Dominion North Carolina's filing is back to the 21 August edition, byte-identical, as on 2 October. Its server keeps alternating between that and the 2 October cogeneration purchase-rate edition; neither changes Schedule 1 or its riders.
2026-10-03niagara-mohawk-sc1-2026-04-01content changed, same size (49,735,401 bytes): 6898e380d844 -> 8e4149fe855dno rate change
Niagara Mohawk's PSC 220 tariff was re-exported: same size, and the extracted text is identical character for character. No rate or wording changed.
2026-10-03oge-ok-r1-2026-11-01content changed (646,532 -> 647,615 bytes, +1,083) · 3b35ba2a46b1 → 1e6f28512d89re-encoded
OG&E posted Winter Event Securitization factors effective 1 October (residential 0.243c -> 0.219c/kWh). That charge, the SPP Cost Tracker (0.432c) and the Grid Enhancement credit (-0.029c) had been missing; all three are now encoded, about +$6.22 on 1,000 kWh.
2026-10-03lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (123,243 -> 123,241 bytes, -2) · 74791ebdb91d → d34cff152551no rate change
LIPA published its October tariff book. The only change is the Extreme Heat Protections section, cancelled; every rate figure is identical to September's. The watch now reads the October book.
2026-10-03aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (774,996 -> 796,301 bytes, +21,305) · 38d079c1606f → 9a634ca5dea9re-encoded
PUCO published Ohio Power's Oct-Dec Price to Compare, $0.1019/kWh ($0.1097 before), which the October encoding reproduces. Checking it corrected the Alternative Energy Rider to its filed 0.38973c (was 0.3897c), +$0.0003 on 1,000 kWh.

Source checks, last 90 days

Whether the monitor ran each day. A gap is a day when staleness could not be ruled out. This is not an uptime chart - uptime is the wrong question for a data product. A day counts as checked whether or not anything changed, because a quiet day and a broken monitor must not look alike.

85 of 87 days checked since the first run on 2026-08-19 — 2 day(s) missed: 2026-10-23, 2026-11-13. A missed day is one where staleness could not be ruled out. Hover a cell for the date and how many of the 342 watched sources were checked that day.  ·  The 3 pale cells are days before the monitor existed. They are not misses.

How fast do filings get encoded? (all time)

Time from detecting that a utility filed a change to the served rates being updated. This bounds how out-of-date any figure here can be, and it is computed from the record rather than promised.

Measured over every filing since launch, not the window above. Rate changes arrive roughly quarterly, so a 90-day window would usually contain too few to mean anything - and a median over one sample would look like precision it does not have.

Median time to update
0 days
Slowest
8 days
Filings measured
96
Encoded for a future date
1
Encoded before the document moved
19
Reviewed, changed no rate
127
Change seen, nothing published to confirm it
2
No longer watched
2

Time from detecting a filing to the encoded rates being updated. Pending means detected and not yet encoded; filings reviewed as changing no rate, those encoded ahead of a future effective date, those already encoded before the source document changed at all, and those read but not yet confirmed by the filed source, are counted separately rather than averaged in.

Why this page exists

Every rate API claims to be current, and from the outside that claim cannot be checked. This one can: the source documents are polled daily, every version is kept, and when a utility files something we have not encoded yet this page says so by name. A status page that can only report good news is marketing.

Browse rates · GET /health returns this page's summary as JSON, without a key. GET /changes returns the change log as JSON, and needs one.