RateGrid

Status

Current, with a filing pending
Every rate being served is the one in force today. A utility has filed a change for a future date, it is already encoded, and it starts being served on the day it takes effect.
391 Sources watched
yesterdayLast checked
yesterday Last source change
1 days ago Last scheduled run
0 Plans awaiting re-encoding
10m54s Last run took

Filings encoded and pending

A change is filed but not yet in force. The rate served today is the one being billed today; the encoding below starts serving itself on its effective date, with no deploy.

Plan in forceSourceTakes effectBecomes
ameren-il-ds1-2026-11-01ameren.com/aiel11rtds1.ashx2026-12-01ameren-il-ds1-2026-12-01
duquesne-gm-lt25-2026-10-01duquesnelight.com2026-12-01duquesne-gm-lt25-2026-12-01
duquesne-gs-2026-10-01duquesnelight.com2026-12-01duquesne-gs-2026-12-01
duquesne-rs-2026-10-01duquesnelight.com2026-12-01duquesne-rs-2026-12-01
ppl-gs-1-2026-10-01pplelectric.com/402master4_posted-10-2-26.pdf2026-12-01ppl-gs-1-2026-12-01
ppl-gs-3-2026-10-01pplelectric.com/402master4_posted-10-2-26.pdf2026-12-01ppl-gs-3-2026-12-01
ppl-rs-2026-10-01pplelectric.com/Rate-Schedule-RS-Residential-Service.pdf2026-12-01ppl-rs-2026-12-01
ameren-il-ds1-2026-12-01ameren.com/aiel11rtds1.ashx2027-01-01ameren-il-ds1-2027-01-01

No plan is waiting on a filing we have already seen.

Coverage

56% of US residential customers
100% of the 50 largest utilities
79.9M customers covered
45 utilities encoded

Two denominators, because one of them alone would mislead. 79,866,676 of 143,144,185 US residential customers is 55.8%. The same catalogue is 100.0% of the 79,866,676 customers served by the 50 largest utilities by residential customers (49 groups, 53 operating companies), which is where the work has deliberately gone — the country has 1,267 utilities selling residential electricity, and most of them are small municipals and co-ops.

Counted from EIA Form 861, 2024 data year, Sales_Ult_Cust (residential customer count), regenerated 2026-11-14. Customer counts are a census of households served, not of the plans encoded: a utility counts once it has a residential tariff here, whatever else it also files.

2 further utilities are encoded and serving but cannot appear in any of these figures: Oncor (TX, wires only), CenterPoint Energy Houston. Texas is deregulated, so EIA attributes those households to the retailers that sell them energy rather than to the wires company every one of them pays.

Detected changes

Every time a watched rate sheet stops matching the version the served rates were taken from. The monitor compares bytes, so it cannot tell a re-filed rate from a re-rendered PDF - both are real changes to the document and only one needs the rates re-derived. The outcome column says which, and a row that changed no rate is kept rather than hidden.

Showing the 250 most recent of 268. Show 250, or fetch the whole log as JSON from /changes (needs a key).

DetectedAffectsChange Outcome
2026-11-20sierra-pacific-d1-2026-10-01, sierra-pacific-dm1-2026-10-01, sierra-pacific-od1-tou-2026-10-01content changed (342,360 -> 343,915 bytes, +1,555) · aca796ecb43d → 3a85c8c288e5re-encoded
111th Revised Statement of Rates adopts the October bill insert's riders: TRED 0.00055 -> 0.00064, ESAP 0.00005 -> 0.00004, EE up (D-1 0.00223, DM-1 0.00236), REPR credit removed. D-1 0.11275 -> 0.11386 $/kWh. Effective 1 Oct 2026; D-1, DM-1 and OD-1 TOU re-encoded.
2026-11-20dominion-va-schedule-1-2026-11-01content changed (9,695,927 -> 9,782,948 bytes, +87,021) · c0d42303fafd → 3542a19a64eeno rate change
Dominion added a 2026 Pro-Rata Share of Fuel Deferral Charges sheet, billed from 1 Dec 2026. It applies only to customers exempt from the Deferred Fuel Cost Charge. Schedule 1 residential pays the DFCC (0.002901, unchanged), so no rate moved and the encoding stays as it is.
2026-11-19nevada-power-ors-tou-2026-10-01, nevada-power-rs-2026-10-01content changed (399,359 -> 507,266 bytes, +107,907) · 3cdb45998e58 → 7be276f29c63no rate change
Nevada Power re-published its Statement of Rates with two commercial generation-credit sheets (10J(2), 10J(3)) restored, unchanged since Oct 2025. Residential RS and ORS-TOU rates are unchanged; encodings stay as they are.
2026-11-18ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01, ameren-il-ds1-2026-12-01content changed (103,160 -> 92,089 bytes, -11,071) · 0aa9066552fd → 33d053a3b110re-encoded
Ameren Illinois' UCB/POR Program Charge is $0.00 for January-March 2027 billing periods, from ($0.99) - the residential fixed charge rises $0.99 a month. Encoded for January 2027; current rates unaffected until then.
2026-11-18ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01, ameren-il-ds1-2026-12-01content changed (158,145 -> 145,096 bytes, -13,049) · ca18a49f4aa0 → 008ca1058256already encoded
Ameren Illinois filed Rider CSESC for 2027: $0.00008/kWh for January-March, unchanged from the current quarter, then $0.00009 from April. The January vintage already carries $0.00008; April's figure goes into an April 2027 vintage.
2026-11-17nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed, same size (47,338,008 bytes): 2520f1675c99 -> e5ee7fb9d139no rate change
NYSEG's PSC 120 tariff book was re-assembled: two revisions of Leaf 117.46.26.9 (the VDER Customer Benefit Contribution leaf) swapped places in the file. No figure moved and no line was added or removed. No rate moved; the SC-1 encoding is unchanged.
2026-11-17niagara-mohawk-sc1-2026-04-01content changed, same size (49,735,529 bytes): b71a636430f6 -> 208c28b57d87no rate change
National Grid re-exported this tariff PDF. The extracted text is identical to the 9 Oct 2026 capture, character for character, so no rate, schedule name or effective date changed. No rate moved; the SC-1 encoding is unchanged and remains current.
2026-11-17pacificorp-ut-1-2026-09-25content changed (133,996 -> 151,902 bytes, +17,906) · 94e0ffdc6df6 → e64c4ba17081no rate change
Rocky Mountain Power's Utah price summary now marks Schedules 31 and 32 (back-up and delivery service for large customers) as priced under the applicable general service schedule. Every Schedule 1 residential figure is unchanged; the encoding stays as is.
2026-11-17lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (123,935 -> 123,795 bytes, -140) · 6361f57a6fcc → cc64c5c594bfno rate change
LIPA posted Securitization Statement 31-SC, from 15 November: six charges totalling $0.019654/kWh and an offset of exactly ($0.019654), so they still cancel (30-SC was $0.019931 both ways). No rate on the bill moved; the encoding is unchanged and 31-SC is now watched.
2026-11-17ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01, ameren-il-ds1-2026-12-01content changed (139,448 -> 139,977 bytes, +529) · 37a93f763654 → 0a48b75bd215re-encoded
Ameren Illinois Rider EEA for December is 0.00976 cents/kWh on DS-1 (Rate Zone I), from 0.00987 - about a tenth of a cent a month at 1,000 kWh. Encoded for 1 December; current rates unaffected until then.
2026-11-16aes-ohio-rs-2026-11-01content changed, same size (634,123 bytes): 655fc0114a4b -> bfcf10bb17a4no rate change
PUCO's Apples to Apples page changed one supplier offer's term from 8 to 7 months; no figure moved and AES Ohio's 10.86c/kWh Price to Compare is unchanged. No rate moved; the encoding stays as is.
2026-11-16cei-rs-2026-10-01content changed, same size (689,057 bytes): c641984e6b1d -> e9356f978d68no rate change
PUCO's Apples to Apples page shows one supplier (American Power & Gas) repricing four competitive offers; The Illuminating Company's 11.24c/kWh Price to Compare is unchanged. No utility rate moved; the encoding stays as is.
2026-11-16duke-ohio-rs-2026-11-02content changed, same size (795,753 bytes): b44b22c15b1d -> 67124d0dee15no rate change
PUCO's Apples to Apples page shows one supplier (American Power & Gas) repricing four competitive offers; Duke Energy Ohio's 10.49c/kWh Price to Compare is unchanged. No utility rate moved; the encoding stays as is.
2026-11-16toledo-edison-rs-2026-10-01content changed (689,571 -> 689,578 bytes, +7) · 772fcfedd6df → b6235e6f1947no rate change
PUCO's Apples to Apples page shows one supplier (American Power & Gas) repricing four competitive offers; Toledo Edison's 11.26c/kWh Price to Compare is unchanged. No utility rate moved; the encoding stays as is.
2026-11-15aes-ohio-rs-2026-11-01content changed, same size (634,123 bytes): 6d61cafc9f8c -> 655fc0114a4bno rate change
PUCO's Apples to Apples page reshuffled its supplier offers, as it does on every request; every offer row and AES Ohio's 10.86c/kWh Price to Compare are unchanged. No rate moved; the encoding stays as is.
2026-11-15cei-rs-2026-10-01content changed, same size (689,057 bytes): 43685aad5231 -> c641984e6b1dno rate change
PUCO's Apples to Apples page reshuffled its supplier offers, as it does on every request; every offer row and The Illuminating Company's 11.24c/kWh Price to Compare are unchanged. No rate moved; the encoding stays as is.
2026-11-15duke-ohio-rs-2026-11-02content changed, same size (795,753 bytes): 951a147f5835 -> b44b22c15b1dno rate change
PUCO's Apples to Apples page reshuffled its supplier offers, as it does on every request; every offer row and Duke Energy Ohio's 10.49c/kWh Price to Compare are unchanged. No rate moved; the encoding stays as is.
2026-11-15toledo-edison-rs-2026-10-01content changed, same size (689,571 bytes): a7a9a9d53357 -> 772fcfedd6dfno rate change
PUCO's Apples to Apples page reshuffled its supplier offers, as it does on every request; every offer row and Toledo Edison's 11.26c/kWh Price to Compare are unchanged. No rate moved; the encoding stays as is.
2026-11-14pacificorp-wa-16-2026-11-07content changed (95,404 -> 101,007 bytes, +5,603) · 02b5b756b544 → 4a552e81b168re-encoded
Pacific Power's Eighth Revision of Sheet 97.1 (Docket UE-230482) cut the Schedule 97 power cost adjustment for Washington residential from 2.462c to 1.450c/kWh, effective 7 Nov 2026. Re-encoded as pacificorp-wa-16-2026-11-07, reconciled to the published 13.331c Combined rate; about -$10.12 on 1,000 kWh.
2026-11-14consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (20,725,619 -> 20,725,590 bytes, -29) · a6032440444c → 94c92a43875dno rate change
Consumers re-filed its distributed generation outflow credit ($0.061 -> $0.077/kWh, sheet C-64.85) and PURPA avoided-cost table (C-76.00), effective 16 Oct 2026 under Case U-21090. Neither applies to the RSH/RSP residential rates encoded here, which are unchanged.
2026-11-14centerpoint-houston-residential-2026-11-13content changed (6,672,808 -> 6,792,396 bytes, +119,588) · b6519f0c45b8 → 110cc9de7c3cre-encoded
CenterPoint's Rider TC5 Refund credit ended on 13 November ($0.000278/kWh to zero; the refund is paid out), raising residential delivery 6.5333c to 6.5611c/kWh, about +$0.28 on 1,000 kWh. Re-encoded from that date; the DCRF is now final at an unchanged 0.6137c.
2026-11-12psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (3,352,279 -> 3,354,566 bytes, +2,287) · 3bfafeaabffd → 7899fc8bb4b8no rate change
PSCo's rate book replaced Sheet 70 (Schedule TG, transmission-voltage service) under Advice 2037, effective 13 November: one new customer-specific charge, Metro Denver Sewage $8,140. No other charge changed, and no encoded PSCo plan (R, R-OO, RE-TOU, SG) takes Schedule TG.
2026-11-10nspmn-residential-2026, nspmn-residential-esh-2026content changed (1,521,110 -> 1,598,047 bytes, +76,937) · 5b5c104d9760 → e08ae6c67804no rate change
Xcel (NSP-Minnesota) re-filed Section 5 residential sheets effective 1 Oct 2026 with revision markers and rider notes moved. Every rate figure is unchanged, already encoded from 2 Oct; no rate moved and no re-encoding is needed.
2026-11-10oconomowoc-rg1-2026-07content changed (157,988 -> 157,654 bytes, -334) · 51e8c29be0ba → c4310e32bc62no rate change
City of Oconomowoc's Public Utilities web page was re-rendered; the only text change is a removed 'Photo Gallery' navigation link. No rate or figure changed, so the Oconomowoc RG-1 encoding is unchanged.
2026-11-08dominion-va-schedule-1-2026-11-01content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97no rate change
Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change.
2026-11-07pacificorp-wa-16-2026-11-07content changed (155,983 -> 155,972 bytes, -11) · 1ff578e6b713 → 6a9564c85203re-encoded
Pacific Power's Washington Price Summary effective 7 Nov 2026 prints Schedule 97 at 1.450c (was 2.462c) and a Combined Effective Rate of 13.331c (was 14.343c). Its row re-derives exactly. Re-encoded as pacificorp-wa-16-2026-11-07; about -$10.12 a month on 1,000 kWh.
2026-11-07pacificorp-or-4-2026-10-31content changed (123,482 -> 125,238 bytes, +1,756) · eda6d9973168 → 9929ce6078c1re-encoded
Pacific Power Oregon Schedule 92 rose from $2.64 to $4.26 a month for residential customers from 31 October (filed Sheet 92-1, Third Revision). Encoded with the rest of the 31 October Schedule 4 change.
2026-11-07ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01content changed (108,052 -> 108,334 bytes, +282) · 9ada1bdf55f0 → 23a73f278beeno rate change
LADWP residential rates page re-rendered: the only text change is a deleted TOU contact-phone sentence. No figure moved at any precision and no applicability list changed. Encodings for R-1A zones 1 and 2 are unchanged.
2026-11-07apco-wv-rs-2026-09-01content changed (168,488 -> 171,249 bytes, +2,761) · 466da6c91dcc → c2a97fef283eno rate change
APCo West Virginia relinked its tariff book for 1 November: the Consumer Rate Relief Charge rose 0.290c to 0.321c, but it is embedded in the unchanged ENEC rate, and the 1 November typical bill is still $183.07 at 1,000 kWh. No billed residential rate moved.
2026-11-07dominion-va-schedule-1-2026-11-01content changed (219,572 -> 219,315 bytes, -257) · 66909d264e97 → 3319327f49c7no rate change
Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates.
2026-11-06jcpl-rs-2026-10-01content changed (80,414 -> 83,506 bytes, +3,092) · 4e62964bb618 → 19f2fb479870no rate change
JCP&L's regulatory page changed only its 'Last Modified' date (2 Sep to 5 Nov 2026), a page-loading notice and a stylesheet. No figure moved and no linked document was added or removed; the encoding is unchanged.
2026-11-05nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01content changed (84,844 -> 88,067 bytes, +3,223) · ac507a4377f9 → 37985e3fa1fdno rate change
Eversource reformatted its Greater Boston rate page: charges reordered and relabelled, explicit $0.00000 rows added on commercial schedules, and the 0.008c planning factor now also listed for R-1HP summer, which the encoding already carries. No R-1, R-1HP or R-3 figure moved.
2026-11-04coned-sc1-2026-02-01content changed (65,457,729 -> 65,369,690 bytes, -88,039) · 3a1eb6b324d7 → 0caeb2705a77no rate change
Con Edison removed a stale duplicate page from its tariff book: Leaf 249.4.3 Revision 6 (Rider R, community solar crediting text, superseded in February) had been printed alongside the current Revision 8. No rate figure moved; SC1 is unchanged.
2026-11-04oncor-residential-2026-10-04content changed (3,886,275 -> 3,890,589 bytes, +4,314) · 5e9cd16c4f98 → 404c87f71e57no rate change
Oncor re-exported its retail delivery tariff PDF. The extracted text is identical character for character, so no rate, schedule or applicability changed. The encoding is unchanged.
2026-11-04entergy-texas-rs-2026-11-01content changed (53,229 -> 53,565 bytes, +336) · 3d66fb09bf08 → 38b66da54be5re-encoded
Entergy Texas's November sample bill adds Schedule GCRR at 1.0493c/kWh (+10.49 on 1,000 kWh) and drops the zero SCO and RCE-5 lines; total 157.65 to 168.14. Re-encoded as a November vintage; it rebuilds 168.14 exactly.
2026-11-04entergy-neworleans-res25-2026-11-01content changed (52,947 -> 53,348 bytes, +401) · 319dd8d800ae → 201f419170c9already encoded
Entergy New Orleans's November sample bill moved PPCR 3.0287% to 3.2156%, SSCRII 5.3577% to 5.5698% and fuel 1.6246c to 1.2797c; total 152.65 to 144.21. All already encoded on 2 Nov; the encoding rebuilds 144.21 exactly.
2026-11-04entergy-mississippi-rs40c-2026-10-01content changed (54,910 -> 54,916 bytes, +6) · 0744ae2279cf → 5bb3849cdd91no rate change
Entergy Mississippi's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision and the total is still 164.39. No rate moved; the encoding is unchanged.
2026-11-04entergy-louisiana-rs-2026-11-01content changed (58,000 -> 58,006 bytes, +6) · 7241de462a91 → 40a8bb19b01calready encoded
Entergy Louisiana's November sample bill shows fuel adjustment 2.748c to 2.688c and EAC 0.0047c to 0.0034c, total 146.19 to 145.57. Both were already encoded on 2 Nov; the November vintage now rebuilds 145.57 within a cent.
2026-11-04entergy-arkansas-rs-2026-08-01content changed (54,675 -> 54,677 bytes, +2) · 887245daa462 → dc9ef9df9cf6no rate change
Entergy Arkansas's sample bill was re-issued for November. Only the MONTH OF label changed (October to November); no figure moved at any precision, and the total is still 143.81. No rate moved; the encoding is unchanged.
2026-11-03oncor-residential-2026-10-04content changed (88,333 -> 86,747 bytes, -1,586) · dcc63098a028 → 628c8d85af2balready encoded
The PUCT comparison page moved to 1 November and now shows Oncor at 6.8673c/kWh, the 4 October rates already encoded. Its AEP Texas rows also moved; AEP Texas is not encoded. No encoded rate changes.
2026-11-03ppl-rs-2026-10-01, ppl-rs-2026-12-01content changed (6,882,495 -> 6,883,127 bytes, +632) · e5bfc29c7882 → 27493d722e4cre-encoded
PPL's Price to Compare rises 13.079c to 14.428c/kWh on 1 December (GSC-1 0.10133 + TSC 0.04295, Supplements 5 and 6 to Tariff No. 202), about +$13.49 on 1,000 kWh. Encoded for that date and reconciled to PPL's posted figure; current rates unaffected until then.
2026-11-03pacificorp-or-4-2026-10-31content changed (517,600 -> 560,401 bytes, +42,801) · 293897778e42 → dae38c4f5cd5re-encoded
Pacific Power Oregon Schedule 4 re-encoded from the 31 October price summary: combined 14.499c to 14.128c/kWh (Schedules 94, 190, 203, 206) and Schedule 92 $2.64 to $4.26 a month, about -$1.75 on 900 kWh. Schedules 94, 190 and 203 are not yet on their filed sheets; watched.
2026-11-03oge-ok-r1-2026-11-01content changed (649,815 -> 652,139 bytes, +2,324) · c37ec7aa2640 → 3e64f2c5f190no rate change
OG&E's tariffs page added 'REP 2027' pricing for its Renewable Energy Program (sheet 51.91), a programme not in the encoded rate. No encoded rider moved.
2026-11-03lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (148,562 -> 149,026 bytes, +464) · afdcc0d82b03 → efa6a44c8ef2re-encoded
LIPA posted Power Supply Charge Statement 119 for November: the base supply charge rose 13.9200c to 14.2906c/kWh, about +0.37c on every kWh (+$3.72 on 1,000 kWh at rate 180). Encoded on all four SC1 plans from 1 November; the statement's own printed per-rate-code figures are reproduced.
2026-11-03lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (123,934 -> 123,935 bytes, +1) · 4295f93534b7 → 6361f57a6fccno rate change
LIPA linked Value Stack Credit statement VSC-104 for November in place of VSC-103. Value Stack credits compensate exported distributed generation and are not part of the encoded SC1 bills; the tariff book link is unchanged. No encoded rate moved.
2026-11-03duke-carolinas-sc-rs-2026-11-01content changed (124,196 -> 109,860 bytes, -14,336) · b56508f6980a → 30b702e4a70dre-encoded
Duke Energy Carolinas' SC Schedule RS rose 0.5799c on both tiers from 1 November (13.8125/14.4661c to 14.3924/15.0460c), the annual fuel order. Re-encoded from that date; Duke publishes no SC sample bill to reconcile against.
2026-11-03duke-carolinas-sc-rs-2026-11-01content changed (126,395 -> 119,395 bytes, -7,000) · 6f91b0d3cc75 → 7648cbd56a33re-encoded
Duke Carolinas SC Leaf 50C: residential fuel 2.8854c to 3.4622c/kWh (already inside the Schedule RS base, which rose to match) and the DERP monthly charge $0.52 to $0.11, from 1 November. Re-encoded with Schedule RS.
2026-11-03duke-in-rs-2026-11-01content changed (80,480 -> 85,434 bytes, +4,954) · 35fdd555719f → da0782ef9143re-encoded
Duke Energy Indiana's Q4 tracker table added a November row for Tariff 65 (T&D infrastructure): residential 0.000929 to 0.000111 $/kWh, -$0.82 on 1,000 kWh. Re-encoded for bills from November; no sample bill at this vintage to reconcile against.
2026-11-03apco-va-rs-2026-11-01content changed (179,299 -> 181,012 bytes, +1,713) · 550f1eec6b7a → 8c067a2411aere-encoded
APCo Virginia's November 1 update cut Rider P.I.P.P. from 0.132c to 0.082c/kWh, taking Schedule R.S. from 16.189c to 16.139c (-$0.50 on 1,000 kWh). Re-encoded from 1 November and reconciled to APCo's published $169.35 typical bill.
2026-11-03oncor-residential-2026-10-04content changed (276,445 -> 88,575 bytes, -187,870) · 8e5a29b689b3 → 7c30455e00d4already encoded
The PUCT's Oncor report as of November 1 prints $0.068673/kWh and $72.73 at 1,000 kWh - the 4 October tracker rates already encoded. No new rate moved; that vintage now reconciles exactly to a published total.
2026-11-03centerpoint-houston-residential-2026-11-13content changed (269,441 -> 87,065 bytes, -182,376) · 1b60f48c2b43 → 61f220fa722eno rate change
CenterPoint's monthly Houston rates report was re-issued with only its header date moving (10/1/2026 to 11/1/2026). Every figure is identical at every precision, so no rate changed and the encoded Houston residential tariff is unaffected.
2026-11-03dominion-va-schedule-1-2026-11-01content changed (219,315 -> 219,572 bytes, +257) · 3319327f49c7 → 66909d264e97no rate change
Dominion's bill calculator flipped back to the 3 Nov version, byte-identical (sha256 66909d264e97) to that archived capture, which carries Rider E 0.0696c and PIPP 0.0158c. These match the filed tariff and the encoding; no rate moved, no change.
2026-11-02nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed (130,650 -> 130,619 bytes, -31) · 596ce8d7882e → 22b3aab8a2c7re-encoded
NYSEG's Transition Charge statement 266 sets SC1 at -0.1797c/kWh from -0.6072c, about +$4.28 on 1,000 kWh. Encoded for 1 November; not reconciled to a published bill.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (90,274 -> 90,906 bytes, +632) · 7177c7a19c8f → 18287b341b75re-encoded
Entergy New Orleans' November fuel adjustment fell 1.6246c to 1.2797c/kWh, about -$3.45 on 1,000 kWh. Encoded for 1 November; no November sample bill yet to reconcile against.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (104,859 -> 104,806 bytes, -53) · a407a0aa10bf → 1a53e13dbf75re-encoded
Entergy New Orleans' purchased power capacity rider rose 3.0287% to 3.2156% for November. Encoded on the November vintage; not yet reconciled to a published bill.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (9,264 -> 8,410 bytes, -854) · f923e50944f2 → 470ca6e76d18re-encoded
Entergy New Orleans' storm securitization (SSCR II) rose 5.3577% to 5.5698% from 30 October. Encoded on the November vintage; not yet reconciled to a published bill.
2026-11-02entergy-neworleans-res25-2026-11-01content changed (78,548 -> 78,579 bytes, +31) · 7dda970e76c8 → a0683864aa2eno rate change
Entergy New Orleans' environmental adjustment for November is 0.000000, unchanged. No rate moved; the encoding is unchanged.
2026-11-02entergy-louisiana-rs-2026-11-01content changed (91,631 -> 92,224 bytes, +593) · 4cfe73cd7827 → ad91d8fbf258re-encoded
Entergy Louisiana's November fuel adjustment fell 2.748c to 2.688c/kWh, about -$0.60 on 1,000 kWh. Encoded for 1 November; Entergy has not yet published a November sample bill to reconcile against.
2026-11-02entergy-louisiana-rs-2026-11-01content changed (77,464 -> 77,527 bytes, +63) · 73ff931bcc9a → 9054b02787b2no rate change
Entergy Louisiana appended November to its FSPP table at 0.000002 $/kWh, the same as October. No rate moved; the encoding is unchanged.
2026-11-02entergy-louisiana-rs-2026-11-01content changed (91,571 -> 91,899 bytes, +328) · 516895ec30e2 → a8ef014f81c9re-encoded
Entergy Louisiana's November environmental adjustment fell 0.0047c to 0.0034c/kWh (with fuel, below). Encoded for 1 November; no November sample bill yet, so not reconciled to a published total.
2026-11-02entergy-arkansas-rs-2026-08-01content changed (116,074 -> 117,028 bytes, +954) · 7280720e432b → 2d1b38d16c3cno rate change
Entergy Arkansas revised the Grand Gulf Rider's allocation text (EAL share now 24.19%) effective 27 October. The residential rate is unchanged at 0.762c/kWh; any cost effect arrives at the January redetermination.
2026-11-02dominion-va-schedule-1-2026-11-01content changed (111,754 -> 112,767 bytes, +1,013) · 5c3eff837f08 → acc564876fddre-encoded
Dominion's rider exhibit now dates Riders E, PIPP and TRG 11-01-26, the same November filing. The residential moves (+0.0229c/kWh) are encoded for 1 November.
2026-11-02dominion-va-schedule-1-2026-11-01content changed (15,078,887 -> 9,695,927 bytes, -5,382,960) · b6a2fa061218 → c0d42303fafdre-encoded
Dominion Virginia's November filing: Rider E 0.0625c to 0.0696c and Universal Service Fee (PIPP) 0 to 0.0158c/kWh, +0.0229c on every residential kWh from 1 November. Encoded for that date; no published bill to reconcile against.
2026-11-02aps-r1-large-2026-11-01, aps-r1-medium-2026-11-01, aps-r1-small-2026-11-01content changed (202,097 -> 192,677 bytes, -9,420) · 31baa7165d89 → 2483d264b6f4re-encoded
APS's REAC-1 becomes a credit from 1 November: -$0.030514/kWh capped at -$12.21 a month (previously a +$2.49 charge). Encoded on the scheduled shelf for 1 November.
2026-10-31lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (123,241 -> 123,934 bytes, +693) · d34cff152551 → 4295f93534b7no rate change
LIPA posted Statement 29 of its Long Island Choice parameters - capacity reserve requirements for retail suppliers, effective 1 November. It sets no customer charge; no rate on any residential plan moved.
2026-10-31cps-ra-2026-11-01, cps-re-2026-11-01content changed (149,562 -> 148,140 bytes, -1,422) · 35fbea7eb552 → 8c21e13ef12fre-encoded
CPS Energy posted its November 2026 fuel factors: the residential fuel/regulatory adjustment falls 4.599c -> 4.307c/kWh (-0.292c on every kWh). Encoded for RE and RA as the 2026-11-01 vintage; the quoted 13.0c class average is unchanged.
2026-10-30consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (3,721,007 -> 3,751,541 bytes, +30,534) · 05b228bb64b6 → 2eaba927a330no rate change
The MPSC added its October 2026 table: Consumers Energy's PSCR factor is unchanged at 14.56 mills/kWh (1.456c), as are DTE, I&M, UMERC, UPPCO and Alpena. No encoded rate moved.
2026-10-29nspmn-residential-2026, nspmn-residential-esh-2026content changed (995,638 -> 973,827 bytes, -21,811) · 9618b10d31b7 → 546176524357no rate change
Xcel Minnesota revised two franchise-fee sheets (93.3 and 93.12): Newport's city fee rises from November and Wayzata's term is extended. Franchise fees are city-specific and excluded from the encoding; no residential rate moved.
2026-10-29aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (180,712 -> 178,984 bytes, -1,728) · 02bdca42229a → 64dc158c4bcbre-encoded
AEP Ohio posted its November tariff book and workbooks. Two riders rise from Cycle 1 November: Storm Damage Recovery $0.19 -> $0.48 a month (non-residential $1.02 -> $2.55) and Economic Development 1.8019% -> 2.42007% of base. Encoded as 2026-11-01 vintages for RS and GS Secondary; Price to Compare unchanged.
2026-10-28ppl-rs-2026-10-01, ppl-rs-2026-12-01content changed (6,881,954 -> 6,882,495 bytes, +541) · 9816851dc331 → e5bfc29c7882no rate change
PPL's Rates and Shopping page was re-rendered: only promotional card text changed (Energy Explained became Bill Toolkit) plus site build IDs. No rate figure moved at any precision. No change to the encoding.
2026-10-28oge-ok-r1-2026-11-01content changed (648,671 -> 649,815 bytes, +1,144) · 0ccc37780049 → c37ec7aa2640re-encoded
OG&E posted its November 2026 - May 2027 fuel factors (18th Revised Sheet 50.85): residential winter fuel 3.8453c -> 3.8439c/kWh from 1 November. Encoded as the 2026-11-01 vintage; October's rates are unaffected until then.
2026-10-27oge-ok-r1-2026-11-01content changed (647,615 -> 648,671 bytes, +1,056) · 1e6f28512d89 → 0ccc37780049change seen, not confirmed by a published source
OG&E's tariffs page added sheet 52.33, 'GCR Factors effective Nov 2026' (Generation Capacity Rider, 1st Revised). That rider is not in the encoded rate. Awaiting a read of the filed sheet and its factors; encoding unchanged.
2026-10-25psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (84,700 -> 84,944 bytes, +244) · b4fc2befdd0e → ccc02ba7abd8no rate change
Xcel's rate books page briefly served an older copy without the 19 October summary link, then restored it. The PSCo plans are already verified against that summary; no rate moved.
2026-10-25sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01content changed (93,478 -> 1,506,451 bytes, +1,412,973) · 149baf6c1c42 → 022b96ee3518no rate change
SCE's Schedule TOU-D was captured truncated on 24 October - 93 KB of a 1.5 MB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate on any TOU-D plan moved.
2026-10-25sce-d-2026-10-01content changed (77,173 -> 684,211 bytes, +607,038) · 30f5096c78c4 → 19d67a0de6edno rate change
SCE's Schedule D was captured truncated on 24 October - 77 KB of a 684 KB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate moved.
2026-10-24psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (84,586 -> 84,700 bytes, +114) · 45c230e00a2e → b4fc2befdd0eno rate change
superseded - answered by the review of 2026-10-25 on a later version of this document
2026-10-24sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01content changed (1,506,451 -> 93,478 bytes, -1,412,973) · 022b96ee3518 → 149baf6c1c42no rate change
superseded - answered by the review of 2026-10-25 on a later version of this document
2026-10-24sce-d-2026-10-01content changed (684,211 -> 77,173 bytes, -607,038) · 19d67a0de6ed → 30f5096c78c4no rate change
superseded - answered by the review of 2026-10-25 on a later version of this document
2026-10-24oconomowoc-rg1-2026-07content changed (157,061 -> 157,988 bytes, +927) · a6ee9e53ea54 → 51e8c29be0bano rate change
Oconomowoc's Public Utilities page removed its fall hydrant-flushing news item. The page carries no rate figures, so it cannot evidence a rate change either way; the Power Cost Adjustment remains a disclosed gap.
2026-10-24dte-d1-11-2026-09-01, dte-d1-13-2026-09-01, dte-d1-2026-09-01content changed (2,815,154 -> 2,611,567 bytes, -203,587) · d9cadeb84131 → c85ceef4be13no rate change
DTE's Sheet C-62.00 now prints the billed PSCR factor for October to December at 1.877c/kWh, the planned figure already encoded. The rest is a re-export of the book; no rate on D1, D1.11 or D1.13 moved.
2026-10-24ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01, ameren-il-ds1-2026-12-01content changed (138,884 -> 139,448 bytes, +564) · 536b41d81709 → 37a93f763654re-encoded
Ameren filed Rider EEA for November 2026 at 0.00987 c/kWh in Rate Zone I, from October's 0.00985 - about two hundredths of a cent a year at 12,000 kWh. Encoded as the 2026-11-01 vintage on the shelf; October's rates are unaffected until then.
2026-10-22nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed, same size (47,338,008 bytes): 2127d1310d33 -> 2520f1675c99no rate change
NYSEG's PSC 120 book was re-exported with character-for-character identical text. No rate, schedule or effective date moved.
2026-10-22dominion-nc-schedule-1-2025-02-01content changed (3,220,827 -> 3,337,726 bytes, +116,899) · 2061ac127f2c → eb2b0ab4ac26no rate change
Dominion North Carolina's 12 October edition adds four energy-efficiency and thermostat programme schedules (CPEPP, CSBBI, RDTST, RPTST). No rate in Schedule 1 or its riders moved.
2026-10-21psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (3,351,437 -> 3,352,279 bytes, +842) · 580e4013ff10 → 3bfafeaabffdre-encoded
Advice Letter 2038, effective 19 Oct 2026, raised Colorado's residential GRSA-E from 0.01452 to 0.01576/kWh and the GRSA to 15.33%. Residential and SG plans re-encoded from the filed rate book; not yet checked against Xcel's 10-19-26 summary.
2026-10-21psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (84,462 -> 84,586 bytes, +124) · f47f50b6e5f6 → 45c230e00a2ealready encoded
Xcel posted its Electric Rates Summary effective 19 October 2026. The residential and Schedule SG rates encoded on 21 October for Advice Letter 2038 (GRSA-E $0.01576, GRSA 15.33%) reproduce every printed total exactly; no rate changes.
2026-10-21consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (20,725,618 -> 20,725,619 bytes, +1) · e4fb28001b31 → a6032440444cno rate change
Consumers Energy filed its November 2026 Power Supply Cost Recovery factor on Sheet D-6.00 at 0.01456 per kWh, the same figure already encoded. No rate changed; the encoding's PSCR note now cites November.
2026-10-15coned-sc1-2026-02-01content changed, same size (65,457,729 bytes): 378e3c249092 -> 3a1eb6b324d7no rate change
Con Edison re-published its tariff PDF with the same content: one leaf (249.4.3, Rider R community solar rules) moved position within the file. No figure, rate or effective date changed, so the encoding is unchanged.
2026-10-14jcpl-rs-2026-10-01content changed (81,212 -> 80,414 bytes, -798) · 64870a4582ad → 4e62964bb618no rate change
FirstEnergy regulatory documents page re-rendered: site navigation and page-chrome markup changed. No figure moved at any precision and the 45 linked tariff PDFs are unchanged. No rate changed; the JCP&L encoding is untouched.
2026-10-13pacificorp-ut-1-2026-09-25content changed (137,307 -> 137,024 bytes, -283) · e9e8fbf55ad0 → de818e635c8bre-encoded
Schedule 92 (GRC deferral) rose from 1.17% to 1.78% for Schedule 1, billed from 25 Sep 2026 through 31 Dec 2026. The filed sheet and the Price Summary agree. We re-encoded the Utah residential plan with the new percentage.
2026-10-13nevada-power-ors-tou-2026-10-01, nevada-power-rs-2026-10-01content changed (496,797 -> 399,359 bytes, -97,438) · ec1e72d91585 → 3cdb45998e58re-encoded
Nevada Power's Statement of Rates took effect 1 Oct 2026. RS is now 11.441c/kWh (was 11.935c): base energy fell and DEAA is a 0.250c credit. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded RS and ORS-TOU.
2026-10-13sierra-pacific-d1-2026-10-01, sierra-pacific-dm1-2026-10-01, sierra-pacific-od1-tou-2026-10-01content changed (357,300 -> 342,360 bytes, -14,940) · 3f9e50eefb44 → aca796ecb43dre-encoded
Sierra Pacific's Statement of Rates took effect 1 Oct 2026. D-1 is now 11.275c/kWh (was 11.528c); the DEAA credit deepened to 0.500c. A bill insert shows slightly different riders; we followed the filed Statement and re-encoded D-1, DM-1 and OD-1 TOU.
2026-10-10pacificorp-ut-1-2026-09-25content changed (133,778 -> 133,996 bytes, +218) · 9176ff6f29e6 → 94e0ffdc6df6re-encoded
The 25 Sep 2026 Price Summary showed Schedule 92 at 1.78%; the filed Schedule 92 sheet now confirms it, effective 25 Sep. Every other Utah figure is unchanged. We re-encoded the Utah residential plan at 1.78%.
2026-10-09niagara-mohawk-sc1-2026-04-01content changed (49,735,401 -> 49,735,529 bytes, +128) · 8e4149fe855d → b71a636430f6no rate change
Niagara Mohawk re-filed Leaf 263.5 (Major Renewable Energy host-community bill credit): revision 20 to 21, effective 9 Oct, with paragraph renumbering 48.x to 58.x only. No rate moved; Leaf 349 (SC1) is untouched. Encoding unchanged.
2026-10-08jcpl-rs-2026-10-01content changed (81,147 -> 82,542 bytes, +1,395) · 0e9904916dfc → 88a562f596a2re-encoded
JCP&L's 10/1/2026 tariff changed four residential items: NGC, SBC, Rider RP (renamed ENJ) and TEC, net about -0.009 c/kWh. Re-encoded from the filed sheets. No published total exists at the new rates yet, so it is disclosed as not reconciled.
2026-10-07coned-sc1-2026-02-01content changed, same size (65,457,729 bytes): d26937fdfbc2 -> 378e3c249092no rate change
Con Edison's tariff PDF was re-rendered: one 59-line leaf (Rider R, CDG credits, effective 02/01/2026) moved to a different position in the file. Same text and figures, nothing added or removed. No rate moved; the encoding is unchanged.
2026-10-06masselectric-r1-2026-10-01, masselectric-r1-heat-pump-2026-10-01content changed, same size (99,707 bytes): aa0b57027e6e -> edd693c2999ano rate change
Massachusetts Electric re-exported its Basic Service sheet; the text is identical character for character. The fixed supply price is still 17.185c/kWh for August 2026 to January 2027, so no rate moved and the encoding is unchanged.
2026-10-06dominion-nc-schedule-1-2025-02-01content changed (2,831,845 -> 3,220,827 bytes, +388,982) · 0a2ce93d3a0f → 2061ac127f2cno rate change
Dominion North Carolina's filing is back to the 2 October edition, byte-identical, with its revised cogeneration purchase rates (Schedules 19-FP and 19-LMP). Its server keeps alternating two editions; neither changes Schedule 1 or its riders.
2026-10-05oncor-residential-2026-10-04content changed (3,241,138 -> 3,886,275 bytes, +645,137) · c1263802662b → 5e9cd16c4f98re-encoded
Oncor put temporary rates into effect on 4 Oct (Docket 59249): TCRF 1.9046c to 2.1669c and DCRF 0 to 0.5755c, +0.8378 c/kWh, about +$8.38 on 1,000 kWh. Re-encoded from 4 Oct; no published total covers it yet, so it is disclosed as unreconciled.
2026-10-04dominion-nc-schedule-1-2025-02-01content changed (3,220,827 -> 2,831,845 bytes, -388,982) · 2061ac127f2c → 0a2ce93d3a0fno rate change
Dominion North Carolina's filing is back to the 21 August edition, byte-identical, as on 2 October. Its server keeps alternating between that and the 2 October cogeneration purchase-rate edition; neither changes Schedule 1 or its riders.
2026-10-03niagara-mohawk-sc1-2026-04-01content changed, same size (49,735,401 bytes): 6898e380d844 -> 8e4149fe855dno rate change
Niagara Mohawk's PSC 220 tariff was re-exported: same size, and the extracted text is identical character for character. No rate or wording changed.
2026-10-03oge-ok-r1-2026-11-01content changed (646,532 -> 647,615 bytes, +1,083) · 3b35ba2a46b1 → 1e6f28512d89re-encoded
OG&E posted Winter Event Securitization factors effective 1 October (residential 0.243c -> 0.219c/kWh). That charge, the SPP Cost Tracker (0.432c) and the Grid Enhancement credit (-0.029c) had been missing; all three are now encoded, about +$6.22 on 1,000 kWh.
2026-10-03lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (123,243 -> 123,241 bytes, -2) · 74791ebdb91d → d34cff152551no rate change
LIPA published its October tariff book. The only change is the Extreme Heat Protections section, cancelled; every rate figure is identical to September's. The watch now reads the October book.
2026-10-03aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (774,996 -> 796,301 bytes, +21,305) · 38d079c1606f → 9a634ca5dea9re-encoded
PUCO published Ohio Power's Oct-Dec Price to Compare, $0.1019/kWh ($0.1097 before), which the October encoding reproduces. Checking it corrected the Alternative Energy Rider to its filed 0.38973c (was 0.3897c), +$0.0003 on 1,000 kWh.
2026-10-03dominion-nc-schedule-1-2025-02-01content changed (2,831,845 -> 3,220,827 bytes, +388,982) · 0a2ce93d3a0f → 2061ac127f2cno rate change
Dominion North Carolina's filing is back to the 2 October edition, byte-identical, with its revised cogeneration purchase rates (Schedules 19-FP and 19-LMP). Its server keeps alternating two editions; neither changes Schedule 1 or its riders.
2026-10-02dominion-va-schedule-1-2026-11-01content changed (9,249,299 -> 15,078,887 bytes, +5,829,588) · 2231c2aca3b3 → b6a2fa061218no rate change
Dominion Virginia's October book changes shared-solar bill credits (residential -13.232c -> -13.528c), the EV Level 2 charging price ($0.34 -> $0.33) and Rider SMR's stated period. Schedule 1 and every rider it uses are unchanged.
2026-10-02dominion-nc-schedule-1-2025-02-01content changed (3,220,827 -> 2,831,845 bytes, -388,982) · 2061ac127f2c → 0a2ce93d3a0fno rate change
Dominion North Carolina's filing is back to the 21 August edition, byte-identical, as on 2 October. Its server keeps alternating between that and the 2 October cogeneration purchase-rate edition; neither changes Schedule 1 or its riders.
2026-10-02nspmn-residential-2026, nspmn-residential-esh-2026content changed (922,986 -> 995,638 bytes, +72,652) · 874ea978a077 → 9618b10d31b7re-encoded
Xcel Minnesota re-filed October's residential fuel factor (Sheet 91.1, effective 1 October): 2.243c -> a credit of -0.179c/kWh, about -$24.22 on a 1,000 kWh October. Other months unchanged. Encoded on both Minnesota plans.
2026-10-02psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (83,812 -> 84,462 bytes, +650) · abfeb44a3962 → f47f50b6e5f6already encoded
Xcel posted its Electric Rates Summary effective 1 October 2026. All eight PSCo residential rates and the $8.22 service charge encoded on 30 September reproduce its totals exactly; no rate changes.
2026-10-02masselectric-r1-2026-10-01, masselectric-r1-heat-pump-2026-10-01content changed (179,790 -> 189,110 bytes, +9,320) · 82f608de6aad → a3f93f31359ere-encoded
M.D.P.U. No. 1-26-I, effective 1 October: R-1 net distribution 10.422c -> 10.924c/kWh (base distribution, advanced metering and a new performance incentive factor). Delivery 22.327c -> 22.829c, about +$5.02 on 1,000 kWh. Both Mass Electric plans re-encoded.
2026-10-02masselectric-r1-2026-10-01, masselectric-r1-heat-pump-2026-10-01content changed (95,772 -> 99,707 bytes, +3,935) · db748a777a36 → aa0b57027e6eno rate change
Basic Service sheet re-issued under M.D.P.U. No. 1-26-I with only the filing number and dates changed. The fixed supply price is still 17.185c/kWh for August 2026 to January 2027.
2026-10-02entergy-texas-rs-2026-11-01content changed (53,275 -> 53,229 bytes, -46) · 803c57706d15 → 3d66fb09bf08no rate change
Only the month label changed, September to October. Every line of the Entergy Texas sample bill is identical, still $157.65 on 1,000 kWh.
2026-10-02entergy-neworleans-res25-2026-11-01content changed (90,507 -> 90,274 bytes, -233) · d0ea4cc8b8c8 → 7177c7a19c8fre-encoded
New Orleans fuel adjustment for October 2026 is 1.6246c/kWh (Legacy ENO), down from 1.8153c. Encoded as entergy-neworleans-res25-2026-10-01.
2026-10-02entergy-neworleans-res25-2026-11-01content changed (103,972 -> 104,859 bytes, +887) · adfb95b93219 → a407a0aa10bfre-encoded
Residential PPCR for October 2026 is 3.028659%, down from 6.695326%. Encoded as entergy-neworleans-res25-2026-10-01.
2026-10-02entergy-neworleans-res25-2026-11-01content changed (78,624 -> 78,548 bytes, -76) · 3311e8016118 → 7dda970e76c8no rate change
October's New Orleans EAC row was appended at $0.000000, the same as September; a 2024 row rolled off.
2026-10-02entergy-neworleans-res25-2026-11-01content changed (52,950 -> 52,947 bytes, -3) · 7ec318a0cd80 → 319dd8d800aere-encoded
Entergy New Orleans's October bill: fuel 1.8153c -> 1.6246c/kWh, PPCR 6.695326% -> 3.028659%. $158.04 -> $152.65 on 1,000 kWh. Encoded as entergy-neworleans-res25-2026-10-01.
2026-10-02entergy-mississippi-rs40c-2026-10-01content changed (54,917 -> 54,910 bytes, -7) · fc222d375c94 → 0744ae2279cfre-encoded
Entergy Mississippi's October bill: MSE/RM 20.26223% -> 20.31900%, unit power cost 0.27724% -> 0%, ad valorem 4.9595% -> 4.6650%. $165.10 -> $164.39 on 1,000 kWh. Encoded as entergy-mississippi-rs40c-2026-10-01.
2026-10-02entergy-mississippi-rs40c-2026-10-01content changed (68,118 -> 88,876 bytes, +20,758) · 81ecad47fc3f → 0e2ca5abf20are-encoded
Unit power cost adjustment is 0.00000% from October 2026, down from 0.27724%. Encoded as entergy-mississippi-rs40c-2026-10-01.
2026-10-02entergy-mississippi-rs40c-2026-10-01content changed (100,705 -> 101,726 bytes, +1,021) · 10822984fc57 → 25847c75224ere-encoded
MSE/RM for October 2026 to September 2027 is 20.31900% (MSE-4 now -40.53016%), replacing 20.26223%. Encoded as entergy-mississippi-rs40c-2026-10-01.
2026-10-02entergy-mississippi-rs40c-2026-10-01content changed (87,714 -> 88,130 bytes, +416) · b10fa3c3298c → 240b716afe42re-encoded
Ad valorem tax adjustment is 4.6650% from October 2026, down from 4.9595%. Encoded as entergy-mississippi-rs40c-2026-10-01.
2026-10-02entergy-louisiana-rs-2026-11-01content changed (91,884 -> 91,631 bytes, -253) · 533ccc4a517a → 4cfe73cd7827re-encoded
Entergy Louisiana's October fuel adjustment, 2.748c/kWh (2.821c in September). Encoded as entergy-louisiana-rs-2026-10-01, which reproduces the October sample bill.
2026-10-02entergy-louisiana-rs-2026-11-01content changed (77,517 -> 77,464 bytes, -53) · 693b5be3e453 → 73ff931bcc9ano rate change
October's fuel stabilization factor is 0.0002c/kWh, the same as September; the change was a 2024 row rolling off the table.
2026-10-02entergy-louisiana-rs-2026-11-01content changed (57,929 -> 58,000 bytes, +71) · 8434ecc9fead → 7241de462a91re-encoded
October factors for Entergy Louisiana: fuel 2.821c -> 2.748c/kWh, EAC 0.0037c -> 0.0047c, FSCIV hurricane charge 18.3937% -> 17.5102%. $147.35 -> $146.19 on 1,000 kWh. Encoded as entergy-louisiana-rs-2026-10-01.
2026-10-02entergy-louisiana-rs-2026-11-01content changed (91,740 -> 91,571 bytes, -169) · 93c276793853 → 516895ec30e2re-encoded
Entergy Louisiana's October environmental adjustment, 0.0047c/kWh (0.0037c in September). Encoded as entergy-louisiana-rs-2026-10-01.
2026-10-02entergy-arkansas-rs-2026-08-01content changed (54,618 -> 54,675 bytes, +57) · 2d133b2958fb → 887245daa462no rate change
Entergy Arkansas's October sample bill is a winter bill ($143.81 on 1,000 kWh). Every rider rate on it is unchanged; the drop is the October-May base rate, which the encoding already carries and now reproduces to the cent.
2026-10-02duke-in-rs-2026-11-01content changed (683,658 -> 199,128 bytes, -484,530) · 02e241bd9787 → 6d2adc25d235re-encoded
Duke Energy Indiana's fuel cost adjustment for bills from October 2026: Rate RS 0.4667c -> 0.7434c/kWh. With the generation cost tracker, about +$3.72 on 1,000 kWh. Encoded as duke-in-rs-2026-10-01.
2026-10-02duke-in-rs-2026-11-01content changed (319,848 -> 80,480 bytes, -239,368) · 4d2ae5f63bf0 → 35fdd555719fre-encoded
The Q4 2026 tracker table: on Rate RS, fuel 0.004667 -> 0.007434 and generation cost tracker 0.002410 -> 0.003363 $/kWh from October billing; the other nine are unchanged. Encoded as duke-in-rs-2026-10-01.
2026-10-02bge-r-2026-10-01content changed (97,046 -> 96,700 bytes, -346) · 41737c48d7ec → 859c0f7b2edaalready encoded
BGE's October Rider 25 values, now fetched at their new address. Schedule R ($0.00173)/kWh is what bge-r-2026-10-01 already carries.
2026-10-02ameren-mo-1m-2026-10-01content changed (523,145 -> 470,865 bytes, -52,280) · 94df4292b245 → cc48911ab61fre-encoded
Ameren Missouri's fuel adjustment for 1 October 2026 to 31 January 2027: $0.00894 -> $0.00445/kWh at secondary voltage, about -$4.49 on 1,000 kWh. Encoded as ameren-mo-1m-2026-10-01.
2026-10-02aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (180,694 -> 180,712 bytes, +18) · 01f20c788f4d → 02bdca42229aalready encoded
The page now links AEP's October documents (Ohio_Power tariff book and 29 September workbooks), which both October AEP Ohio encodings were built from on 1 October.
2026-10-02ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01content changed (756,541 -> 758,652 bytes, +2,111) · 83d4d7016937 → 62a6175a9db1already encoded
PUCO published Ohio Edison's Oct-Dec Price to Compare, $0.1107/kWh. The October encoding's supply riders sum to 11.0703c, so it now reconciles; no rate changes.
2026-10-02dominion-nc-schedule-1-2025-02-01content changed (2,831,845 -> 3,220,827 bytes, +388,982) · 0a2ce93d3a0f → 2061ac127f2cno rate change
Dominion North Carolina's filing is back to the 2 October edition, byte-identical, with its revised cogeneration purchase rates (Schedules 19-FP and 19-LMP). Its server keeps alternating two editions; neither changes Schedule 1 or its riders.
2026-10-01oncor-residential-2026-10-04content changed (86,751 -> 88,333 bytes, +1,582) · 461fbefad946 → dcc63098a028no rate change
PUCT's 1 October comparison: CenterPoint 6.5333c (already encoded) and Oncor unchanged at 6.0295c. AEP Texas and TNMP moved, but neither is encoded here.
2026-10-01pacificorp-wa-16-2026-11-07content changed (94,970 -> 100,385 bytes, +5,415) · 0235d1c287d5 → bbbc07ccd4a5re-encoded
Schedule 99 Production Tax Credit Tracker re-set from 1 October (Advice 26-03): Schedule 16 residential -0.105c -> -0.073c/kWh, about +$0.32 on 1,000 kWh. Encoded as pacificorp-wa-16-2026-10-01.
2026-10-01pacificorp-wa-16-2026-11-07content changed (155,919 -> 155,983 bytes, +64) · e148b42068ac → 1ff578e6b713already encoded
New edition effective 1 October 2026. Only Schedule 99 moved (-0.105c -> -0.073c on Schedule 16), Combined 14.311c -> 14.343c, which matches the re-encoded pacificorp-wa-16-2026-10-01 exactly.
2026-10-01firstenergy-pa-met-ed-gs-small-2026-10-01, firstenergy-pa-met-ed-rs-2026-10-01, firstenergy-pa-penelec-gs-small-2026-10-01, firstenergy-pa-penelec-rs-2026-10-01content changed (2,670,261 -> 2,670,563 bytes, +302) · 166d11e77601 → 665736ea46b7re-encoded
Supplement 40 re-sets the DSIC for 1 Oct-31 Dec: Met-Ed 0.31% -> 2.02%, Penelec 1.35% -> 2.70%, Penn Power 0.69% -> 2.40%, West Penn 0.26% -> 0.75%. About +$0.35 to +$2.32 on a 1,000 kWh month. All four districts re-encoded from 1 October.
2026-10-01ohio-edison-gs-2026-10-01, ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01content changed (9,420,904 -> 9,410,795 bytes, -10,109) · 556ab6b74b89 → 85f686b09eaere-encoded
Ohio Edison's quarterly riders re-filed for 1 October. On Rate RS: GCR 0.7639c -> 0.9846c, PIPP 0.365c -> 0.465c, Modern Grid $2.273 -> $1.299/month, plus small moves in AER, NDU, DUN, PUR, DRR and EDR. Net +0.22c/kWh. Encoded as ohio-edison-rs-2026-10-01.
2026-10-01duke-fl-rs1-2026-10-01content changed (157,627 -> 138,469 bytes, -19,158) · b4feaa5433dd → af59656fad64re-encoded
RS-1 base charges re-issued for 1 October: customer $14.35 -> $14.43, non-fuel energy up about 0.6% (7.686c -> 7.731c first 1,000 kWh, Mar-Nov). With the fuel rise, about +$7.15 on a 1,000 kWh month. Encoded as duke-fl-rs1-2026-10-01.
2026-10-01duke-fl-rs1-2026-10-01content changed (192,878 -> 194,714 bytes, +1,836) · 58c1df6cecd2 → a5567a1eb63are-encoded
RS-1 fuel charge rises from 1 October: 3.465c -> 4.127c/kWh on the first 1,000 kWh and 4.535c -> 5.197c above. Cost recovery factors unchanged. Encoded as duke-fl-rs1-2026-10-01.
2026-10-01dominion-va-schedule-1-2026-11-01content changed (111,638 -> 111,754 bytes, +116) · 4c88430e6d4d → 5c3eff837f08no rate change
Rider SMR's entry now states its period, 09-01-26 through 08-31-27, and the filing date changed. No rider was added to or removed from any schedule, and no rate moved.
2026-10-01consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (20,726,127 -> 20,725,618 bytes, -509) · 468f3e607a9f → e4fb28001b31re-encoded
Karn 1 and 2 securitization re-set for the October 2026 billing month, 0.4049c -> 0.4237c/kWh on RSP and RSH. Re-encoded from 1 October, also correcting LIEAF to $1.50 (in force since September) and power plant securitization to 0.1156c (since August).
2026-10-01aep_ohio_gs_workbookcontent changed (1,658,470 -> 1,660,735 bytes, +2,265) · f21cf6cc11b2 → 6e1e6440632falready encoded
The workbook watch was repointed to AEP's 29 September Ohio Power file, so this is the October calculator. The GS October encoding was built from it the same day.
2026-10-01aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (180,739 -> 180,694 bytes, -45) · 7e5fa71f4ae9 → 01f20c788f4dno rate change
A reboot-time capture of the page's static HTML, which still links September's documents. The October documents were found and encoded on 1 October from the rendered page.
2026-10-01oncor-residential-2026-10-04content changed (88,310 -> 276,445 bytes, +188,135) · ef82a74e730e → 8e5a29b689b3no rate change
Only the report's 'As of' month changed, September to October. Every Oncor figure is identical, still $1.48 + $2.58 and 6.0295c/kWh.
2026-10-01centerpoint-houston-residential-2026-11-13content changed (84,702 -> 269,441 bytes, +184,739) · a84704f673d3 → 1b60f48c2b43already encoded
The PUCT report now prints CenterPoint's 30 September rates: 6.5333c/kWh, $70.23 on 1,000 kWh. That is exactly the encoding re-encoded that morning, so it now reconciles to the cent.
2026-10-01sce-toud-4-9-2026-10-01, sce-toud-5-8-2026-10-01, sce-toud-prime-2026-10-01content changed (1,508,586 -> 1,506,451 bytes, -2,135) · 28cc218a0325 → 022b96ee3518no rate change
SCE's Schedule TOU-D was captured truncated on 24 October - 93 KB of a 1.5 MB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate on any TOU-D plan moved.
2026-10-01sce-d-2026-10-01content changed (683,345 -> 684,211 bytes, +866) · fa36ec00be6f → 19d67a0de6edno rate change
SCE's Schedule D was captured truncated on 24 October - 77 KB of a 684 KB file, a timed-out download - and fetched whole on the 25th, byte-identical to the 1 October document. No rate moved.
2026-10-01bge-r-2026-10-01content changed (232,854 -> 229,926 bytes, -2,928) · e0fb2fc3401e → 8d134a8f417bre-encoded
BGE's October SOS period: Schedule R supply 15.190c before Rider 8; BGE's published Price to Compare is 14.140c (was 14.609c). With Rider 25 at (0.173)c for October, about -$4.24 on 1,000 kWh. Encoded as bge-r-2026-10-01.
2026-10-01psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (92,551 -> 94,420 bytes, +1,869) · 64a067343ce1 → 8e63423fb910re-encoded
Xcel corrected its 29 August summary for commercial classes; residential rows unchanged. The correction showed Schedule SG missing the 14.12% GRSA and new PCCA/TCA from 29 August, and two riders wrong since July. SG re-encoded from the filed sheets for all three periods.
2026-10-01nspmn-residential-2026, nspmn-residential-esh-2026content changed (921,619 -> 922,986 bytes, +1,367) · d88e7afb1925 → 874ea978a077no rate change
Sheet 93.3 revised city franchise fees for Minneapolis and Newport from October. Franchise fees are excluded from these plans; no encoded rate moved.
2026-10-01nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed (130,606 -> 130,650 bytes, +44) · 81874a6b4524 → 596ce8d7882ere-encoded
NYSEG Transition Charge Statement 265: the SC1 credit deepens from 0.2525c to 0.6072c/kWh, lowering delivery by 0.355c/kWh. Effective 1 October; encoded as the October vintage.
2026-10-01nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed (47,041,848 -> 47,338,008 bytes, +296,160) · 6e881092d434 → 2127d1310d33no rate change
NYSEG added a Host Community Benefit Program leaf: an annual bill credit for customers in towns hosting a major renewable facility, which depends on address. No SC1 rate moved.
2026-10-01niagara-mohawk-sc1-2026-04-01content changed (49,893,023 -> 49,735,401 bytes, -157,622) · a49fd21c9808 → 6898e380d844no rate change
Niagara Mohawk added the statewide Renewable Host Community Benefit Program, an address-dependent annual credit. No SC1 rate moved.
2026-10-01coned-sc1-2026-02-01content changed (113,061,794 -> 65,457,729 bytes, -47,604,065) · 309233358ea4 → d26937fdfbc2no rate change
Con Edison added the statewide Renewable Host Community Benefit Program, an address-dependent annual credit for SC1. No SC1 rate moved.
2026-10-01consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (3,690,332 -> 3,721,007 bytes, +30,675) · 050f62e50476 → 05b228bb64b6no rate change
The MPSC added its September PSCR page: Consumers Energy unchanged at 14.56 mills/kWh, as already encoded. No rate change for these plans.
2026-10-01lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (147,320 -> 148,562 bytes, +1,242) · 8e7e8d69c931 → afdcc0d82b03re-encoded
LIPA Statement 118 sets October's Power Supply Charge at 13.9200c/kWh, down from 13.9822c; the time-of-use factors are unchanged. Effective 1 October; all four SC-1 plans re-encoded.
2026-10-01fpl-rs1-2026-10-01content changed (1,452,482 -> 1,271,113 bytes, -181,369) · 9766f7409a3c → aca4fa294de1already encoded
FPL removed September's one-month storm restoration refund (-0.797c/kWh on RS-1). The October vintage restoring January's rates was already on the scheduled shelf and took effect 1 October.
2026-10-01cps-ra-2026-11-01, cps-re-2026-11-01content changed (147,309 -> 149,562 bytes, +2,253) · 0807df05f74a → 35fbea7eb552re-encoded
CPS published October's residential fuel and regulatory factor at 4.599c/kWh (August's 4.103c had been encoded, and September's 4.145c was missed). Effective 1 October; RE and RA re-encoded.
2026-10-01aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (177,004 -> 180,739 bytes, +3,735) · fd5019313e1a → 7e5fa71f4ae9re-encoded
AEP Ohio's October filing (now titled Ohio Power): transmission 4.344c to 4.412c, PIPP 0.552c to 0.636c, gridSMART $2.65 to $1.26/month, auction reconciliation +0.412c to -0.372c. Effective 1 October; RS and GS Secondary re-encoded.
2026-10-01sdge-dr-2026-08-01content changed (7,077 -> 7,037 bytes, -40) · 4eaf0e1793ab → 6d30751e0680no rate change
SDG&E's schedule index updated its sheet counts. SDG&E's own Total Electric Rates page still lists the 8/1/26 Schedule DR table as current, which is what is encoded. No rate change.
2026-10-01centerpoint-houston-residential-2026-11-13content changed (6,773,222 -> 6,672,808 bytes, -100,414) · 362d77774cd3 → b6519f0c45b8re-encoded
CenterPoint's DCRF rose from 0.4934c to 0.6137c/kWh (interim, Docket 59981), about $1.20 a month at 1,000 kWh. Effective 30 September; re-encoded. No other rider moved.
2026-09-30psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (3,310,707 -> 3,351,437 bytes, +40,730) · 1312faf7ec32 → 580e4013ff10re-encoded
Q4 ECA and the annual EEAC reset, both from 1 October: Schedule R ECA 3.012c to 2.520c/kWh, RE-TOU and R-OO 29.00% to 29.42% of base, EEAC $0.83 to $0.86. Winter R 16.203c to 15.695c. Encoded onto the scheduled shelf; September rates apply until then.
2026-09-30nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed, same size (47,041,848 bytes): 24841969c95c -> 6e881092d434no rate change
NY DPS regenerated NYSEG's PSC 120 book on 30 September: identical text with one VDER leaf reordered. No figure, schedule or effective date moved. Riders are watched separately and did not change.
2026-09-30niagara-mohawk-sc1-2026-04-01content changed, same size (49,893,023 bytes): 88ee4e77b8f3 -> a49fd21c9808no rate change
NY DPS regenerated Niagara Mohawk's PSC 220 book on 30 September; only internal timestamps changed and the text is identical to the version encoded. No rate change.
2026-09-30lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (122,468 -> 123,243 bytes, +775) · ce4c991ad407 → 74791ebdb91dno rate change
LIPA posted Value Stack Credit Statement 103 for October, replacing Statement 102. Value Stack credits apply to customer-generators on SC 2-L, 2L-VMRP, 2-MRP and 121, not to SC-1 bills, so no encoded rate changed.
2026-09-30duke-in-rs-2026-11-01content changed (922,292 -> 926,929 bytes, +4,637) · 16e2c5260412 → 604022df18bcno rate change
Duke's tariff index page changed only its site scripts and footer. The Rate RS sheet, quarterly trackers, fuel and efficiency riders and sample bill this plan is built from are watched directly and did not change.
2026-09-30dte-d1-11-2026-09-01, dte-d1-13-2026-09-01, dte-d1-2026-09-01content changed (2,611,623 -> 2,815,154 bytes, +203,531) · 310fb18c5820 → d9cadeb84131re-encoded
DTE's LIEAF charge rose from $1.25 to $1.50 a month for bills from 1 September (Sheet C-69), taking the fixed charge on D1, D1.11 and D1.13 from $9.75 to $10.00. No energy rate moved. Re-encoded as the 2026-09-01 vintages.
2026-09-29pge-e1-2026-06-01content changed, same size (656,128 bytes): 39fbba73bbe0 -> ec38d13fec76no rate change
PG&E regenerated the Schedule E-1 PDF on 28 September; only the file's internal timestamps changed, and the text is identical to the version encoded. No rate change.
2026-09-25nspmn-residential-2026, nspmn-residential-esh-2026content changed (921,104 -> 921,619 bytes, +515) · e2d8bb7a7189 → d88e7afb1925no rate change
Sheet 93.4 revised: the Rogers city franchise fee rose from $5.00 to $8.00 a month (residential) from September. City franchise fees are excluded from these plans, so no encoded rate changed.
2026-09-25psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (3,263,631 -> 3,310,707 bytes, +47,076) · 08ff17f819a3 → 1312faf7ec32no rate change
Sheets 33 and 39 revised, effective 28 September: RE-TOU and C-TOU availability now sets the transition date for advanced meters received after 2025. Wording only; no rate figure moved anywhere in the book.
2026-09-25centerpoint-houston-residential-2026-11-13content changed (342,611 -> 342,485 bytes, -126) · 56bd26789f68 → 9069df1e3c12no rate change
Page text unchanged; CenterPoint dropped the version tag from its tariff link. The linked book is byte-identical to the 22 September filing already encoded. No rate change.
2026-09-25apco-va-rs-2026-11-01content changed (179,124 -> 179,299 bytes, +175) · 3aea9953ecfe → 550f1eec6b7are-encoded
APCo filed Virginia's Rider B.C.-RAC update: 0.059c to 0.211c/kWh, taking the all-in rate 16.037c to 16.189c (+$1.52/month at 1,000 kWh). Effective 24 September; re-encoded as apco-va-rs-2026-09-24, which now matches APCo's $169.85 typical bill.
2026-09-24pacificorp-wy-2-2026-07-01content changed (253,270 -> 372,983 bytes, +119,713) · a9190425e7b4 → e354553c6914no rate change
Rocky Mountain Power's server has served two editions of Schedule 95. Today's is the current Third Revision (effective 1 July 2026, ECAM deferred 0.331c), which the encoding already carries. No rate change.
2026-09-24pacificorp-wy-2-2026-07-01content changed (192,524 -> 307,286 bytes, +114,762) · ba9434f77ef4 → c277caef5168no rate change
Rocky Mountain Power's server alternates two revisions of Schedule 93 at one URL. Today's copy is byte-identical to the current one held since 19 Sep; the encoded -0.053c is unchanged. No rate change.
2026-09-24pacificorp-ut-1-2026-09-25content changed (391,727 -> 624,886 bytes, +233,159) · 34e7de80f8a4 → d147ca4d3c3fno rate change
Rocky Mountain Power's server alternates two editions of Schedule 94. Today's is byte-identical to the current P.S.C.U. No. 52 copy held since 19 Sep; the encoded 7.63% EBA is unchanged. No rate change.
2026-09-24pacificorp-wa-16-2026-11-07content changed (152,245 -> 155,919 bytes, +3,674) · 12efe4dd6ff7 → e148b42068acno rate change
Pacific Power's server alternates the April and September editions of this summary. Today's is the 1 September edition, byte-identical to 20 Sep, matching the encoded 14.311c combined rate. No rate change.
2026-09-24pacificorp-ca-d-2026-06-08content changed (136,871 -> 116,351 bytes, -20,520) · cb042e2c1257 → d46854dc406bno rate change
Pacific Power's server alternates two editions of Schedule S-96. Today's is the current July 2026 sheet ($12.17/month), byte-identical to 20 Sep and already encoded. No rate change.
2026-09-24pacificorp-ca-d-2026-06-08content changed (129,955 -> 149,685 bytes, +19,730) · 7b9d7ecebbb8 → 6540243be2b4no rate change
Pacific Power's server alternates two editions of Schedule ECAC-94. Today's is the current June 2026 sheet (5.286c), byte-identical to 19 Sep and already encoded. No rate change.
2026-09-22pacificorp-ut-1-2026-09-25content changed (178,860 -> 321,062 bytes, +142,202) · 87fda3eeef9f → 82e58663f584no rate change
The CDN returned the current Third Revision of Sheet 1.2 again, byte-identical to 27 August, after serving the superseded Second on the 21st. No rate moved. Utah's encoding is built from the Third and is unaffected.
2026-09-22ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01, ameren-il-ds1-2026-12-01content changed (109,283 -> 158,145 bytes, +48,862) · 81a615a92c93 → ca18a49f4aa0re-encoded
Ameren filed Rider CSESC's October-December 2026 quarter at $0.00008/kWh, down from $0.00009 since April - about twelve cents a year at 12,000 kWh. Encoded onto the scheduled shelf for 1 October; September's rate is unaffected.
2026-09-22pacificorp-ut-1-2026-09-25content changed (624,886 -> 391,727 bytes, -233,159) · d147ca4d3c3f → 34e7de80f8a4no rate change
Rocky Mountain Power re-served Schedule 94 from the SUPERSEDED tariff book P.S.C.U. No. 51, which prints the old 22.14% EBA. Book 52, in force since the 10 Aug rate case, carries 7.63% - the encoded figure. No rate moved.
2026-09-22pacificorp-ca-d-2026-06-08content changed (116,351 -> 136,871 bytes, +20,520) · d46854dc406b → cb042e2c1257no rate change
Pacific Power served the superseded Cal.P.U.C. Sheet 5266-E in place of 5306-E. The current sheet carries the CEMA surcharge at $12.17/month on Schedule D, effective 10 July 2026, which pacificorp-ca-d already encodes. No rate moved.
2026-09-22pacificorp-ca-d-2026-06-08content changed (149,685 -> 129,955 bytes, -19,730) · 6540243be2b4 → 7b9d7ecebbb8no rate change
Pacific Power served an older ECAC-94 compilation (top sheet 5211-E) in place of 5303-E. The sheet in force gives Schedule D 4.498c base plus 0.788c adjustment = 5.286c, which is the encoded figure. No rate moved.
2026-09-22consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (20,733,449 -> 20,726,127 bytes, -7,322) · 35f8197efd4c → 468f3e607a9fno rate change
Consumers filed the 83rd Revised Sheet D-6.00, filling in the October 2026 PSCR factor at $0.01456/kWh - the same figure billed since July. No rate moved. The encoding already carries it; the note claiming August was unpublished is refreshed.
2026-09-22centerpoint-houston-residential-2026-11-13content changed (320,166 -> 342,611 bytes, +22,445) · 5de9b19289cb → 56bd26789f68re-encoded
CenterPoint republished its tariff book on 22 Sep carrying rates effective 1 September. Four riders moved, Rider TCRF 1.6173c to 3.0812c the bulk of it: delivery goes 5.1461c to 6.4130c per kWh, about +$12.67 a month at 1,000 kWh. Re-encoded.
2026-09-22ameren-il-ds1-2026-09-01, ameren-il-ds1-2026-10-01, ameren-il-ds1-2026-11-01, ameren-il-ds1-2026-12-01content changed (138,520 -> 138,884 bytes, +364) · 3bc923be1b4b → 536b41d81709re-encoded
Ameren filed Rider EEA for October 2026 at 0.00985 c/kWh, from September's 0.00987 - about two hundredths of a cent a year at 12,000 kWh. Re-encoded; the September vintage had been carrying August's figure.
2026-09-22aep-ohio-gs-secondary-2026-11-01, aep-ohio-rs-2026-09-01, aep-ohio-rs-2026-10-01, aep-ohio-rs-2026-11-01content changed (177,001 -> 177,004 bytes, +3) · 84ced2492d03 → fd5019313e1ano rate change
AEP replaced the Residential Rate to Compare workbook with a 'v1' of the same 08282026 date. One cell differs - Customer Info!C25, 2025 to 2026. Every Price to Compare figure is identical. The old URL now 404s and the watched source is repointed.
2026-09-21pacificorp-wy-2-2026-07-01content changed (307,286 -> 192,524 bytes, -114,762) · c277caef5168 → ba9434f77ef4no rate change
Rocky Mountain Power re-served the superseded First Revision of Sheet 93-5 (issued Jul 2025, Schedule 2 at -0.065c). The Second Revision, issued Apr 2026, is in force: -0.050c base and -0.003c deferred, the encoded -0.053. No rate moved.
2026-09-21pacificorp-ut-1-2026-09-25content changed (321,062 -> 178,860 bytes, -142,202) · 82e58663f584 → 87fda3eeef9fno rate change
The superseded Second Revision of Sheet 1.2, effective Dec 2025, came back for the third time. The Third Revision, effective 10 Aug 2026, is current and byte-identical to the 19 Sep capture. No rate moved.
2026-09-21pacificorp-ut-1-2026-09-25content changed (134,547 -> 133,778 bytes, -769) · 40d5255b44e9 → 9176ff6f29e6no rate change
RMP published the 10 Aug 2026 edition, replacing 1 Jun 2026. It is the first to print GRCDA (Sch 92) and WBA (Sch 97) as columns, and all 13 encoded Utah constants agree with it. No rate moved; a disclosed reconciliation gap closes.
2026-09-21pacificorp-wa-16-2026-11-07content changed (142,679 -> 140,510 bytes, -2,169) · 9a38c4070e48 → 6d23667ed059no rate change
Pacific Power serves two revisions of this URL. The 21 Sep capture is the Tenth Revision of Sheet 93.1, byte-identical to 19 Sep; the 20th served the superseded Ninth. No rate moved - the encoded 0.549 c/kWh decoupling adjustment stands.
2026-09-21pacificorp-wa-16-2026-11-07content changed (155,919 -> 152,245 bytes, -3,674) · e148b42068ac → 12efe4dd6ff7no rate change
Two editions at one URL: 21 Sep returned the 3 April 2026 summary, 20 Sep the 1 September 2026 one. September is in force and is what pacificorp-wa-16 is built from (combined 14.311 c/kWh). No rate moved.
2026-09-20pacificorp-wa-16-2026-11-07content changed (140,510 -> 142,679 bytes, +2,169) · 6d23667ed059 → 9a38c4070e48re-encoded
The Tenth Revision of Sheet 93.1 sets the decoupling adjustment at 0.549 c/kWh from 1 September, against the 0.315 encoded. Same change as the Price Summary; pacificorp-wa-16 re-encoded to 2026-09-01.
2026-09-20pacificorp-wa-16-2026-11-07content changed (152,245 -> 155,919 bytes, +3,674) · 12efe4dd6ff7 → e148b42068acno rate change
Pacific Power's server alternates the April and September editions of this summary. Today's is the 1 September edition, byte-identical to 20 Sep, matching the encoded 14.311c combined rate. No rate change.
2026-09-20pacificorp-ca-d-2026-06-08content changed (136,871 -> 116,351 bytes, -20,520) · cb042e2c1257 → d46854dc406bno rate change
Pacific Power's server alternates two editions of Schedule S-96. Today's is the current July 2026 sheet ($12.17/month), byte-identical to 20 Sep and already encoded. No rate change.
2026-09-19pacificorp-ut-1-2026-09-25content changed (178,860 -> 321,062 bytes, +142,202) · 87fda3eeef9f → 82e58663f584no rate change
The CDN returned the current Third Revision of Sheet 1.2 again, byte-identical to 27 August, after serving the superseded Second on the 21st. No rate moved. Utah's encoding is built from the Third and is unaffected.
2026-09-18pacificorp-ut-1-2026-09-25content changed (321,062 -> 178,860 bytes, -142,202) · 82e58663f584 → 87fda3eeef9fno rate change
The superseded Second Revision of Sheet 1.2, effective Dec 2025, came back for the third time. The Third Revision, effective 10 Aug 2026, is current and byte-identical to the 19 Sep capture. No rate moved.
2026-09-16jcpl-rs-2026-10-01content changed, same size (81,212 bytes): 0e1d95e84dd2 -> 64870a4582adno rate change
JCP&L's regulatory filings page changed by one word of navigation text: 'Pay As A Guest' became 'Pay as a Guest'. Nothing else moved - all 146 links identical, no figure at any precision. This page carries proceedings rather than rates, and jcpl-rs-2026-07-15 is unaffected.
2026-09-15psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (83,921 -> 83,812 bytes, -109) · 3a1535344d1c → abfeb44a3962already encoded
Xcel's Summary of Electric Rates as of 09-01-26 is the published total these three plans were encoded ahead of on 29 August. Read 16 Sep: all eight rates and the service charge reconcile. One correction - Schedule R-OO winter 0.15455 to 0.15456/kWh, a hundredth of a cent, from where Xcel takes the RESA uplift.
2026-09-12consumers-rsh-2026-10-01, consumers-rsp-2026-10-01content changed (20,686,464 -> 20,733,449 bytes, +46,985) · 419c6bbeb711 → 35f8197efd4cno rate change
Consumers added Rule C5.7, an Extreme Weather Conditions policy suspending shutoffs for nonpayment in qualifying weather, on Sheet C-26.00 effective 2 September. A service rule, not a charge: no rate, rider or schedule figure moved. RSH and RSP are unaffected.
2026-09-12apco-wv-rs-2026-09-01content changed (168,483 -> 168,488 bytes, +5) · f48f0adab25f → 466da6c91dccalready encoded
APCo published its filed September sheets: ENEC_Tariff_Sheets_Eff_9-1-26.pdf replaces the July file. Rider E.N.E.C. 5.7790c to 5.8570c/kWh from 1 September - which is the rate already being served. It was derived from APCo's own typical bill on 4 September and the filed sheet now confirms it to the digit.
2026-09-12pseg-rs-2026-07-15, pseg-rs-tou-3p-2026-07-15content changed (1,729,715 -> 1,731,718 bytes, +2,003) · 7ce40f28482d → baf93c0f324ano rate change
A re-export of the same tariff. One stray character was removed from a contents-page header; the other 657,801 characters of extracted text are identical. No figure moved and no schedule name entered or left an applicability list.
2026-09-11nspmn-residential-2026, nspmn-residential-esh-2026content changed (924,377 -> 921,104 bytes, -3,273) · 8d69619a546a → e2d8bb7a7189no rate change
Sheet revision, signing officer and layout. One municipal franchise agreement expiry extended to 12/31/2026; franchise fees are excluded from this encoding. No residential rate moved.
2026-09-11lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (122,469 -> 122,468 bytes, -1) · 6a3a6e1feba2 → ce4c991ad407no rate change
LIPA replaced its tariff book (July -> September). No rate moved: both books carry the same figures and the same delivery constants. The watched source was still pointing at July and has been repointed.
2026-09-10ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01content changed (108,726 -> 108,052 bytes, -674) · a3a1fb85ed4a → 9ada1bdf55f0no rate change
Navigation chrome only; this page carries tier structure and seasons, never prices. The Oct-Dec rates and factors moved on the two sibling pages and are recorded there.
2026-09-10ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01content changed (136,912 -> 136,363 bytes, -549) · 4fc2c0707913 → 8d8236f8c556re-encoded
LADWP's R-1A Total Consumption Charge gained its Oct-Dec row: 0.27292 / 0.33151 / 0.33151. Tier 3 falls because October leaves the high season AND adders rose. Scheduled for 1 October.
2026-09-10ladwp-r1a-zone1-2026-10-01, ladwp-r1a-zone2-2026-10-01content changed (93,248 -> 92,764 bytes, -484) · f19dae6bf274 → d8ae3e6db028re-encoded
LADWP published its Oct-Dec factors: adders 0.19266 -> 0.20150, i.e. +0.884 c/kWh on every kWh in both zones. Effective 1 October; encoded onto the scheduled shelf, so current rates are unaffected until then.
2026-09-09pseg-rs-2026-07-15, pseg-rs-tou-3p-2026-07-15content changed (1,731,866 -> 1,729,715 bytes, -2,151) · 7ebcd8b2d310 → 7ce40f28482dno rate change
PSE&G re-exported the PDF. The extracted text is identical character for character, so nothing in it changed - not a rate, not a schedule name, not an applicability list.
2026-09-08oconomowoc-rg1-2026-07content changed (155,318 -> 157,061 bytes, +1,743) · 7a7574f56ce2 → a6ee9e53ea54no rate change
Website chrome only. This page carries no rate figures at all, so it cannot evidence a rate change either way - see the tariff's known_gaps, which now says Oconomowoc is not effectively monitored.
2026-09-06dominion-va-schedule-1-2026-11-01content changed (219,233 -> 219,315 bytes, +82) · cc82f7c61f36 → 3319327f49c7no rate change
Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates.
2026-09-05duke-in-rs-2026-11-01content changed (318,690 -> 319,848 bytes, +1,158) · c3dcd7eb6369 → 4d2ae5f63bf0re-encoded
Duke Indiana added a September Credits Adjustment row: RS goes -0.006040 -> -0.005557, so the credit shrinks and the bill rises 0.000483 $/kWh, about $0.48/month at 1,000 kWh. Re-encoded as duke-in-rs-2026-09-01.
2026-09-05dominion-va-schedule-1-2026-11-01content changed (9,248,506 -> 9,249,299 bytes, +793) · 117a538f3348 → 2231c2aca3b3no rate change
No rate moved. Both captures carry all seven 09-01-2026 rider values and none of the 2025 ones - which is what proves the bill-calculator worksheet regressed rather than the rates changing.
2026-09-05dominion-va-schedule-1-2026-11-01content changed (219,315 -> 219,233 bytes, -82) · 3319327f49c7 → cc82f7c61f36no rate change
THE TARGET REGRESSED, NOT THE RATE. Dominion republished the worksheet with seven riders reverted from 09-01-2026 values to 09-01-2025 ones - C1A, C4A, OSW, RPS, SMR, SNA, T1: exactly the seven that moved on 09-03, worth +0.000461 $/kWh back the way they came. The filed tariff (entire-filed-tariff, same wave) still carries every 2026 value and none of the 2025 ones, so the encoding is correct and the reconciliation target is now stale. Recorded no_rate_change because no rate moved in the world. dominion_workbook.assert_not_regressed now REFUSES any capture whose newest rider date predates the encoding, so this cannot be used as a target until Dominion republishes - the failure mode being guarded against is moving the encoding to match a target that went backwards.
2026-09-04oge-ok-r1-2026-11-01content changed (642,897 -> 646,532 bytes, +3,635) · 6fbaf9cde3b9 → 3b35ba2a46b1no rate change
Earned all-clear: not one decimal number in the document moved, at any precision, and no value changed how often it occurs. A re-render.
2026-09-04nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01content changed (261,443 -> 261,249 bytes, -194) · 6cf99b790a5b → c8691d6937c7re-encoded
NSTAR Massachusetts, 1 September 2026, all 12 plans. Reconciling Rate Adjustment 0.02841 -> 0.03235, Electric Vehicle 0.00238 -> 0.00104, System Planning 0.00000 -> 0.00008. Base distribution unchanged. Re-encoded.
2026-09-04nstar-r1-cape-2026-09-01, nstar-r1-cape-delivery-2026-09-01, nstar-r1-mainland-2026-09-01, nstar-r1-mainland-delivery-2026-09-01content changed (85,403 -> 84,844 bytes, -559) · c59d1e5eec2c → ac507a4377f9re-encoded
NSTAR Massachusetts, 1 September 2026, all 12 plans. Reconciling Rate Adjustment 0.02841 -> 0.03235, Electric Vehicle 0.00238 -> 0.00104, System Planning 0.00000 -> 0.00008. Base distribution unchanged. Re-encoded.
2026-09-04entergy-texas-rs-2026-11-01content changed (52,918 -> 53,275 bytes, +357) · 557937ac111a → 803c57706d15re-encoded
Entergy Texas September 2026 sample bill. Two riders: SRC-2 0.0023500 -> 0.0027500, RCE-5 0.0001370 -> 0.0000000 (the line is still printed, at zero, so the rider exists and is encoded as 0.0 rather than deleted). Total 157.39 -> 157.65, reconciled exactly. Label moved to entergy-texas-rs-2026-09-01; the August set is frozen and still reconciled alongside it.
2026-09-04entergy-neworleans-res25-2026-11-01content changed (53,013 -> 52,950 bytes, -63) · 4beff9824232 → 7ec318a0cd80already encoded
Entergy New Orleans' September sample bill CONFIRMS the three factors shipped blind on 2026-09-01: EFRP 31.38610%, FAC 0.0181530, PPCR 6.695326%, to every decimal place - including the FAC column choice (Legacy ENO, not ENO Algiers 0.0179590), which was the one genuinely ambiguous reading. Reconciles to 158.04. Encoding unchanged; provenance now cites a real total.
2026-09-04entergy-mississippi-rs40c-2026-10-01content changed (54,968 -> 54,917 bytes, -51) · 53935c6bf6ec → fc222d375c94no rate change
Earned all-clear: not one decimal number in the document moved, at any precision, and no value changed how often it occurs. A re-render.
2026-09-04entergy-louisiana-rs-2026-11-01content changed (58,053 -> 57,929 bytes, -124) · ea6ce4435cf7 → 8434ecc9feadalready encoded
Entergy Louisiana's September sample bill confirms the four factors shipped on 09-01 before any total existed. Rebuilt line by line it comes to $147.35 exactly. Encoding unchanged, now reconciled rather than structurally checked.
2026-09-04entergy-arkansas-rs-2026-08-01content changed (54,702 -> 54,618 bytes, -84) · 1b4e6a31ceee → 2d133b2958fbno rate change
Earned all-clear: not one decimal number in the document moved, at any precision, and no value changed how often it occurs. A re-render.
2026-09-04apco-wv-rs-2026-09-01content changed (172,773 -> 168,483 bytes, -4,290) · 46ffc294e6a9 → f48f0adab25fre-encoded
APCo advanced its West Virginia typical bill to 1 September 2026: $183.07 at 1,000 kWh, $344.53 at 2,000. The September energy rate is derived from those totals, not transcribed - the filed tariff PDF has not moved.
2026-09-04pseg-rs-2026-07-15, pseg-rs-tou-3p-2026-07-15content changed (1,732,840 -> 1,731,866 bytes, -974) · f1f0800546ad → 7ebcd8b2d310no rate change
Earned all-clear: not one decimal number in the document moved, at any precision, and no value changed how often it occurs. A re-render.
2026-09-03oge-ok-r1-2026-11-01content changed (643,295 -> 642,897 bytes, -398) · e429c0e0b11e → 6fbaf9cde3b9no rate change
Triage: no figure moved at any precision - not one decimal number in the document changed, and no value changed how often it occurs. A re-render.
2026-09-03jcpl-rs-2026-10-01content changed (80,881 -> 81,212 bytes, +331) · 90c88b3acb1f → 0e1d95e84dd2no rate change
Triage: no figure moved at any precision - not one decimal number in the document changed, and no value changed how often it occurs. A re-render.
2026-09-03dominion-va-schedule-1-2026-11-01content changed (219,233 -> 219,315 bytes, +82) · cc82f7c61f36 → 3319327f49c7no rate change
Dominion's bill calculator reverted to its September version (byte-identical to the 6 Sep capture), dropping the November riders. The filed tariff still carries Rider E 0.0696c and PIPP 0.0158c from 1 November, so the encoding stays; the worksheet went backwards, not the rates.
2026-09-02dominion-va-schedule-1-2026-11-01content changed (9,137,677 -> 9,248,506 bytes, +110,829) · 72bc8515894a → 117a538f3348re-encoded
Three riders re-filed for usage on and after 09-01-26: C1A Peak-Shaving 0.0231c -> 0.0454c, C4A Energy Efficiency 0.1336c -> 0.1322c, SMR Small Modular Reactor 0.0287c -> 0.0147c. Each superseded figure matched the encoding to the digit, which is what identified the Schedule 1 row. Shipped as dominion-va-schedule-1-2026-09-01. The bill calculator worksheet - the only reconciliation target - re-fetched byte-identical to its 2026-08-21 capture and still prices the August riders, so check() reconciles against the frozen pre-September set and asserts separately that exactly those three moved. Net +0.0069 c/kWh, seven cents on 1,000 kWh.
2026-09-01psco-r-2026-08-29, psco-r-2026-10-01, psco-r-2026-10-19, psco-retou-2026-08-29content changed (3,161,074 -> 3,263,631 bytes, +102,557) · f33d53b3412c → 08ff17f819a3no rate change
Three sheets re-filed, narrowing what the rider may recover to non-fuel costs incremental to base rates. A definitional change; not one figure in the book moved.
2026-09-01lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (146,856 -> 147,320 bytes, +464) · d43c930eab32 → 8e7e8d69c931re-encoded
CORRECTED. Statement 117 raised LIPA's Power Supply Charge from 11.6387c to 13.9822c, up 20.1% - about $23/month at 1,000 kWh. Four plans served August's rate until 09-04 and are now re-encoded.
2026-09-01lipa-sc1-180-2026-11-01, lipa-sc1-194-2026-11-01, lipa-sc1-195-2026-11-01, lipa-sc1-580-2026-11-01content changed (122,464 -> 122,469 bytes, +5) · 43fbb53cf389 → 6a3a6e1feba2no rate change
Five bytes of CMS churn in a single-line HTML page. No decimal number moved at any precision.
2026-09-01fpl-rs1-2026-10-01content changed (1,015,649 -> 1,452,482 bytes, +436,833) · 768ed71047ec → 9766f7409a3calready encoded
FPL filed a one-month RS-1 storm-refund credit of 0.797 c/kWh for September. Already encoded: fpl-rs1-2026-09-01 carries it and fpl-rs1-2026-10-01 already restores the pre-refund rate.
2026-09-01jcpl-rs-2026-10-01content changed (80,936 -> 81,147 bytes, +211) · b1fd16843c11 → 0e9904916dfcno rate change
Boilerplate on the browser-support warning that fronts this page. No decimal number moved at any precision. jcpl-rs is unaffected.
2026-09-01entergy-neworleans-res25-2026-11-01content changed (90,780 -> 90,507 bytes, -273) · 698882aaae60 → d0ea4cc8b8c8re-encoded
Re-encoded as entergy-neworleans-res25-2026-09-01. Assembly proven against the August sample bill at 148.84; September factors unreconciled for the same reason. Bills 158.05 at 1,000 kWh.
2026-09-01entergy-neworleans-res25-2026-11-01content changed (103,759 -> 103,972 bytes, +213) · 21e0eb6fc9dc → adfb95b93219re-encoded
Re-encoded as entergy-neworleans-res25-2026-09-01. Assembly proven against the August sample bill at 148.84; September factors unreconciled for the same reason. Bills 158.05 at 1,000 kWh.
2026-09-01entergy-neworleans-res25-2026-11-01content changed (438,679 -> 116,997 bytes, -321,682) · fd93479872bb → 377cd7c2d5aare-encoded
Re-encoded as entergy-neworleans-res25-2026-09-01. Assembly proven against the August sample bill at 148.84; September factors unreconciled for the same reason. Bills 158.05 at 1,000 kWh.
2026-09-01entergy-neworleans-res25-2026-11-01content changed (78,545 -> 78,624 bytes, +79) · f3efd4da2d74 → 3311e8016118re-encoded
The September EAC row moved 0.000001 -> 0.000000 in a table where both values already appeared, so a set comparison could not see it. Re-encoded as entergy-neworleans-res25-2026-09-01 for the three factors that moved.
2026-09-01entergy-louisiana-rs-2026-11-01content changed (91,757 -> 91,884 bytes, +127) · 3e1ed1a496be → 533ccc4a517are-encoded
Re-encoded as entergy-louisiana-rs-2026-09-01. Assembly proven against the August sample bill at 139.80; the September factors are transcribed from the filing and reconciled against nothing, because Entergy has published no September bill. Bills 147.33 at 1,000 kWh.
2026-09-01entergy-louisiana-rs-2026-11-01content changed (77,497 -> 77,517 bytes, +20) · be2e15e19e07 → 693b5be3e453re-encoded
Re-encoded as entergy-louisiana-rs-2026-09-01. Assembly proven against the August sample bill at 139.80; the September factors are transcribed from the filing and reconciled against nothing, because Entergy has published no September bill. Bills 147.33 at 1,000 kWh.
2026-09-01entergy-louisiana-rs-2026-11-01content changed (888,030 -> 515,509 bytes, -372,521) · 4fb57900e619 → 108ddd5a5cb9re-encoded
Re-encoded as entergy-louisiana-rs-2026-09-01. Assembly proven against the August sample bill at 139.80; the September factors are transcribed from the filing and reconciled against nothing, because Entergy has published no September bill. Bills 147.33 at 1,000 kWh.
2026-09-01entergy-louisiana-rs-2026-11-01content changed (728,718 -> 731,954 bytes, +3,236) · a53bfe619433 → dfd1f7ae9aabre-encoded
Re-encoded as entergy-louisiana-rs-2026-09-01. Assembly proven against the August sample bill at 139.80; the September factors are transcribed from the filing and reconciled against nothing, because Entergy has published no September bill. Bills 147.33 at 1,000 kWh.
2026-09-01entergy-louisiana-rs-2026-11-01content changed (91,760 -> 91,740 bytes, -20) · 3dc1b34a361d → 93c276793853re-encoded
Re-encoded as entergy-louisiana-rs-2026-09-01. Assembly proven against the August sample bill at 139.80; the September factors are transcribed from the filing and reconciled against nothing, because Entergy has published no September bill. Bills 147.33 at 1,000 kWh.
2026-09-01duke-fl-rs1-2026-10-01content changed (116,556 -> 192,878 bytes, +76,322) · 988e3e1c8fc6 → 58c1df6cecd2re-encoded
Duke Florida Sheet 6.105, 114th revision: RS-1 Asset Securitization Charge 0.228 -> 0.238 c/kWh, about $0.10 on a 1,000 kWh bill. Re-encoded as duke-fl-rs1-2026-09-01.
2026-09-01duke-carolinas-sc-rs-2026-11-01content changed (190,820 -> 92,922 bytes, -97,898) · 454d9a67fd93 → 563902d9918cre-encoded
Re-encoded as duke-carolinas-sc-rs-2026-09-01. SC First Revised Leaf No. 101 moved the storm rate 0.4583 to 0.4670, read off the row labelled Residential ES, RE, RETC, RS, R-STOU, RSTC. scridersummary did not change so the five SC riders hold. Tiers 14.5212/15.1748 to 14.5299/15.1835 c/kWh.
2026-09-01duke-carolinas-nc-rs-2026-09-01content changed (177,287 -> 171,786 bytes, -5,501) · bc58a42cd632 → 6f1d9a3e197dre-encoded
Re-encoded as duke-carolinas-nc-rs-2026-09-01. NC Sixty-Ninth Revised Leaf No. 99 moved Fuel Cost Adjustment 0.2841 to 0.4921 and CPRE 0.0468 to 0.0273, TOTAL 1.7371 to 1.9256. Unlike Entergy this RECONCILES: the leaf prints its own total and the twelve components sum to it. Rate 14.1782 to 14.3667 c/kWh.
2026-09-01duke-carolinas-nc-rs-2026-09-01content changed (187,056 -> 95,516 bytes, -91,540) · 57613605938a → c3e4ad1c8a77re-encoded
Covered by duke-carolinas-nc-rs-2026-09-01. NC Eighteenth Revised Leaf No. 68 moved the regulatory fee multiplier 1.001703 to 1.001502 and nothing else; 1.37 x 1.001502 still rounds to the 1.37 billed, so the encoded value is unchanged and that is recorded in the constant.
2026-09-01dominion-va-schedule-1-2026-11-01content changed (111,953 -> 111,638 bytes, -315) · 3c0e020927d9 → 4c88430e6d4dno rate change
The exhibit carries no rates, only rider names and dates - and thirteen dates rolled to 09-01-26, signalling Dominion re-filed those riders. Their own rate documents are watched separately and drove the re-encode.
2026-09-01nyseg-sc1-2026-09-01, nyseg-sc1-2026-10-01, nyseg-sc1-2026-11-01content changed (130,581 -> 130,606 bytes, +25) · 56e0656d88be → 81874a6b4524already encoded
ETS rolled TCS-263 -> TCS-264 on its effective date. Filed 08/17, encoded 08/31, effective 09/01. Rate movement 0.105005 -> 0.102396 equals the transition charge swing exactly.
2026-08-31ohio-edison-gs-2026-10-01, ohio-edison-rs-2026-09-01, ohio-edison-rs-2026-10-01content changed (9,462,305 -> 9,420,904 bytes, -41,401) · 6687904670eb → 556ab6b74b89re-encoded
Rider DCR 0.1176c -> 0.1046c, 58th Revised Sheet 124; scheduled as ohio-edison-rs-2026-09-01
2026-08-31sdge-dr-2026-08-01content changed (7,030 -> 7,077 bytes, +47) · cb14fc4056a8 → 4eaf0e1793abno rate change
SDG&E cleared its pending-sheet queue; EFFECT_* to null on all 16 schedules, DR's CURRENT_* identical, no 9-1-26 rates table exists
2026-08-31bge-r-2026-10-01content changed (231,439 -> 232,854 bytes, +1,415) · 8ad0ac7016a0 → e0fb2fc3401eno rate change
Suppl. 751->752 eff 09/01/26; Type II SOS commercial rates moved, Schedule R unchanged at 12.032/12.507
2026-08-29pge-eelec-2026-06-01content changed (577,201 -> 578,052 bytes, +851) · a515ec2cd50d → 58d2bebe3aa8no rate change
PG&E re-filed E-ELEC under Advice 7975-E, but only the applicability sheet moved. The rate sheet this encoding cites (61363-E) was not re-filed and no rate changed.

Source checks, last 90 days

Whether the monitor ran each day. A gap is a day when staleness could not be ruled out. This is not an uptime chart - uptime is the wrong question for a data product. A day counts as checked whether or not anything changed, because a quiet day and a broken monitor must not look alike.

88 of 90 days checked since the first run on 2026-08-24 — 2 day(s) missed: 2026-10-23, 2026-11-21. A missed day is one where staleness could not be ruled out. Hover a cell for the date and how many of the 399 watched sources were checked that day.

How fast do filings get encoded? (all time)

Time from detecting that a utility filed a change to the served rates being updated. This bounds how out-of-date any figure here can be, and it is computed from the record rather than promised.

Measured over every filing since launch, not the window above. Rate changes arrive roughly quarterly, so a 90-day window would usually contain too few to mean anything - and a median over one sample would look like precision it does not have.

Median time to update
0 days
Slowest
8 days
Filings measured
100
Encoded for a future date
3
Encoded before the document moved
20
Reviewed, changed no rate
142
Change seen, nothing published to confirm it
1
No longer watched
2

Time from detecting a filing to the encoded rates being updated. Pending means detected and not yet encoded; filings reviewed as changing no rate, those encoded ahead of a future effective date, those already encoded before the source document changed at all, and those read but not yet confirmed by the filed source, are counted separately rather than averaged in.

Why this page exists

Every rate API claims to be current, and from the outside that claim cannot be checked. This one can: the source documents are polled daily, every version is kept, and when a utility files something we have not encoded yet this page says so by name. A status page that can only report good news is marketing.

Browse rates · GET /health returns this page's summary as JSON, without a key. GET /changes returns the change log as JSON, and needs one.